IR 05000264/1985001

From kanterella
Jump to navigation Jump to search
Insp Rept 50-264/85-01 on 850603-04.No Noncompliance Noted. Major Areas inspected:781005 Security Plan.Details Withheld (Ref 10CFR2.790)
ML20126C651
Person / Time
Site: Dow Chemical Company
Issue date: 06/12/1985
From: Belanger J, Creed J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19344C026 List:
References
50-264-85-01, 50-264-85-1, NUDOCS 8506140489
Download: ML20126C651 (1)


Text

_

- ,

U.S. NUCLEAR REGULATORY COP 9 FISSION

,

REGION III

.

Report No. 50-264/85001(DRSS)

Docket No. 50-264 License No. R-108 Safeguards Group V Licensee: Dow Chemical Company Buf1 ding 1803 Midland, MI 48640 Facility Name: Dow TRIGA Research Reactor Facility Inspection At: Dow TRIGA Research Reactor Facility, Building 1602, Midland, MI Inspection Conducted: June 3-4, 1985 Date of Last Physical Security Inspection: December 7-10, 1981 Type of Inspection: Unannounced Physical Security Inspectors: }. L.LNm Belanger Physical Security Inspector c h in'

Date L

'

,' j , klMW Physical Security Inspector Date 3- 0

'

h Approved By: J. R. Creed, Chief (dlND-Safeguards Section Date Inspection Summary Inspection on June 3-4, 1985 (Report No. 50-264/oS001(DRSS))

Areas Inspected: Included a review of the approved " Security Plan for the Dow TRIGA Facility" dated October 5, 1978. The inspection involved 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> onsite by two NRC inspectors. The inspection began during the day shif Results: The licensee was found to be in compliance with NRC requirements within the area examined during this inspectio (Details - PART 2.790(d) INFORMATION)

M M ! MPDR 64 ATTACHIEllT CONTAlilS 10 CFR 2.790(d) IllF0