Letter Sequence Draft Approval |
---|
|
|
MONTHYEARML0219800262002-07-0808 July 2002 Safety Analysis Report Errata #2, Appendix K Measurement Uncertainty Recovery - Power Uprate (TAC MB3972, Ldc 2002-074) Project stage: Other GNRO-2002/00063, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072)2002-07-22022 July 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request (TAC MB3972, GGNS Ldc 2002-072) Project stage: Supplement ML0221001632002-08-0909 August 2002 Request for Withholding Information from Public Disclosure MB3972 Project stage: Withholding Request Acceptance ML0221000962002-08-26026 August 2002 Withholding from Public Disclosure, Errata and Addenda to NEDC-33048P, Thermal Power Optimization Report, MB3972 Project stage: Other ML0223303972002-08-28028 August 2002 Letter, Draft Safety Evaluation Power Uprate Project stage: Draft Approval GNRO-2002/00085, /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074)2002-09-16016 September 2002 /16/2002 Letter - SAR, Rev. 1, App. K Measurement Uncertainty Recovery Power Uprate (TAC MB3972, GGNS Ldc 2002-074) Project stage: Other GNRO-2002/00084, Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request2002-09-16016 September 2002 Supplement to Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request Project stage: Supplement ML0226900672002-09-24024 September 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request ML0228103192002-10-0202 October 2002 GE Request for Withdrawal of Proprietary Information from Public Portion of ADAMS Project stage: Withdrawal ML0228103232002-10-0303 October 2002 GE Request for Withdrawal of Proprietary Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withdrawal ML0226702792002-10-0707 October 2002 Request for Withholding, NEDC-33048P, Revision 2, Safety Analysis Report for Grand Gulf Nuclear Station Thermal Power Optimization, Dated October 2002 Project stage: Other ML0226303042002-10-10010 October 2002 Unit One, Amendment 156 to License NPF-29, Increasing Licensed Power Level by Approximately 1.7% from 3,833 Megawatts Thermal (Mwt) to 3,898 Mwt Project stage: Acceptance Review ML0228902842002-10-10010 October 2002 1.7% Uprate, TAC No. MB3972, Revised FOL Page 4 and TS Page 1.0-5, Amendment 156 Project stage: Other ML0229102262002-10-15015 October 2002 Request for Withholding Information from Public Disclosure Grand Gulf Nuclear Station Unit 1 Project stage: Withholding Request ML0231105182002-11-22022 November 2002 Grand Gulf, Ltr, Withdrawal of GE Proprietary Reports NEDC-33038P, Rev 0, January 2002, Rev. 1, September 2002, and Non-Proprietary Report NEDC-33038, Rev. 1, September 2002 Project stage: Withdrawal 2002-07-22
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24087A1962024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 2024-09-09
[Table view] |
Text
August 28, 2002 Mr. William A. Eaton Vice President, Operations GGNS Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - RE: DRAFT SAFETY EVALUATION FOR PROPOSED 1.7 PERCENT INCREASE IN LICENSED POWER LEVEL (TAC NO. MB3972)
Dear Mr. Eaton:
We have reviewed the application from Grand Gulf Nuclear Station, Unit 1 (GGNS) dated January 31, 2002, as supplemented by letters dated June 12, June 25, and July 22, 2002. The proposed amendment would increase the licensed power level by approximately 1.7 percent from 3,833 megawatts thermal (Mwt) to 3,898 Mwt. These changes would result from increased feedwater flow measurement accuracy to be achieved by utilizing high accuracy ultrasonic flow measurement instrumentation.
Enclosed is a draft safety evaluation (SE) for GGNS. This draft SE is being withheld from public disclosure at this time because it may contain proprietary information.
We are providing this draft SE for the purpose of identifying if it contains any proprietary information pursuant to Section 2.790 of Title 10 of the Code of Federal Regulations. Please provide any comments that you may have on the enclosed draft SE with regard to the inclusion of proprietary information by September 9, 2002. Should a situation occur that prevents you from meeting that date, please contact David Jaffe of my staff at (301) 415-1439.
Sincerely,
/RA/
Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
Draft Safety Evaluation cc w/o encl: See next page
ML022330397 OFFICE PDIV-1/PM PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME DJaffe BVaidya DJohnson RGramm DATE 8/26/02 8-27-2002 8/21/02 8/27/02 Grand Gulf Nuclear Station cc:
Executive Vice President Attorney General
& Chief Operating Officer Department of Justice Entergy Operations, Inc. State of Louisiana P. O. Box 31995 P. O. Box 94005 Jackson, MS 39286-1995 Baton Rouge, LA 70804-9005 Wise, Carter, Child & Caraway State Health Officer P. O. Box 651 State Board of Health Jackson, MS 39205 P. O. Box 1700 Jackson, MS 39205 Winston & Strawn 1400 L Street, N.W. - 12th Floor Office of the Governor Washington, DC 20005-3502 State of Mississippi Jackson, MS 39201 Director Division of Solid Waste Management Attorney General Mississippi Department of Natural Asst. Attorney General Resources State of Mississippi P. O. Box 10385 P. O. Box 22947 Jackson, MS 39209 Jackson, MS 39225 President Vice President, Operations Support Claiborne County Entergy Operations, Inc.
Board of Supervisors P.O. Box 31995 P. O. Box 339 Jackson, MS 39286-1995 Port Gibson, MS 39150 Director Regional Administrator, Region IV Nuclear Safety Assurance U.S. Nuclear Regulatory Commission Entergy Operations, Inc.
611 Ryan Plaza Drive, Suite 1000 P.O. Box 756 Arlington, TX 76011 Port Gibson, MS 39150 Senior Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 399 Port Gibson, MS 39150 General Manager, GGNS Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150 May 1999