IE Insp Repts 50-010/80-16,50-237/80-19 & 50-249/80-23 on 800922-26.Noncompliance Noted:Failure to Maintain Records of Proper Screening Documentation on Contractor Personnel. Details Withheld (Ref 10CFR2.790)
ML19338G351
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 10/21/1980
From: Belanger J, Christoffer G, Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19338G347 List:
References
50-010-80-16, 50-10-80-16, 50-237-80-19, 50-249-80-23, NUDOCS 8010290125
Download: ML19338G351 (2)


Text

(JD

l

'

"

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report Nos. 50-10/80-16; 50-237/80-19; 50-249/80-23 Docket No. 50-10; 50-237; 50-249 License No. DPR-2; DPR-19; DPR-25 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Dresden Nuclear Power Station, Units 1, 2 and 3 Inspection At: Dresden Site, Morris, Illinois Inspection Conducted: September 22-26, 1980 Date of Last Physical Security Inspection:

October 9-12, October 15-18, and October 31, 1979 Type of Inspection: Unannounced Physical Security

.,

.

ag il [O Inspectors:

~L.

Belanger

%

Da':e e

.

'

VJ.

Physical Security rpecialist b,

10/2/T0

.

'. M. Christoffe?" W jate Physical Security SYecialist

/[

D Approved:

J.

.

teu A. Hind, Chief Date Safeguards Branch Inspection Summary Areas Inspected:

Included a review of Security Plan; Security Program Audit; Security Organization; Protected Area Physical Barriers; Vital Area Physical Barriers; Lighting Access Control (Identification, Authoriza-tion and Badging); Access Control (Search); Access Control Escorting; Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response: Locks, Keys, and Combinations; Records and Reports; Followup on Previous Items of Noncompliance / Deviations; 8010290 12 E

_..

_

a

'

The inspection involved 84 inspector hours onsite by 2 NRC inspectors.

'

The inspection began during day shift period; 26 inspection hours were accomplished during offshift periods.

Results: The Licensee was found to be in compliance with NRC require-ments within the above areas examined during this inspection except for the following one item.

Access Control - Identification; Authorization and Badging) - Licensee records failed to contain proper screening documentation on certain contractor personnel.

(Details Part 2.790(d) Information)

!