Text
(
Part 2,790[6] InforestlGO Appendix A NOTICE OF VIOLATION Docket No. 50-26!.
Dow Che:ical Company 10-12, 1978, it appears Based on the inspection conducted on January that certain of your activities were in noncompliance with NRC require-Items 1 and 2 are infractions and item 3 is ments, as noted below.
a deficiency.
Contrary to Section 3.3.7(B) of the revised Security Plan for976, the Dov TBIGA Jteactor Facility which was approved April 2,1 1.
jvas not controlled on January 10, 1976, access to,( inspectors gained undetected and unchallenged accees in that NRC linto the limited access area and further throughJheI isnd the reac or room, t
into the, t
Contrary to Section 3.3.7(C)(1) of the revised Security Plan for the Dow TRIGA Research Reactor Facility which was approved 2.
a Dow was observed on January 10, 197h that April 2,1976,
] other than a permanentf ' ]
ecployee in the e=ployee, was not carrying or displaying his Dow photo identitf]badgeandhadnotidentifiedhimselfasaDowemployee 1
by signing in as he entered the building.
Contrary to Section 3.2.5(5) of the revised Security Plan for the Dow TRIGA Reactor Facility which was approved April 2,1976, 3.
according to information available in training records and obtained through interviews, officers of the plant protection and security force have attended requalification sessions only on an annual basis.
S-T3-78-J23 Cop _ 'I of k copies Page.
8510170329 851004 THIS DOCUMENT IS NOT TO BE POR FOIA REPRODUCED WITHOUT SPECIFIC KOHN85-259 PDR APPROVAL OF RIII.