Category:NOTICE OF VIOLATION OF A REGULATION
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000264/19992011999-08-10010 August 1999 Insp Rept 50-264/99-201 on 990712-15.No Violations Noted. Major Areas Inspected:Operations Program,Organizational Structure & Functions Program,Design Control Program,Review & Audit Program & Radiation Protection Program ML20202B0501998-02-0505 February 1998 Insp Repts 50-254/98-02 & 50-265/98-02 on 980112-16. Violations Noted.Major Areas Inspected:Review of ALARA Planning,Radiation Work Permits & Observations of Radworker Performance IR 05000264/19972011997-12-18018 December 1997 Insp Rept 50-264/97-201 on 971202-03.No Violations or Deviations Noted.Major Areas Inspected:Aspects of Surveillance,Experiments,Radiation Controls,Design Change & Emergency Preparedness (69001) IR 05000264/19970011997-04-23023 April 1997 Insp Rept 50-264/97-01 on 970407-11.No Violations Noted. Major Areas Inspected:Organization,Periodic & Special Repts, Operations & Maint,Operations & Maint Procedures, Requalification Training,Surveillance & Experiments IR 05000264/19900011990-08-0101 August 1990 Insp Rept 50-264/90-01 on 900709-11.No Violations or Deviations Noted.Major Areas Inspected:Organization,Logs, Review & Audit Functions,Requalification Training, Procedures,Surveillance & Emergency Planning IR 05000264/19890021989-09-0707 September 1989 Insp Rept 50-264/89-02 on 890829-30.No Violations Noted. Major Areas Inspected:Snm Control & Accountability Including Possession & Use of SNM & Accounting of Snm,Review of Facility Organization & Operation & Shipping & Receiving IR 05000264/19890011989-09-0505 September 1989 Physical Security Insp Rept 50-264/89-01 on 890829-30.No Violations Noted.Major Areas Inspected:Review of Approved Security Plan,Including Plans,Procedures,Revs,Repts of Safeguards Events & Physical Protection of SNM ML20237E1521987-12-22022 December 1987 Exam Rept 50-264/OLS-87-01 on 871201-02.Exam Results: Candidate Passed IR 05000264/19860011986-12-0404 December 1986 Insp Rept 50-264/86-01 on 861118-21.No Violations or Deviations Noted.Major Areas Inspected:Records,Logs & Organization,Review & Audit Functions,Requalification Training,Procedures,Surveillance Activities & LERs IR 05000264/19850021985-06-12012 June 1985 Matl Control & Accountability Insp Rept 50-264/85-02 on 850603-04.No Noncompliance Noted.Major Areas Inspected: Possession & Use of SNM & Control & Accounting of Snm. Details Withheld (Ref 10CFR2.790) IR 05000264/19850011985-06-12012 June 1985 Insp Rept 50-264/85-01 on 850603-04.No Noncompliance Noted. Major Areas inspected:781005 Security Plan.Details Withheld (Ref 10CFR2.790) IR 05000264/19830011983-04-29029 April 1983 Sanitized Version of Matl Control & Accounting Insp Rept 50-264/83-01 on 830405-06.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Measurement & Statistical Control & Storage & Internal Controls ML20249A9411979-01-16016 January 1979 PNS-78-004:inspectors from Region III Entered Research Reactor Bldg Through Unlocked Rear Door W/O Challenge on 780110-12.Ltr Was Sent to Licensee to Assure Institution of Positive Access Controls to Reactor Bldg IR 05000264/19780041978-12-27027 December 1978 Sanitized Version of Insp Rept 50-264/78-04 on 781116 & 17. No Noncompliance Noted.Major Areas Inspected:Snm Control & Accountability,Including Facility Organization & Operation, Measurement & Controls,Inventory & Shipping & Receiving ML20205E5731978-07-12012 July 1978 Notice of Violation from Insp on 780110-12.Portions Deleted (Ref 10CFR2.790) IA-85-259, Notice of Violation from Insp on 780110-12.Portions Deleted (Ref 10CFR2.790)1978-07-12012 July 1978 Notice of Violation from Insp on 780110-12.Portions Deleted (Ref 10CFR2.790) IR 05000264/19780011978-07-11011 July 1978 Insp Rept 50-264/78-01 on 780110-12.Noncompliance Noted Re Security Organization & Access Controls.Portions Deleted (Ref 10CFR2.790).Written Statement in Reply to Notice of Violation Encl IR 05000264/19780021978-06-0606 June 1978 Insp Rept 50-264/78-02 on 780503-04.No Noncompliance or Deviations Identified.Areas Inspected:Radwaste Mgt & Radiation Protection Program,Including Qualifications, Audits,Training,Equipment & Instruments ML20205E3561978-01-16016 January 1978 PNS-III-78-004:on 780110,during Physical Security Insp,Lack of Positive Access Controls to Reactor Bldg Discovered. Portions Deleted (Ref 10CFR2.790).Related Draft Documents Encl IR 05000264/19770031977-08-24024 August 1977 Insp Rept 50-264/77-03 on 770809-11.No Noncompliance or Deviations Identified.Areas Inspected:Emergency Planning, Including Review of Emergency Plan & Implementing Procedures & Interviews W/Licensee Personnel IR 05000264/19770021977-08-17017 August 1977 Insp Rept 50-264/77-02 on 770719-22,26 & 27.No Noncompliance Noted.Major Areas Inspected:Reactor Startup & Routine Operation IR 05000264/19770011977-05-11011 May 1977 Insp Rept 50-264/77-01 on 770425-26.No Noncompliance or Deviations Identified.Area Inspected:Facilities & Equipment, Organization,Training,Radiation Protection Procedures & Health Physics Instrumentation IR 05000264/19760031976-04-20020 April 1976 Insp Rept 50-264/76-03 on 760407.No Noncompliance Identified.Area Inspected:Radiation Protection & Radwaste Programs,Including Records,Procedures,Equipment Inventory & Interviews W/Personnel ML20137D3221976-03-24024 March 1976 Matls & Safeguards Insp Rept 50-264/76-01 on 760303-04.No Noncompliance Noted.Major Areas Inspected:Physical Inventory & Verification,Review of SNM Records,Depletion Calculations, Matl Transaction Forms & Matl Status Repts ML20205E3111976-02-10010 February 1976 Notice of Violation from Physical Protection Insp on 760115-16.Portions Deleted IR 05000264/19760011976-02-0606 February 1976 Physical Protection Insp Rept 50-264/76-01 on 760115-16. Noncompliance Noted Re Communications & Access Control. Portions Withheld (Ref 10CFR2.790) IR 05000264/19750011975-10-15015 October 1975 Insp Rept 50-264/75-01 on 750922-24.No Noncompliance Noted. Major Areas Inspected:Reactor Operations,Maint, Implementation of Modified Operator Requalification Program & Corrective Action on Noncompliance Item 73-01 IR 05000264/19740011974-04-0202 April 1974 RO Insp Rept 50-264/74-01 on 740306 & 07.No Violations Noted.Areas Inspected:Personnel Monitoring,Surveys & Survey Instruments,Rabbit Sys,Radwaste,Area Radiation Monitor,Water Monitor & Continuous Air Monitor IR 05000264/19730011973-10-24024 October 1973 Insp Rept 50-264/73-01 on 730920 & 21.Violations Noted: Reactor Operated W/Greater than 1.5% Delta K/K Excess Reactivity on 730125 Change to Operating Procedure Inserted in Operating Log,W/O Formal Approval ML20137G6141971-06-22022 June 1971 Insp Rept 50-264/71-01 on 710602.No Deficiencies or Unresolved Items Found.Major Areas Inspected:Reporting Requirements Per 10CFR50.59 & Div of Compliance Procedures for Documentation,Records,Reactivity Control & Core Physics ML20136H1721971-06-0202 June 1971 Expanded Field Notes for Co Rept 50-264/71-01 on 710602. Areas Discussed:Administration & Organization Operations, Facility Procedures,Primary Sys,Reactor Controls & Core Physics,Functional Tests,Safety Circuitry & Core Internals ML20136H0411969-04-15015 April 1969 Co Insp Rept 50-264/69-01 on 690402.No Safety,Noncompliance or Unusual Occurrences Noted.Areas Inspected:Reactor Operation ML20137G9081968-10-17017 October 1968 Insp Rept 50-264/68-01 on 680926.No Noncompliance Noted. Major Areas Inspected:Visual Insp of Fuel Elements & Control ML20137G9261967-11-0707 November 1967 Insp Rept 50-264/67-03 on 671025-26.No Noncompliance Noted. Major Areas Inspected:Reviews of Reactor post-critical Performance Data & Appropriate Log Books,Observation of Startup & Discussions W/Personnel ML20137G4781967-07-14014 July 1967 Insp Rept 50-264/67-02 on 670630.No Safety Items or Noncompliance Noted.Major Areas Inspected:Completion of Unresolved Items Listed in App B to Insp Rept 50-264/67-01. Initial Criticality Observed During 670705-06 Visit ML20137G4171967-06-26026 June 1967 Insp Rept 50-264/67-01 on 670620 & 21.Deviations Noted: Manually Operated Louvres Installed as Backup to Automatic Louvres in Ventilation Intake & Exhaust Ducts & Reactor Room Area Monitor Placed on East Wall Rather than CRD Platform 1999-08-10
[Table view] |