ML19338G346
| ML19338G346 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 10/22/1980 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19338G347 | List: |
| References | |
| NUDOCS 8010290120 | |
| Download: ML19338G346 (2) | |
See also: IR 05000010/1980016
Text
_,
-
, - . -
-
-
Tic!
.
b
># F84
UNITEn STATES
9[',,
NUCLEAR REGULATORY COMMISSION
+
,
t
. rt.
g
o
REGloN IH
. .'
5
"f
799 ROOSEVELT ROAD
'
/
GLEN ELLYN,ILUNOIS 60937
.....
,
1
W22E
Docket No. 50-10
Docket No.30-237
Docket No. 50-249
i
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
j
Chicago, IL 60690
Gentlemen:
This refers to the routine physical security inspection conducted by
Mr. J. L. Belanger and Ms,
G. M. Christoirer of this office on
September 22-26, 1980, of activities at Dresden Nuclear Power Station,
l
Units 1, 2 and 3 authorized by NRC Operating Licenses No. DPR-2, No.
'
DPR-19, and No. DPR-25 and to the discussion of our findings with
Mr, D. Scott and other members of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas eramined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and rcpresentative records, obser-
vations, and interviews with personnel.
x
During this inspection, certain of your activities appeared to be in
4
noncompliance with NRC requirements, as described in the enclosed
Appendix A.
This notice is sent to you pursuant to the provieions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
twenty days of your receipt of this notice a written st.atement or expla-
nation in reply, including for each item of noncompliance: (1) correc-
tive action taken and the results achieved; (2) corrective action to be
,
i
taken to avoid further noncompilance; and (3) the date when full com-
pliance will be achieved.
4
d
MIACHMENT CONIAINS
l
1(CFR 2.790 (d) Inf0RMAll0N
k
l
8010 29 o
< l 2 0 -
_
.
_
-.
-
.
- ..
- - -
-
.
-
-
.
.
>
G:mmonwealth Edison Company
-2-
Areas examined during this inspection concern a subject matter which is
from disclosure according to Section 2.790 of the NRC's " Rules of
exempt
Practice," Part 2, Title 10, Code of Federal Regulations.
Consequently,
the enclosu,re to this letter, our report of this inspection, and your
response to the noncompliance identified in the enclosure to this letter
will not be placed in the Public Document Room.
Therefore, your state-
ment of corrective action regarding the noncompliance identified in the
enclosure should be submitted as a separate enclosure to your trans-
mittal letter.
We vill gledly discuss any questions you have concerning this inspection.
Sincerely,
>dhE
.tYch
J. A. Hind, Chief
Safeguards Breach
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
Fo. 50-10/80-16,
No. 50-237/80-19
No. 50-249/80-23
(Part 2.790(d) Information)
cc w/encls:
Mr. J. S. Abel, Director
of Nuclear Licensing
Mr. D. J. Scott,
Station Superintendent
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
cc w/ cover page, w/o
Part 2.790(d) Information:
Local PDR
TICor
Mr. Dean Hansell, Office of
Assistant Attorney General