MONTHYEARML0219800262002-07-0808 July 2002 Safety Analysis Report Errata #2, Appendix K Measurement Uncertainty Recovery - Power Uprate (TAC MB3972, Ldc 2002-074) Project stage: Other GNRO-2002/00063, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072)2002-07-22022 July 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072) Project stage: Supplement ML0221001632002-08-0909 August 2002 Request for Withholding Information from Public Disclosure MB3972 Project stage: Withholding Request Acceptance ML0221000962002-08-26026 August 2002 Withholding from Public Disclosure, Errata and Addenda to NEDC-33048P, Thermal Power Optimization Report, MB3972 Project stage: Other ML0223303972002-08-28028 August 2002 Letter, Draft Safety Evaluation Power Uprate Project stage: Draft Approval GNRO-2002/00085, /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074)2002-09-16016 September 2002 /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074) Project stage: Other GNRO-2002/00084, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request2002-09-16016 September 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request Project stage: Supplement ML0226900672002-09-24024 September 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request ML0228103192002-10-0202 October 2002 GE Request for Withdrawal of Proprietary Information from Public Portion of ADAMS Project stage: Withdrawal ML0228103232002-10-0303 October 2002 GE Request for Withdrawal of Proprietary Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withdrawal ML0226702792002-10-0707 October 2002 Request for Withholding, NEDC-33048P, Revision 2, Safety Analysis Report for Grand Gulf Nuclear Station Thermal Power Optimization, Dated October 2002 Project stage: Other ML0226303042002-10-10010 October 2002 Unit One, Amendment 156 to License NPF-29, Increasing Licensed Power Level by Approximately 1.7% from 3,833 Megawatts Thermal (Mwt) to 3,898 Mwt Project stage: Acceptance Review ML0228902842002-10-10010 October 2002 1.7% Uprate, TAC No. MB3972, Revised FOL Page 4 and TS Page 1.0-5, Amendment 156 Project stage: Other ML0229102262002-10-15015 October 2002 Request for Withholding Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withholding Request ML0231105182002-11-22022 November 2002 Grand Gulf, Ltr, Withdrawal of GE Proprietary Reports NEDC-33038P, Rev 0, January 2002, Rev. 1, September 2002, and Non-Proprietary Report NEDC-33038, Rev. 1, September 2002 Project stage: Withdrawal 2002-07-22
[Table View] |
|
---|
Category:Letter type:GNRO
MONTHYEARGNRO-2013/00079, 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013)2023-10-11011 October 2023 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013) GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes 2023-06-06
[Table view] |
Text
IJfA Enlergy Operations, Inc.
'@3fEntergy POBox 756 Port Gibson. MS 39150 Tel 601 437 6409 Fax 601 437 2795 William A. Ealon Vice President.
Operations Grand Gulf Nuclear Station GNRO~2002J00085 September 16, 2002 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 Safety Analysis Report, Revision 1 Appendix K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS LDC 2002-074)
REFERENCES:
- 1. Entergy letter dated January 31,2002, "License Amendment Request, Appendix K Measurement Uncertainty Recovery-Power Uprate Request"
- 2. Entergy Jetter dated March 18, 2002, "Non-Proprietary Version of GE Topical Safety Analysis Report NEDC-33048"
- 3. Entergy letter dated June 25, 2002, Safety Analysis Report Errata
- 1 Appendix K Measurement Uncertainty Recovery Power Uprate
- 4. Entergy letter dated June 25, 2002, Safety Analysis Report Errata
- 2 Appendix K Measurement Uncertainty Recovery Power Uprate
- 5. NRC Letter to General Electric Company, D. H. Jaffe to G. B.
Stramback, dated August 26, 2002, Request for Withholding Information from Public Disclosure
Dear Sir or Madam:
Entergy Operations, Inc. (Entergy), in Reference 1, requested approval of changes to the Grand Gulf Nuclear Station, Unit 1 (GGNS) Operating License and Technical Specifications associated with an increase in the licensed power level. As a part of that original submittal, a Thermal Power Optimization Safety Analysis Report (TSAR), NEDC~33048P, was provided as Attachment 2. That document was noted to be a proprietary report; a non-proprietary version of the TSAR was submitted under Reference 2.
Entergy and General Electric (GE) have discussed the classification of the proprietary information in the report with the NRC staff. Two Errata and Addenda to the TSAR were prepared and submitted in References 3 and 4. These, however, did not resolve all of the NRC concerns with the propr:'3tary information for this GGNS application. In Reference 5, the NRC denied the GE request for withholding the TSAR from public disclosure. ~ 0\
\\
- ---~-:-----------~
September 16, 2002 GNRO-2002l00085 Page 2 of 2 Attached are a proprietary and a non-proprietary version of Revision 1 to the TSAR. This revision supersedes the TSAR and changes transmitted in Reference 1 through 4. GE will withdraw the proprietary version of the TSAR and the TSAR Errata and Addenda under separate correspondence. Note that there are no text changes made in this revision to the TSAR; only the designation (Le., margin bars) of proprietary information has been revised. includes information considered to be proprietary to General Electric. It is requested that the document in this attachment be withheld from public disclosure pursuant to 10CFR2.790. An affidavit signed by an officer of General Electric is provided in the front of the document. The address of General Electric is provided in the cover page of the report included in Attachment 1.
There are no new commitments made in this letter. Should you have any questions or comments concerning this request, please contact Jerry Burford at (601) 368-5755.
I declare under penalty of perjury that the foregoing is true and correct. Executed on September 16,2002.
Sincerely,
~~
Attachments:
- 1. NEDC-33048P, Revision 1 (proprietary)
- 2. NEDC-33048. Revision 1 (non-proprietary) cc: U. S. Nuclear Regulatory Commission A TIN: Mr. Ellis W. Merschoff Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 U. S. Nuclear Regulatory Commission A TIN: Mr. David H. Jaffe NRR/DLPM (w/2)