Letter Sequence Withdrawal |
|---|
|
|
MONTHYEARML0219800262002-07-0808 July 2002 Safety Analysis Report Errata 2, Appendix K Measurement Uncertainty Recovery - Power Uprate (TAC MB3972, Ldc 2002-074) Project stage: Other GNRO-2002/00063, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072)2002-07-22022 July 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072) Project stage: Supplement ML0221001632002-08-0909 August 2002 Request for Withholding Information from Public Disclosure MB3972 Project stage: Withholding Request Acceptance ML0221000962002-08-26026 August 2002 Withholding from Public Disclosure, Errata and Addenda to NEDC-33048P, Thermal Power Optimization Report, MB3972 Project stage: Other ML0223303972002-08-28028 August 2002 Letter, Draft Safety Evaluation Power Uprate Project stage: Draft Approval GNRO-2002/00085, /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074)2002-09-16016 September 2002 /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074) Project stage: Other GNRO-2002/00084, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request2002-09-16016 September 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request Project stage: Supplement ML0226900672002-09-24024 September 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request ML0228103192002-10-0202 October 2002 GE Request for Withdrawal of Proprietary Information from Public Portion of ADAMS Project stage: Withdrawal ML0228103232002-10-0303 October 2002 GE Request for Withdrawal of Proprietary Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withdrawal ML0226702792002-10-0707 October 2002 Request for Withholding, NEDC-33048P, Revision 2, Safety Analysis Report for Grand Gulf Nuclear Station Thermal Power Optimization, Dated October 2002 Project stage: Other ML0228902842002-10-10010 October 2002 1.7% Uprate, TAC No. MB3972, Revised FOL Page 4 and TS Page 1.0-5, Amendment 156 Project stage: Other ML0226303042002-10-10010 October 2002 Unit One, Amendment 156 to License NPF-29, Increasing Licensed Power Level by Approximately 1.7% from 3,833 Megawatts Thermal (Mwt) to 3,898 Mwt Project stage: Other ML0229102262002-10-15015 October 2002 Request for Withholding Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withholding Request ML0231105182002-11-22022 November 2002 Ltr, Withdrawal of GE Proprietary Reports NEDC-33038P, Rev 0, January 2002, Rev. 1, September 2002, and Non-Proprietary Report NEDC-33038, Rev. 1, September 2002 Project stage: Withdrawal 2002-07-22
[Table View] |
Text
GE Nuclear Energy Nuclear Services 175 Curtner Ave. M/C 747 San Jose, CA 95125 (408) 925-1913, Fax (408) 925-6710 E-mail george stramback@gene ge.com MFN 02-066 October 3, 2002 U.S Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Attention:
Chief, Information Management Branch Program Management Policy Development and Analysis Staff
Subject:
GE Request for Withdrawal of Proprietary Information from Public Disclosure Grand Gulf Nuclear Station Unit I(TAC No. MB3972)
Entergy Operations, Inc. (Entergy), in the referenced letter, submitted Revision 1 to NEDC-33048, "Safety Analysis Report for Grand Gulf Nuclear Station Thermal Power Optimization" (TSAR), which supports a request for a power uprate. A proprietary and a non-proprietary version of the TSAR were provided. Through an administrative error, certain proprietary information was inadvertently retained in the non-proprietary version.
In addition, GE will address comments received from the NRC Staff during a conference call on September 30, 2002. To address the comments, changes will be made in both the proprietary and non-proprietary TSAR. Therefore, GE, as the owner of this information, requests that Revision 1 of both of the TSARs be withdrawn.
GE will provide Entergy with Revision 2 of both of the TSAR documents.
If you have any questions, please contact Mike Lalor at (408) 925-2443 or myself.
Sincerely, George Stramback Regulatory Services, Project Manager GE Nuclear Energy (408) 925-1913 george.stramback@gene.ge.com
MFN-02-066 Page 2
Reference:
- 1. Entergy letter, Safety Analysis Report, Revision 1, Appendix K Measurement Uncertainty Recovery Power Uprate, dated September 16, 2002 cc:
Mr. D. H. Jaffe NRR Project Manager Region IV U. S. Nuclear Regulatory Commission NRR Mail Stop O-7D 01 One Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. F. G. Burford Entergy Operations Inc.
Mail Stop M-ESH-404 1340 Echelon Parkway Jackson MS 39213 JF Harrison (GE/San Jose)
JF Klapproth (GE/San Jose)
MJ Dick (GE/San Jose)
MA Lalor (GE/San Jose)