IR 05000010/1980017
| ML19351D769 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 10/30/1980 |
| From: | Finley A, Hind J, Patterson J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19351D767 | List: |
| References | |
| 50-010-80-17, 50-10-80-17, NUDOCS 8011200012 | |
| Download: ML19351D769 (1) | |
Text
-
,
h U.S. NUCLEAR REGULATORY COMMISSION
)
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No.
50-10/80-17 Docket No. 50-10 License No. DPR-2 Safeguards Group 2 Licensee:
Commonwealth Edison Company P. O. Box 767 Chicago, IL 60690 Facility Name:
Dresden Nuclear Power Station, Unit 1 Inspection At: Dresden Site, Morris, IL Inspection Conducted: October 8-10, 1980 Date of Last Material Control and Accounting Inspection: August 8-10, 1978 Type of Inspection: Unannounced Material Control and Accountability Inspectors:
h.d.
/A[Jo[gd W G. Finley Date Auditor
/Obef$8
,u p
. P. Patterson Date
'
Chemist
/8! /d Approved by:
_
_A.
liind, Chief Date
.
Safeguards Branch Inspection Summary Inspection on October 8-10, 1980 (Report No. 50-10/80-17)
Areas Inspected: Facility organization and operation, measurement and controls, storage and internal controls, shipping and receiving, inven-tory, records and reports, and management of material control system.
The inspection involved 40 inspection-hours onsite by two hTC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with h3C requirements
,
in the seven areas examined during the inspeccion.