ML022690067

From kanterella
Jump to navigation Jump to search

Request for Withholding Information from Public Disclosure
ML022690067
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/24/2002
From: Stramback G
General Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
MFN 02-060, TAC MB3972
Download: ML022690067 (2)


Text

GE Nuclear Energy Nuclear Services 175 Curtner Ave M/C 747 San Jose, CA 95125 (408) 925-1913, Fax (408) 925-6710 E-mail george stramback@gene ge.com MFN 02-060 September 24, 2002 U.S Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Attention: Chief, Information Management Branch Program Management Policy Development and Analysis Staff

Subject:

Request for Withholding Information from Public Disclosure Grand Gulf Nuclear Station Unit I(TAC No. MB3972)

By Reference 1, the NRC denied GE's request to withhold from public disclosure the Grand Gulf Safety Analysis Report for Thermal Power Optimization (TSAR)

NEDC-33048P, Revision 0, and its related errata and addenda (E&A). Entergy Operations, Inc (EOI) submitted the TSAR and E&As to the NRC by References 2, 3 and

4. The TSAR and related E&As were provided to support a requested license application by EOI and were not submitted in a rule making proceeding. GE hereby requests, pursuant to 10 CFR 2.790(c), that the referenced Grand Gulf TSAR and related E&As be withdrawn.

GE provided EOI with a revision of the TSAR, which incorporates the E&As and revises the identification of the proprietary information in the TSAR, as well as revising the basis for the proprietary protection. The proprietary information is protected by a simple redaction as requested by your letter (Reference 1). In order to simplify the NRC review, no other changes to the TSAR were made, and the revised TSAR replaces the original TSAR in total. EOI has submitted the revised TSAR by Reference 5 to support its license application.

If you have any questions, please contact Mike Lalor at (408) 925-2443 or myself.

Sincerely, George Stramback Regulatory Services, Project Manager GE Nuclear Energy DO (408) 925-1913 george.stramback@gene.ge.com

MFN-02-060 Page 2

References:

1. NRC Letter, DH Jaffe (NRC) to GB Stramback (GE), "Request for Withholding Information From Public Disclosure Grand Gulf Nuclear Station, Unit 1 (TAC NO.

MB3972)", dated August 26,2002

2. EOI letter, "License Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request," dated January 31
3. EOI letter, "Safety Analysis Report Errata #1 Appendix K Measurement Uncertainty Recovery Power Uprate EOI Letter transmitting E&.AI," dated June 25,2002
4. EOI letter, "Safety Analysis Report Errata #2 Appendix K Measurement Uncertainty Recovery Power Uprate," dated June 25, 2002
5. EOI Letter, " Safety Analysis Report, Revision 1 - Appendix K Measurement Uncertainty Recovery Power Uprate," dated September 16, 2002 cc: Mr. D. H. Jaffe NRR Project Manager Region IV U. S. Nuclear Regulatory Commission NRR Mail Stop O-7D 01 One Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. F. G. Burford Entergy Operations Inc.

Mail Stop M-ESH-404 1340 Echelon Parkway Jackson MS 39213 JF Harrison (GE/San Jose)

JF Klapproth (GE/San Jose)

MJ Dick (GE/San Jose)

MA Lalor (GE/San Jose)