ML13350A133
| ML13350A133 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/13/2013 |
| From: | Matt Bartlett Plant Licensing Branch IV |
| To: | Hope T Luminant Generation Co |
| References | |
| MF3216, MF3217 | |
| Download: ML13350A133 (2) | |
Text
1 NRR-PMDAPEm Resource From:
Bartlett, Matthew Sent:
Friday, December 13, 2013 12:47 PM To:
timothy.hope@luminant.com Cc:
Jack.Hicks@luminant.com
Subject:
RE: Comanche Peak LAR for Cyber Security Plan Milestone 8 Implementation Date (TAC MF3216 and MF3217)
By "CP-201301322, License Amendment Request (LAR)13-003, for Approval of the Revised CPNPP [[Topic" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Plan Implementation Schedule|letter dated November 21, 2013]] (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML13338A436), Luminant Generation Company, LLC submitted a license amendment request for Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2, for a proposed change to the CPNPP Cyber Security Plan (CSP) Milestone 8 full implementation date. The proposed change modifies the Milestone 8 full implementation date to June 30, 2017. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact Balwant Singal at (301) 415-3016 or the back-up project manager Joe Sebrosky (301) 415-1132.
Sincerely, Matt Bartlett NRR/DORL/LPLIV (Rotation)
(301) 415-1577
Hearing Identifier:
NRR_PMDA Email Number:
956 Mail Envelope Properties (Matthew.Bartlett@nrc.gov20131213124600)
Subject:
RE: Comanche Peak LAR for Cyber Security Plan Milestone 8 Implementation Date (TAC MF3216 and MF3217)
Sent Date:
12/13/2013 12:46:49 PM Received Date:
12/13/2013 12:46:00 PM From:
Bartlett, Matthew Created By:
Matthew.Bartlett@nrc.gov Recipients:
"Jack.Hicks@luminant.com" <Jack.Hicks@luminant.com>
Tracking Status: None "timothy.hope@luminant.com" <timothy.hope@luminant.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2219 12/13/2013 12:46:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: