MONTHYEARML0219800262002-07-0808 July 2002 Safety Analysis Report Errata #2, Appendix K Measurement Uncertainty Recovery - Power Uprate (TAC MB3972, Ldc 2002-074) Project stage: Other GNRO-2002/00063, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072)2002-07-22022 July 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072) Project stage: Supplement ML0221001632002-08-0909 August 2002 Request for Withholding Information from Public Disclosure MB3972 Project stage: Withholding Request Acceptance ML0221000962002-08-26026 August 2002 Withholding from Public Disclosure, Errata and Addenda to NEDC-33048P, Thermal Power Optimization Report, MB3972 Project stage: Other ML0223303972002-08-28028 August 2002 Letter, Draft Safety Evaluation Power Uprate Project stage: Draft Approval GNRO-2002/00085, /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074)2002-09-16016 September 2002 /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074) Project stage: Other GNRO-2002/00084, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request2002-09-16016 September 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request Project stage: Supplement ML0226900672002-09-24024 September 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request ML0228103192002-10-0202 October 2002 GE Request for Withdrawal of Proprietary Information from Public Portion of ADAMS Project stage: Withdrawal ML0228103232002-10-0303 October 2002 GE Request for Withdrawal of Proprietary Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withdrawal ML0226702792002-10-0707 October 2002 Request for Withholding, NEDC-33048P, Revision 2, Safety Analysis Report for Grand Gulf Nuclear Station Thermal Power Optimization, Dated October 2002 Project stage: Other ML0226303042002-10-10010 October 2002 Unit One, Amendment 156 to License NPF-29, Increasing Licensed Power Level by Approximately 1.7% from 3,833 Megawatts Thermal (Mwt) to 3,898 Mwt Project stage: Acceptance Review ML0228902842002-10-10010 October 2002 1.7% Uprate, TAC No. MB3972, Revised FOL Page 4 and TS Page 1.0-5, Amendment 156 Project stage: Other ML0229102262002-10-15015 October 2002 Request for Withholding Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withholding Request ML0231105182002-11-22022 November 2002 Grand Gulf, Ltr, Withdrawal of GE Proprietary Reports NEDC-33038P, Rev 0, January 2002, Rev. 1, September 2002, and Non-Proprietary Report NEDC-33038, Rev. 1, September 2002 Project stage: Withdrawal 2002-07-22
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24087A1962024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 2024-09-09
[Table view] |
Text
GE Nuclear Energy Nuclear Services 175 Curtner Ave M/C 747 San Jose, CA 95125 (408) 925-1913, Fax (408) 925-6710 E-mail george stramback@gene ge com MFN 02-064 October 2, 2002 U.S Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Attention: Chief, Information Management Branch Program Management Policy Development and Analysis Staff
Subject:
GE Request for Withdrawal of Proprietary Information From Public Portion of ADAMS (TAC# MB3972)
Entergy Operations, Inc. (Entergy), in the referenced letter, submitted Revision 1 to NEDC-33048, "Safety Analysis Report for Grand Gulf Nuclear Station Thermal Power Optimization" (TSAR), which supports a request for a power uprate. A proprietary and a non-proprietary version of the TSAR were provided. Through an administrative error, certain proprietary information was inadvertently retained in the non-proprietary version.
GE, as the owner of this information, requests that Revision 1 of the non-proprietary TSAR (NEDO-33048) be withdrawn because it should not be made available to the public.
GE will provide Entergy with a revision of the non-proprietary TSAR. In addition to correcting the inadvertent release of proprietary information, GE will address comments received from the NRC Staff during a conference call on September 30, 2002. To address the comments, changes will be made in both the proprietary and non-proprietary TSARs.
If you have any questions, please contact Mike Lalor at (408) 925-2443 or myself.
Sincerely, George Stramback Regulatory Services, Project Manager GE Nuclear Energy (408) 925-1913 george.stramback@gene.ge.com
-oof
"MFN-02-064 Page 2
References:
- 1. Entergy letter, "Safety Analysis Report, Revision 1, Appendix K Measurement Uncertainty Recovery Power Uprate," dated September 16, 2002 cc: DH Jaffe - USNRC FG Burford - EOI ED Schrull JF Klapproth