Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-249/80-09
ML17192A824
Person / Time
Site: Dresden Constellation icon.png
Issue date: 07/17/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17192A825 List:
References
NUDOCS 8007240291
Download: ML17192A824 (2)


Text

.,,......---:

.I UNITED STATES 1NUCLEAR REGULATORY COMMISSION REGION Ill 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS G0137 Docket No. 50-237 Docket No. 50-249 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

'JUL 1 7 1980

'CENTRAL Fl,.LES Thank you for your letter dated June 13, 1980, informing us of your response to the unresolved items which we brought to your attention in Inspection Report No. 50-249/80-09 forwarded by our letter dated April 26' 198 We have no further questions on your evaluation of the Unit 3 Reactor Water Cleanup System (RWCU) water hammer damage and the proposed re-inspection pla However, an inspection of the Unit 2 RWCU for similar problems should be conducted by you during the next extended plant outag We received your prompt notification reports stating that plans are underway to repair the CRD Sc.ram Discharge seismic Category 1 piping component support.s that are attached to non-se{smic category structure We will examine this matter during a subsequent inspectio The NRC has had numerous discussions with your technical staff in regard to our inspector's questions r~lative to the design of the CRD System seismic restraint These discussions have prompted the need for clari-fication in the following areas: Since design arid installation documents for the CRD System small bore piping were not available after your extensive record search, when will you be initiating efforts to evaluate the existing in-stallation for the SSE loading conditions? Based on a review of your previous submittals, we have noted that certain sections of.the CRD System piping near the reactor vessel pedestal appear to be within the pipe resonance rang Your sub-mittals do not provide a sufficient basis for us to conclude that the design meets FSAR commitment Consequently, additional evalua-tion of design adequacy is requeste ~~91

'*

-1-Pleue ~09tde tJd.. offica-withiB Wrty.. Y* of Jou:r ncatpt-ef*dd9 letter* die a4clit1onal actiou 'foa Jaine tabla or plan eo cake with nprd to tbue -ttara. V. w1U &lMlJ 4SKM* U1 41Wd.w,_ aay.

..,,..

ce: llr. D. L. *eoplu, Dinctor of hclear l.ianaiag llr. a. I. ltepheuoa, Station~t cc v/ltr *bl 6/13/80:

CenUa1 l'il.e9 leproclaction lait DC %0b PD toca1 PD ISIC nc llr~ Deau *aMll, Office of Auuuat AttorMJ Gaeral NRC Form 3188 (Rm) (1*78) NRCM 0240

""..