IE Insp Rept 50-010/80-17 on 801008-10.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Storage & Internal Controls.Details Withheld (Ref 10CFR2.790)
ML19351D769
Person / Time
Site: Dresden Constellation icon.png
Issue date: 10/30/1980
From: Finley A, Hind J, Patterson J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19351D767 List:
References
50-010-80-17, 50-10-80-17, NUDOCS 8011200012
Download: ML19351D769 (1)


Text

-

,

h U.S. NUCLEAR REGULATORY COMMISSION

)

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No.

50-10/80-17 Docket No. 50-10 License No. DPR-2 Safeguards Group 2 Licensee:

Commonwealth Edison Company P. O. Box 767 Chicago, IL 60690 Facility Name:

Dresden Nuclear Power Station, Unit 1 Inspection At: Dresden Site, Morris, IL Inspection Conducted: October 8-10, 1980 Date of Last Material Control and Accounting Inspection: August 8-10, 1978 Type of Inspection: Unannounced Material Control and Accountability Inspectors:

h.d.

/A[Jo[gd W G. Finley Date Auditor

/Obef$8

,u p

. P. Patterson Date

'

Chemist

/8! /d Approved by:

_

_A.

liind, Chief Date

.

Safeguards Branch Inspection Summary Inspection on October 8-10, 1980 (Report No. 50-10/80-17)

Areas Inspected: Facility organization and operation, measurement and controls, storage and internal controls, shipping and receiving, inven-tory, records and reports, and management of material control system.

The inspection involved 40 inspection-hours onsite by two hTC inspectors and was begun during the regular hours.

Results: The licensee was found to be in compliance with h3C requirements

,

in the seven areas examined during the inspeccion.