Forwards IE Insp Repts 50-010/80-16,50-237/80-19 & 50-249/80-23 on 800922-26 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790)
ML19338G346
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 10/22/1980
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19338G347 List:
References
NUDOCS 8010290120
Download: ML19338G346 (2)


See also: IR 05000010/1980016

Text

_,

-

, - . -

-

-

Tic!

.

b

># F84

UNITEn STATES

9[',,

NUCLEAR REGULATORY COMMISSION

+

,

t

. rt.

g

o

REGloN IH

. .'

5

"f

799 ROOSEVELT ROAD

'

/

GLEN ELLYN,ILUNOIS 60937

.....

,

1

W22E

Docket No. 50-10

Docket No.30-237

Docket No. 50-249

i

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

j

Chicago, IL 60690

Gentlemen:

This refers to the routine physical security inspection conducted by

Mr. J. L. Belanger and Ms,

G. M. Christoirer of this office on

September 22-26, 1980, of activities at Dresden Nuclear Power Station,

l

Units 1, 2 and 3 authorized by NRC Operating Licenses No. DPR-2, No.

'

DPR-19, and No. DPR-25 and to the discussion of our findings with

Mr, D. Scott and other members of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas eramined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and rcpresentative records, obser-

vations, and interviews with personnel.

x

During this inspection, certain of your activities appeared to be in

4

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provieions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

twenty days of your receipt of this notice a written st.atement or expla-

nation in reply, including for each item of noncompliance: (1) correc-

tive action taken and the results achieved; (2) corrective action to be

,

i

taken to avoid further noncompilance; and (3) the date when full com-

pliance will be achieved.

4

d

MIACHMENT CONIAINS

l

1(CFR 2.790 (d) Inf0RMAll0N

k

l

8010 29 o

< l 2 0 -

_

.

_

-.

-

.

- ..

- - -

-

.

-

-

.

.

>

G:mmonwealth Edison Company

-2-

Areas examined during this inspection concern a subject matter which is

from disclosure according to Section 2.790 of the NRC's " Rules of

exempt

Practice," Part 2, Title 10, Code of Federal Regulations.

Consequently,

the enclosu,re to this letter, our report of this inspection, and your

response to the noncompliance identified in the enclosure to this letter

will not be placed in the Public Document Room.

Therefore, your state-

ment of corrective action regarding the noncompliance identified in the

enclosure should be submitted as a separate enclosure to your trans-

mittal letter.

We vill gledly discuss any questions you have concerning this inspection.

Sincerely,

>dhE

.tYch

J. A. Hind, Chief

Safeguards Breach

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

Fo. 50-10/80-16,

No. 50-237/80-19

No. 50-249/80-23

(Part 2.790(d) Information)

cc w/encls:

Mr. J. S. Abel, Director

of Nuclear Licensing

Mr. D. J. Scott,

Station Superintendent

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

cc w/ cover page, w/o

Part 2.790(d) Information:

PDR

Local PDR

NSIC

TICor

Mr. Dean Hansell, Office of

Assistant Attorney General