MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters CP-202400107, (CPNPP) - 2023 Annual Radiological Environmental Operating Report2024-04-18018 April 2024 (CPNPP) - 2023 Annual Radiological Environmental Operating Report CP-202400099, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2024-04-0909 April 2024 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202400092, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-04-0101 April 2024 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400089, Property Damage Insurance2024-03-25025 March 2024 Property Damage Insurance CP-202400087, (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable2024-03-21021 March 2024 (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable CP-202400085, (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-0707 March 2024 (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202400073, (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-03-0404 March 2024 (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400072, (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation2024-02-29029 February 2024 (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions CP-202400063, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)2024-02-12012 February 2024 (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23) CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report2023-08-17017 August 2023 (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1122023-08-0101 August 2023 (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3 CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)2023-07-18018 July 2023 (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-052023-05-25025 May 2023 Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)2023-05-0404 May 2023 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Effluent Release Report CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Environmental Operating Report CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)2023-04-20020 April 2023 Submittal of 2022 Annual Environmental Operating Report (Non-Radiological) CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments 2024-09-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2023-09-14014 September 2023 (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-0012023-04-19019 April 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300135, License Renewal Application Revision 0 - Supplement 12023-04-0606 April 2023 License Renewal Application Revision 0 - Supplement 1 CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications2022-11-21021 November 2022 (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-0022022-11-21021 November 2022 Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 CP-202200350, Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report2022-10-0303 October 2022 Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report ML22192A0072022-08-22022 August 2022 Issuance of Amendment Nos. 183 and 183 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-07-20020 July 2022 Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CP-202200006, (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended.2022-02-17017 February 2022 (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended. CP-202200075, Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-02-15015 February 2022 Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100575, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-08-31031 August 2021 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100251, (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-07-27027 July 2021 (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100394, Supplement to License Amendment Request (LAR) 20-0062021-07-13013 July 2021 Supplement to License Amendment Request (LAR) 20-006 CP-202100065, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-05-11011 May 2021 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b CP-202000585, (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump2021-01-27027 January 2021 (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump CP-202000584, (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING2020-12-0909 December 2020 (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING CP-202000575, (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating2020-11-19019 November 2020 (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating CP-202000365, Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump2020-08-31031 August 2020 Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump CP-202000401, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-28028 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-202000388, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-16016 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-202000321, (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time2020-07-0202 July 2020 (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time CP-202000305, (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-06-24024 June 2020 (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water TXX-2002, Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program2020-04-10010 April 2020 Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program CP-201900368, Revision to Technical Specifications 3.8.1, AC Sources - Operating2020-03-31031 March 2020 Revision to Technical Specifications 3.8.1, AC Sources - Operating CP-202000016, Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2020-01-16016 January 2020 Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. CP-201900415, License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-11-0707 November 2019 License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program CP-201900393, License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation2019-11-0707 November 2019 License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation CP-201800115, License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation2018-03-29029 March 2018 License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation ML17074A4942017-04-13013 April 2017 Issuance of Amendment Nos. 168 and 168 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML16351A2002016-12-14014 December 2016 Submittal of License Amendment Request 16-003, Administrative Change to License Name CP-201600216, License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing.2016-04-27027 April 2016 License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. CP-201501062, ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments2015-11-12012 November 2015 ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments CP-201400165, (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule2014-02-0404 February 2014 (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule CP-201301322, License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule2013-11-21021 November 2013 License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule CP-201301065, Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2013-08-29029 August 2013 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process CP-201300738, License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item..2013-07-10010 July 2013 License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item.. CP-201300257, License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals.2013-03-28028 March 2013 License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals. CP-201300083, License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals.2013-01-15015 January 2013 License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals. CP-201200518, License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits2012-10-0202 October 2012 License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits CP-201200552, License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-12012-07-12012 July 2012 License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-1 CP-201200012, (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent ....2012-03-28028 March 2012 (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent .... 2024-09-12
[Table view] |
Text
Rafael Flores Luminant Power Senior Vice President P.O. Box 1002
& Chief Nuclear Officer 6322 North FM 56 rafael.flores@luminant.com Glen Rose, TX 76043 Luminant T 254 897 5590 C 817 559 0403 F 254 897 6652 CP-201400165 Ref: 10 CFR 50.90 Log # TXX-14021 February 4, 2014 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)
DOCKET NOS. 50-445, 50-446 and 72-74 REDACTED VERSION OF LICENSE AMENDMENT REQUEST (LAR)13-003, FOR APPROVAL OF THE REVISED CPNPP CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE
REFERENCE:
- 1) Letter logged TXX-13168 dated November 21, 2013, from Rafael Flores to the NRC, "License Amendment Request (LAR)13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule"
Dear Sir or Madam:
With the letter in Reference 1, Luminant Generation Company LLC (Luminant Power) submitted License Amendment Request (LAR)13-003 to propose a change to the CPNPP Cyber Security Plan Milestone 8 full implementation date. With this submittal, Luminant Power provides a redacted version of LAR 13-003. The redacted version of the LAR does not contain security related information (SRI) and is suitable for public disclosure.
The Enclosure with this letter contains the redacted version of the Description and Assessment that was included as Attachment 1 to the Reference 1 letter. The redacted version of the Description and Assessment does not contain security related information. The Enclosure with this letter also includes copies of Attachments 2 and 3 from the Reference 1 letter, which are not SRI documents.
The CPNPP Cyber Security Plan Implementation Schedule was enclosed with the Reference 1 submittal.
The implementation schedule in aggregate is security related information and is not included with this submittal.
A member of the STARS Alliance Callaway - Comanche Peak - Diablo Canyon
U. S. Nuclear Regulatory Commission T)X(-14021 Page 2 of 2 02/04/2014 This communication contains no new licensing basis commitments regarding Comanche Peak Units 1 and 2 or the Independent Spent Fuel Storage Installation.
Should you have any questions, please contact Jim Barnette at (254) 897-5866 or James.barnette@luminant.com.
Sincerely, Luminant Generation Company, LLC Rafael Flores By: __ _ _ _ _ _ _ _ _ _ _ _
Thomas P.Mcc~ol Vice President, Station Support Enclosure - Attachments from TXX-13168, CPNPP LAR 13-003 c - Marc L. Dapas, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Helen Watkins Inspection Unit Manager Texas Department of State Health Services PO Box 149347 Austin TX 78714-9347
ENCLOSURE with TXX-14021 Attachments from TXX-13168, CPNPP LAR 13-003 to TXX-13168, Description and Assessment (Redacted) to TXX-13168, Proposed Facility Operating License Changes (Mark-Up) to TXX-13168, Retyped Facility Operating License Changes
Security Related- hnform-ationp Withhold unifdepr 10 C-FR 2.390 ATTACHMENT 1 to TXX-13168 DESCRIPTION AND ASSESSMENT Redact edl
..... :*.. T)^1^*-*,-1 T*^*-" xxr.tt,-14 i in fcmn inn('% to TXX-1 3168 Page 1 of 14 11/21/2013 LICENSEE'S EVALUATION
1.0 DESCRIPTION
2.0 PROPOSED CHANGE
3.0 BACKGROUND
4.0 TECHNICAL ANALYSIS
5.0 REGULATORY ANALYSIS
5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
6.0 ENVIRONMENTAL CONSIDERATION
7.0 PRECEDENTS
8.0 REFERENCES
. . T'i
. 11) 1^ *, T
- T., 1 1 13 -1 An aCCUA"' 4Q. 4-W- V-4-41k ý --4 to TXX-1 3168 Page 2 of 14 11/21/2013
1.0 DESCRIPTION
By this letter, Luminant Generation Company LLC (Luminant Power) requests an amendment to the Comanche Peak Nuclear Power Plant (CPNPP) Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89) by incorporating the attached change into the CPNPP Unit 1 and 2 Facility Operating License (FOL). License Amendment Request (LAR)13-003 is a request to revise the Operating Licenses (OLs) for Comanche Peak Nuclear Power Plant Units 1 and 2.
No changes to the CPNPP Final Safety Analysis Report are anticipated at this time as a result of this License Amendment Request.
2.0 PROPOSED CHANGE
LAR 13-003 proposes a change to the CPNPP Cyber Security Plan (CSP) full implementation date (Milestone 8) as set forth in the CPNPP Cyber Security Plan Implementation Schedule. The LAR proposes additional text that will add the FOL amendment number for this LAR to the existing cyber security license condition in Paragraph 2.H of Facility Operating License Nos. NPF-87 and NPF-89 for CPNPP Units 1 and 2 respectively.
3.0 BACKGROUND
Cyber security requirements are codified in 10 CFR 73.54 and are designed to provide high assurance that digital computer and communication systems and networks are adequately protected against cyber attacks up to and including the design basis threat established by 10 CFR 73.1(a)(1)(v). 10 CFR 73.54 specifically requires operating licensees implement a cyber security plan (CSP) that satisfies the requirements of the Rule in accordance with an NRC approved cyber security plan implementation schedule.
On July 26, 2011, the NRC issued amendments to the CPNPP Unit 1 and Unit 2 FOLs (Reference 8.2) in response to CPNPP LAR 10-002 dated July 15, 2010, as supplemented by letters dated September 27 and November 30, 2010, and March 31, 2011 (References 8.3, 8.4, 8.5). The FOL amendments approved the CPNPP Cyber Security Plan and associated implementation schedule, and revised paragraph 2.H of the FOLs to provide a license condition to require CPNPP to fully implement and maintain in effect all provisions of the NRC-approved Cyber Security Plan. Any change to the NRC-approved CSP implementation schedule requires prior NRC approval pursuant to 10 CFR 50.90.
Security Related nfoQr"mation- Withhold under 10 CFR 2.390 to TXX-1 3168 Page 3 of 14 11/21/2013 The first seven milestones of the CPNPP Cyber Security Implementation Plan and the NRC "Good Faith Letter" action items are complete. Higher priority activities are planned for completion by the current Milestone 8 date. Implementation of the remainder of the cyber security implementation plan will require an extension of the Milestone 8 full implementation date.
4.0 TECHNICAL ANALYSIS
The following teclhical analysis provides information concerning eight criteria that serves to explain the current status of the CPNPP cyber security program and the need for the Milestone 8 date revision. The analysis describes how prioritization of CPNPP's completed and planned implementation actions will provide assurance that digital computer and communication systems and networks are adequately protected against cyber attacks up to and including the design basis threat established by 10 CFR 73.1(a)(1)(v), until the full program is implemented by the proposed date.
Security Related Info-mation- Withhold under 10 CFR 2.390 to TXX-13168 Page 4 of 14 11/21/2013
Necurity iteateci miormatioa- witnnola unaer i II 59 to TXX-13168 Page 5 of 14 11/21/2013
Security Related-nformation Withhold under 10 CFR 2.390 to TXX-1 3168 Page 6 of 14 11/21/2013
Security Related Inforaton- Withhold under 10 CFR 2.390 to TXX-1 3168 Page 7 of 14 11/21/2013
Securit, Related -Inf-ormation- Withhold under 1-0 CFR 2.390 to TXX-1 3168 Page 8 of 14 11/21/2013
Security Related Infonvation Withhold under 10 CFPR 2.390 to TXX-13168 Page 9 of 14 11/21/2013
Security Related nforat.n- With!hold under 1-0 CFR 2.390 to TXX-1 3168 Page 10 of 14 11/21/2013
Security Re lated ,If-a'tion_WV ithholdl undeor 1-0 CFR 2.390 to TXX-1 3168 Page 11 of 14 11/21/2013
Security Related nfrm.ation- Withhold under- 10 CFR 2.390 Attachment I to TXX-13168 Page 12 of 14 11/21/2013
5.0 REGULATORY ANALYSIS
5.1 No Significant Hazards Consideration Luminant Power has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The amendment proposes a change to the CPNPP Cyber Security Plan (CSP)
Milestone 8 full implementation date as set forth in the CPNPP Cyber Security Plan Implementation Schedule. The revision of the full implementation date for the CPNPP Cyber Security Plan does not involve modifications to any safety-related structures, systems or components (SSCs). Rather, the implementation schedule provides a timetable for fully implementing the CPNPP CSP. The CSP describes how the requirements of 10 CFR 73.54 are to be implemented to identify, evaluate, and mitigate cyber attacks up to and including the design basis cyber attack threat, thereby achieving high assurance that the facility's digital computer and communications systems and networks are protected from cyber attacks. The revision of the CPNPP Cyber Security Plan Implementation Schedule will not alter previously evaluated design basis accident analysis assumptions, add any accident initiators, modify the function of the plant safety-related SSCs, or affect how any plant safety-related SSCs are operated, maintained, modified, tested, or inspected.
Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
Security Related Informnation- Withhold under 10 CFER 2.390 to TXX-1 3168 Page 13 of 14 11/21/2013
- 2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The implementation of the CPNPP Cyber Security Plan does not introduce new equipment that could create a new or different kind of accident, and no new equipment failure modes are created. No new accident scenarios, failure mechanisms, or limiting single failures are introduced as a result of this proposed amendment.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Do the proposed changes involve a significant reduction in a margin of safety?
Response: No The margin of safety is associated with the confidence in the ability of the fission product barriers (i.e., fuel cladding, reactor coolant pressure boundary, and containment structure) to limit the level of radiation to the public. The proposed amendment does not alter the way any safety-related SSC functions and does not alter the way the plant is operated. The Cyber Security Plan provides assurance that safety-related SSCs are protected from cyber attacks. The proposed amendment does not introduce any new uncertainties or change any existing uncertainties associated with any safety limit. The proposed amendment has no effect on the structural integrity of the fuel cladding, reactor coolant pressure boundary, or containment structure. Based on the above considerations, the proposed amendment would not degrade the confidence in the ability of the fission product barriers to limit the level of radiation to the public.
Therefore the proposed change does not involve a reduction in a margin of safety.
Based on the above evaluations, Luminant Power concludes that the proposed amendment(s) present no significant hazards under the standards set forth in 10CFR50.92(c) and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable Regulatory Requirements/Criteria The Cyber Security Plan and associated implementation schedule for CPNPP Units I and 2 were approved by the NRC on July 26, 2011 via License Amendment Request 10-002.
The license amendment revised paragraph 2.H of the FOL to provide a license condition to require CPNPP to fully implement and maintain in effect all provisions of the NRC-approved Cyber Security Plan. Any change to the NRC-approved CSP implementation schedule requires prior NRC approval pursuant to 10 CFR 50.90.
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that
Attachment i to TXX-1 3168 Page 14 of 14 11/21/2013 the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
The proposed amendment revises the Milestone 8 full implementation date for the CPNPP Unit 1 and Unit 2 Cyber Security Plan. This proposed amendment will not involve any significant construction impacts. Pursuant to 10 CFR 51.22(c)(12), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 PRECEDENTS None
8.0 REFERENCES
8.1 Letter logged TXX-10097 dated July 15, 2010, from Rafael Flores to the NRC submitting License Amendment Request (LAR)10-002, for approval of the CPNPP Cyber Security Plan 8.2 Letter from the NRC to Rafael Flores dated July 26, 2011, approving the CPNPP Cyber Security Plan and proposed Cyber Security Plan Implementation Schedule 8.3 Letter logged TXX-10138 dated September 27, 2010, from Rafael Flores to the NRC, "Notification Letter Designating Comanche Peak Nuclear Power Plant (CPNPP) Balance of Plant Systems Within the Cyber Security Rule Scope" 8.4 Letter logged TXX-10155 dated November 30, 2010, from Rafael Flores to the NRC, "Update to Notification Letter Designating Comanche Peak Nuclear Power Plant (CPNPP) Balance of Plant Systems Within the Cyber Security Rule Scope" 8.5 Letter logged TXX-11043 dated March 31, 2011, from Rafael Flores to the NRC, "Response to the Request for Additional Information Regarding Revision to the Facility Operating License and Request for Review and Approval of the Cyber Security Plan (Tac Nos. ME4251 And ME4252)"
8.6 NEI 08-09, Revision 6, April 2010, "Cyber Security Plan for Nuclear Power Reactors."
8.7 Memorandum dated July 1, 2013 from Barry Westreich of the Cyber Security Directorate to Tom Blount, Director, Division of Reactor Safety, Region IV, "Enhanced Guidance for Licensee Near-Term Corrective Actions to Address Cyber Security Inspection Findings and Licensee Eligibility for 'Good-Faith' Attempt Discretion"
ATTACHMENT 2 to TXX-13168 PROPOSED FACILITY OPERATING LICENSE CHANGES (MARK-UP)
Pages 8 (Unit 1) 8 (Unit 2)
H. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the physical security, guard training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21, are entitled: "Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through May 15, 2006, with limited approvals as provided for in the Safety Evaluation by the Office of Nuclear Reactor Regulation dated December 5, 2000; "Comanche Peak Steam Electric Station Security Training and Qualification Plan" with revisions submitted through May 15, 2006; and "Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through May 15, 2006. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
Luminant Generation Company LLC CSP was approved by License Amendment No. 155.
I. The li ensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of t Atomic Energy Act of 1954, as amended, to cover public liability claims.
J. NT USED K. his license is effective as of the date of issuance and shall expire at Midnight on ebruary 2, 2033.
as supplemented by a change approved FOR THE NUCLEAR REGULATORY COMMISSION by License Amendment No. XXX original signed by:
Thomas E. Murley, Director Office of Nuclear Reactor Regulation Attachments/Appendices:
- 1. Appendix A - Technical Specifications (NUREG-1468)
- 2. Appendix B - Environmental Protection Plan
- 3. Appendix C - Antitrust Conditions Date of Issuance: April 6, 1993 Unit 2 Amendment No. 68, 82, 80, 00, 13, 155 Revised by letter dated July 26, 2007
(3) Luminant Generation Company LLC shall promptly notify the NRC of any attempts by subsurface mineral rights owners to exercise mineral rights, including any legal proceeding initiated by mineral rights owners against Luminant Generation Company LLC.
G. Luminant Generation Company LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report through Amendment 78 and as approved in the SER (NUREG-0797) and its supplements through SSER 24, subject to the following provision:
Luminant Generation Company LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
H. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21, are entitled: "Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through May 15, 2006, with limited approvals as provided for in the Safety Evaluation by the office of Nuclear Reactor Regulation dated December 5, 2000; "Comanche Peak Steam Electric Station Security Training and Qualification Plan" with revisions submitted through May 15, 2006; and "Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through May 15, 2006. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). Luminant Generation Company LLC CSP was approved by License Amendment No. 155.
The licensees shall have and maintain financial protection of such type and n such amounts as the Commission shall require in accordance with Sectio 170 of the Atomic Energy Act of 1954, as amended, to cover public liability ims.
J. NOT USED
, as supplemented by a change approved by License Amendment XXX Unit 1 Amendment No. 68, 82, 90, 139, 155 Revised by letter dated March 15, 2007
ATTACHMENT 3 to TXX-13168 RETYPED FACILITY OPERATING LICENSE CHANGES Pages 8 (Unit 1) 8 (Unit 2)
(3) Luminant Generation Company LLC shall promptly notify the NRC of any attempts by subsurface mineral rights owners to exercise mineral rights, including any legal proceeding initiated by mineral rights owners against Luminant Generation Company LLC.
G. Luminant Generation Company LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report through Amendment 78 and as approved in the SER (NUREG-0797) and its supplements through SSER 24, subject to the following provision:
Luminant Generation Company LLC may make changes to the approved fire protection program without prior approval of the Commission only ifthose changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
H. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21, are entitled: "Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through May 15, 2006, with limited approvals as provided for in the Safety Evaluation by the office of Nuclear Reactor Regulation dated December 5, 2000; "Comanche Peak Steam Electric Station Security Training and Qualification Plan" with revisions submitted through May 15, 2006; and "Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through May 15, 2006. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). Luminant Generation Company LLC CSP was approved by License Amendment No. 155, as supplemented by a change approved by License Amendment XXX.X The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
J. NOT USED Unit 1 Amendment No. 68, 82, 90, 139,1*5,
H. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the physical security, guard training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21, are entitled: "Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through May 15, 2006, with limited approvals as provided for in the Safety Evaluation by the Office of Nuclear Reactor Regulation dated December 5, 2000; "Comanche Peak Steam Electric Station Security Training and Qualification Plan" with revisions submitted through May 15, 2006; and "Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through May 15, 2006. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
Luminant Generation Company LLC CSP was approved by License Amendment No. 155, as supplemented by a change approved by License Amendment No.
XXX.
- 1. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
J. NOT USED K. This license is effective as of the date of issuance and shall expire at Midnight on February 2, 2033.
FOR THE NUCLEAR REGULATORY COMMISSION original signed by:
Thomas E. Murley, Director Office of Nuclear Reactor Regulation Attachments/Appendices:
- 1. Appendix A - Technical Specifications (NUREG-1468)
- 2. Appendix B - Environmental Protection Plan
- 3. Appendix C - Antitrust Conditions Date of Issuance: April 6, 1993 Unit 2 Amendment No. 68, 82,89, 90, 139, 155,