CP-201000888, Submittal of Unit 1 Fourteenth Refueling Outage Inservice Inspection Summary Report (Unit 1: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 13, 2000, Second Interval)

From kanterella
(Redirected from CP-201000888)
Jump to navigation Jump to search
Submittal of Unit 1 Fourteenth Refueling Outage Inservice Inspection Summary Report (Unit 1: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 13, 2000, Second Interval)
ML102090025
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/22/2010
From: Madden F
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201000888, TXX-10090
Download: ML102090025 (7)


Text

Rafael Flores Luminant Power Senior Vice President P 0 Box 1002

& Chief Nuclear Officer 6322 North FM 56 rafael.flores@Luminant.com Glen Rose, TX 76043 Luminant T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-201000888 Ref. # 10 CFR 50.55a Log # TXX-10090 July 22, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)

DOCKET NO. 50-445 SUBMITTAL OF UNIT 1 FOURTEENTH REFUELING OUTAGE (1RF14) INSERVICE INSPECTION (ISI)

SUMMARY

REPORT (UNIT 1: 1998 EDITION OF ASME CODE SECTION XI THROUGH 2000 ADDENDA, INTERVAL START DATE - AUGUST 13, 2000, SECOND INTERVAL)

Dear Sir or Madam:

In accordance with 10CFR50.55a, Luminant Generation Company LLC (Luminant Power) transmits the Inservice Inspection Summary Report for the fourteenth refueling outage of Comanche Peak Unit 1. The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code,Section XI, paragraph IWA-6240(b). A copy of this report is also forwarded to the Chief Inspector in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4.

This communication contains no new licensing basis commitments regarding Comanche Peak Unit 1.

Should you have any questions, please contact Mr. Jack Hicks at (254)897-6725.

Sincerely, Luminant Generation Company LLC Rafael Flores By: /Ai* 2<

fred W. Madden Director, Oversight & Regulatory Affairs A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway . Comanche Peak

  • Diablo Canyon - Palo Verde
  • San Onofre. South Texas Project
  • Wolf Creek A46~/i~

U. S. Nuclear Regulatory Commission TXX-10090 Page 2 07/22/2010 Enclosure c- E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak A. Jones, TDLR Brian Welch ANII, Comanche Peak

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number CPSES U1 1RF14 Owner Luminant Power P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant)

Plant Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant)

Unit No. 1 Commercial service date August 13, 1990 Refueling outage no. 14 Current inspection interval 2 (1V, 2, 3-, 4-, other)

Current inspection period 3 (11st,2nd, 3 rd)

Edition and Addenda of Section Xl applicable to the inspection plan 1998 Edition, 2000 Addenda Date and revision of inspection plan CPSES ISI Proaram Plan, Interval 2. Rev. 5. February 22, 2007 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan. Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evatuations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. N/A Expiration Date N/A

,4 if applicable Signed . .. . .. ..- E ec~ -ar', *r Date 4/I' l/krer or Owner's Designee, Title PiVOrae*s Ma *e 1.

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of Texas and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut, have inspected the items described in this Owner's Activity Report, during the period of January 2. 2009 to June 30, 2010 and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacement, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a toss of any kind arising from or connected with this inspection.

Commissions fT)c (*IK]

Inspett s Signature National Board, State, Province and Endorsements Date 11j JvL' Zo910 This form (EO01 27) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300 OAR-1 Page I of 5

TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) to Examination Required For The Credited for This Credited (%) for Date for the Category Interval Period* The Period* Interval Remarks B-A 1 0 100 100 NOTES 3,11, 12 B-B 7 3 100 100 NOTE 9 B-D 16 2 100 100 NOTE 10 B-F 4 0 0 100 B-G-1 165 3 100 100 NOTE 4 B-G-2 30 120 100 100 NOTE 4 B-J 30 0 0 100 B-K 14 6 100 93 NOTE 7 B-L-1 1 1 100 100 NOTES 1, 3 B-L-2 0 0 0 0 NOTES 1,4 B-M-2 1 0 0 100 NOTES 1, 4 B-N-1 3 1 100 100 NOTE 2 B-N-2 1 1 100 100 NOTE 3 B-N-3 2 1 100 100 NOTE 3 B-0 2 1 100 100 NOTES 3, 13 B-P NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTES 2, 5 B-Q NOTE 8 NOTE 8 NOTE 8 NOTE 8 NOTE 8 C-A 15 4 100 100 NOTE 14 C-B 8 4 100 100 C-C 92 30 100 100 C-D 1 1 100 100 C-F-1 17 0 0 100 C-F-2 1 r0 0 100 C-G 6 2 100 100 C-H NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTE 5 D-A 172 58 100 100 D-B NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTE 5 F-A F1.10 61 28 100 100 F-A F1.20 105 64 100 100 F-A F1.30 130 66 100 100 OAR-1 Page 2 of 5

TABLE I ABSTRACT OF EXAMINATIONS AND TESTS Examination Total Total Total Total Examinations Category Examinations Examinations Examinations Credited (%) to Required For The Credited for This Credited (%) for Date for the Interval Period* The Period** Interval Remarks F-A F1.40 43 6 100 100 F-B 139 0 0 100 F-C 442 0 0 100 R-A 146 120 100 100 NOTES 6, 15

  • This column is interpreted to represent the cumulative number of exams performed to date in this period.

This column is interpreted to represent the cumulative percentage of scheduled exams for the interval which have been completed to date in this period.

NOTES:

1. Examinations for pumps and valves are limited to~components selected for examination under Examination Categories B-L-1, B-L-2, and B-M-2.
2. Examination Categories B-N-l, B-P, and B-Q do not have to follow the required percentages of Table IWB-2412-1.
3. Examinations for Examination Categories B-A, B-L-1, B-N-2, B-N-3, and B-O may be deferred to the end of the inspection interval.
4. Examinations for Examination Categories B-G-1, B-G-2, B-L-2, and B-M-2 may be deferred until disassembly of a component for maintenance, repair/replacement, or volumetric examination, Three B-M-2 examinations were not conducted during the interval since the valves in the groupings were not dissassembled for maintenance. One B-L-2 examinations was not conducted during the interval since any of the four RCPumps were not dissassembled for maintenance
5. Visual Examinations (VT-2) for system leakage tests are performed each fuel cycle, period, and interval, according to the requirements of IWA-2212 and IWA-5240. All required VT-2 examinations have been completed for this fuel cycle, except for portions of the CVCS system in packages 1-CS-2-3-1 a (work order 3533774), 1-CS-2-3-1 b (work order 3953452), 1-CS-2-3-2( work order 3856087), 1-CS-2-3-4a (work order 3855975), 1-CS-2-3-4b (work order 3855943), 1-CS-2-3-4c (work order 3855957), 1-CS-2-3-4d (work order 3855916); portions of the SI system in packages 1-SI-2-3-2b (work order 3945812), 1-SI-2-3-2d (work order 3945818), 1-SI 3-2e (work order 3945824), 1-SI-2-3-2h (work order 3945830); portions of the SF system in package 1-SF-2-3-1 b ( work order 3945841);

and portions of the SW system in packages 1-SW-2-1 -1 a ( work order 3535538), 1-SW-1 3-1 b ( work order 3935340), 1-SW-2:3-2a (work order 3535560), 1-SW-2-3-2b (work order 39353450)

6. Examination Category R-A includes previous Examination Categories B-F, B-J, C-F-i, and C-F-2.

7.. Examination Category B-K for the second period includes one Category B-K-1 examination that was completed in 1RF1 0.

8. Examination Category B-Q, Steam Generator Tubing,is reported per the requirements of the Plant Technical Specifications.
9. Replacement of the four Steam Generators with four new Steam Generators in 1RF1 2 removed six Steam Generator Category B-B welds, which were scheduled for examination in the second period. Refer to EVAL-2005-001089-02-00. Two Pressurizer Category B-B welds were rescheduled and examined in 1RF1 2 and the second period.
10. Replacement of four Steam Generators with four new Steam Generators in 1RF1 2 removed six Steam Generator Category B-D welds, which were scheduled for examination in the second period. Refer to EVAL-2005-001089-02-00. Two Pressurizer B-D welds were rescheduled and examined in 1RF1 2 and the second period. Two of the eight B-D welds for the four new Steam Generators were examined during the third period (1 RF14).
11. Only one of six B-A welds examined for Reactor Vessel Head because Head was replaced in 1RF1 2. New Reactor Vessel-Head is a forging, with no B-A welds.
12. Eighteen B-A and fourteen B-D welds for the Reactor Vessel were not examined this interval because Relief Request B-9, which was approved by NRC, allowed the examination frequency for these welds to increase from 10 to 20 years.
13. One B-0 examination was completed in 1RF09(lst period) and was not accounted for in later OAR-1 Reports. Reactor Vessel Head was replaced with a new head in 1RF12 (2nd period). Twenty five percent (1 out of 4) of the penetrations required examinations per Code and was conducted in 1RF14.
14. One C-A examination was completed in 1RF13 and was not reflected in the IRF13 OAR-1 report.
15. Examination numbers reflect changes that occurred during the interval based on the periodic evaluations/updates conducted during the first and second periods. RI-ISI is a living program and follows the requirements in a relief request, approved by the NRC in NRR Log 10027, which allows alternative RI-ISI examinations to be conducted for selected ASME Code Class 1 and 2 welds and the guidance, provided in document NEI-04-05..

OAR-1 Page 3 of 5

TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw Flaw or Relevant Condition Found Examination Item Item Description Characterization During Scheduled Section XI Category Number (IWA-3300) Examination or Test (Yes or No)

No Items I I I 4 + 4 4 I- I* I 4- 4 4 4 OAR-i Page 4 of 5

TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Flaw or Relevant Condition Found Repair, During Scheduled Repair/

Replacement Section Xl Replacement Code or Corrective Item Description Examination or Date Plan Class Measure Description of Work Test (Yes/No) Complete Number 3 Replacement Piping Replaced pipe and flange due to SW leak 01/08/09 XCC10-001 OAR-1 Page 5 of 5