MONTHYEARML0219800262002-07-0808 July 2002 Safety Analysis Report Errata #2, Appendix K Measurement Uncertainty Recovery - Power Uprate (TAC MB3972, Ldc 2002-074) Project stage: Other GNRO-2002/00063, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072)2002-07-22022 July 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072) Project stage: Supplement ML0221001632002-08-0909 August 2002 Request for Withholding Information from Public Disclosure MB3972 Project stage: Withholding Request Acceptance ML0221000962002-08-26026 August 2002 Withholding from Public Disclosure, Errata and Addenda to NEDC-33048P, Thermal Power Optimization Report, MB3972 Project stage: Other ML0223303972002-08-28028 August 2002 Letter, Draft Safety Evaluation Power Uprate Project stage: Draft Approval GNRO-2002/00085, /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074)2002-09-16016 September 2002 /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074) Project stage: Other GNRO-2002/00084, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request2002-09-16016 September 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request Project stage: Supplement ML0226900672002-09-24024 September 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request ML0228103192002-10-0202 October 2002 GE Request for Withdrawal of Proprietary Information from Public Portion of ADAMS Project stage: Withdrawal ML0228103232002-10-0303 October 2002 GE Request for Withdrawal of Proprietary Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withdrawal ML0226702792002-10-0707 October 2002 Request for Withholding, NEDC-33048P, Revision 2, Safety Analysis Report for Grand Gulf Nuclear Station Thermal Power Optimization, Dated October 2002 Project stage: Other ML0226303042002-10-10010 October 2002 Unit One, Amendment 156 to License NPF-29, Increasing Licensed Power Level by Approximately 1.7% from 3,833 Megawatts Thermal (Mwt) to 3,898 Mwt Project stage: Acceptance Review ML0228902842002-10-10010 October 2002 1.7% Uprate, TAC No. MB3972, Revised FOL Page 4 and TS Page 1.0-5, Amendment 156 Project stage: Other ML0229102262002-10-15015 October 2002 Request for Withholding Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withholding Request ML0231105182002-11-22022 November 2002 Grand Gulf, Ltr, Withdrawal of GE Proprietary Reports NEDC-33038P, Rev 0, January 2002, Rev. 1, September 2002, and Non-Proprietary Report NEDC-33038, Rev. 1, September 2002 Project stage: Withdrawal 2002-07-22
[Table View] |
|
---|
Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] |
Text
GE Nuclear Energy Nuclear Services 175 Curtner Ave M/C 747 San Jose, CA 95125 (408) 925-1913, Fax (408) 925-6710 E-mail george stramback@gene ge com MFN 02-064 October 2, 2002 U.S Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Attention: Chief, Information Management Branch Program Management Policy Development and Analysis Staff
Subject:
GE Request for Withdrawal of Proprietary Information From Public Portion of ADAMS (TAC# MB3972)
Entergy Operations, Inc. (Entergy), in the referenced letter, submitted Revision 1 to NEDC-33048, "Safety Analysis Report for Grand Gulf Nuclear Station Thermal Power Optimization" (TSAR), which supports a request for a power uprate. A proprietary and a non-proprietary version of the TSAR were provided. Through an administrative error, certain proprietary information was inadvertently retained in the non-proprietary version.
GE, as the owner of this information, requests that Revision 1 of the non-proprietary TSAR (NEDO-33048) be withdrawn because it should not be made available to the public.
GE will provide Entergy with a revision of the non-proprietary TSAR. In addition to correcting the inadvertent release of proprietary information, GE will address comments received from the NRC Staff during a conference call on September 30, 2002. To address the comments, changes will be made in both the proprietary and non-proprietary TSARs.
If you have any questions, please contact Mike Lalor at (408) 925-2443 or myself.
Sincerely, George Stramback Regulatory Services, Project Manager GE Nuclear Energy (408) 925-1913 george.stramback@gene.ge.com
-oof
"MFN-02-064 Page 2
References:
- 1. Entergy letter, "Safety Analysis Report, Revision 1, Appendix K Measurement Uncertainty Recovery Power Uprate," dated September 16, 2002 cc: DH Jaffe - USNRC FG Burford - EOI ED Schrull JF Klapproth