ML022810323

From kanterella
Jump to navigation Jump to search

GE Request for Withdrawal of Proprietary Information from Public Disclosure Grand Gulf Nuclear Station Unit 1
ML022810323
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/03/2002
From: Stramback G
General Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
MFN 02-066, NEDC-33048, TAC MB3972
Download: ML022810323 (2)


Text

GE Nuclear Energy Nuclear Services 175 Curtner Ave. M/C 747 San Jose, CA 95125 (408) 925-1913, Fax (408) 925-6710 E-mail george stramback@gene ge.com MFN 02-066 October 3, 2002 U.S Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Attention:

Chief, Information Management Branch Program Management Policy Development and Analysis Staff

Subject:

GE Request for Withdrawal of Proprietary Information from Public Disclosure Grand Gulf Nuclear Station Unit I(TAC No. MB3972)

Entergy Operations, Inc. (Entergy), in the referenced letter, submitted Revision 1 to NEDC-33048, "Safety Analysis Report for Grand Gulf Nuclear Station Thermal Power Optimization" (TSAR), which supports a request for a power uprate. A proprietary and a non-proprietary version of the TSAR were provided. Through an administrative error, certain proprietary information was inadvertently retained in the non-proprietary version.

In addition, GE will address comments received from the NRC Staff during a conference call on September 30, 2002. To address the comments, changes will be made in both the proprietary and non-proprietary TSAR. Therefore, GE, as the owner of this information, requests that Revision 1 of both of the TSARs be withdrawn.

GE will provide Entergy with Revision 2 of both of the TSAR documents.

If you have any questions, please contact Mike Lalor at (408) 925-2443 or myself.

Sincerely, George Stramback Regulatory Services, Project Manager GE Nuclear Energy (408) 925-1913 george.stramback@gene.ge.com

MFN-02-066 Page 2

Reference:

1. Entergy letter, Safety Analysis Report, Revision 1, Appendix K Measurement Uncertainty Recovery Power Uprate, dated September 16, 2002 cc:

Mr. D. H. Jaffe NRR Project Manager Region IV U. S. Nuclear Regulatory Commission NRR Mail Stop O-7D 01 One Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. F. G. Burford Entergy Operations Inc.

Mail Stop M-ESH-404 1340 Echelon Parkway Jackson MS 39213 JF Harrison (GE/San Jose)

JF Klapproth (GE/San Jose)

MJ Dick (GE/San Jose)

MA Lalor (GE/San Jose)