|
---|
Category:Letter type:CNS
MONTHYEARCNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing2018-07-19019 July 2018 License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing CNS-18-032, Refueling Outage 22 (C2R22) Inservice Inspection Report Summary Report2018-07-12012 July 2018 Refueling Outage 22 (C2R22) Inservice Inspection Report Summary Report CNS-18-031, Notice of Enforcement Discretion (NOED) Request2018-06-18018 June 2018 Notice of Enforcement Discretion (NOED) Request CNS-18-028, 2017 Annual Radiological Environmental Operating Report2018-05-14014 May 2018 2017 Annual Radiological Environmental Operating Report CNS-18-026, Transmittal of 2017/2018 10 CFR 50.59 Evaluation Summary Report2018-05-10010 May 2018 Transmittal of 2017/2018 10 CFR 50.59 Evaluation Summary Report CNS-18-023, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System2018-05-0808 May 2018 (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System CNS-18-025, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-30030 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report CNS-18-022, Submittal of Emergency Plan Implementing Procedure2018-04-12012 April 2018 Submittal of Emergency Plan Implementing Procedure CNS-18-017, Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-22018-03-24024 March 2018 Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-2 CNS-18-015, Commitment Change Evaluation Report for 20172018-03-22022 March 2018 Commitment Change Evaluation Report for 2017 CNS-18-005, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes2018-02-0808 February 2018 Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes CNS-18-006, Submittal of Special Report 2018-01 for the Loose Parts Monitoring System Non-Functional for Greater than 30 Days2018-01-23023 January 2018 Submittal of Special Report 2018-01 for the Loose Parts Monitoring System Non-Functional for Greater than 30 Days CNS-17-058, Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukus2017-12-28028 December 2017 Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushi CNS-17-061, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information2017-12-21021 December 2017 Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information CNS-17-056, Catawba Nuclear Station Units 1 and 2, Resubmittal of Emergency Plan, Revision 17-22017-11-0101 November 2017 Catawba Nuclear Station Units 1 and 2, Resubmittal of Emergency Plan, Revision 17-2 CNS-17-056, Catawba Nuclear Station Units 1 and 2, Submittal of Emergency Plan, Revision 17-22017-10-23023 October 2017 Catawba Nuclear Station Units 1 and 2, Submittal of Emergency Plan, Revision 17-2 CNS-17-053, Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement2017-10-12012 October 2017 Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement CNS-17-048, Supplemental Response to Preliminary White Finding, Apparent Violations, and NRC Inspection Report 05000414/2017012; Enforcement Action 17-1222017-09-29029 September 2017 Supplemental Response to Preliminary White Finding, Apparent Violations, and NRC Inspection Report 05000414/2017012; Enforcement Action 17-122 CNS-17-049, Submittal of Ufsar/Selected Licensee Commitment Changes Manual2017-09-28028 September 2017 Submittal of Ufsar/Selected Licensee Commitment Changes Manual CNS-17-051, Independent Spent Fuel Storage Installation (ISFSI) Registration of Spent Fuel Storage Cask2017-09-28028 September 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration of Spent Fuel Storage Cask CNS-17-014, License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time2017-09-14014 September 2017 License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time CNS-17-050, ISFSI - Registration of Spent Fuel Storage Cask2017-09-12012 September 2017 ISFSI - Registration of Spent Fuel Storage Cask CNS-17-047, Response to NRC Inspection Report 05000414/2017012 and Preliminary White Finding2017-08-29029 August 2017 Response to NRC Inspection Report 05000414/2017012 and Preliminary White Finding CNS-17-041, ISFSI - Registration of Spent Fuel Storage Cask2017-08-15015 August 2017 ISFSI - Registration of Spent Fuel Storage Cask CNS-17-040, Withdrawal of Inservice Testing Relief Request 17-CN-002 Regarding an Alternative Method to Establish New Reference Values for Testing Chemical and Volume Control Pump2017-08-14014 August 2017 Withdrawal of Inservice Testing Relief Request 17-CN-002 Regarding an Alternative Method to Establish New Reference Values for Testing Chemical and Volume Control Pump CNS-17-039, Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump2017-07-27027 July 2017 Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump CNS-17-036, Mid-Cycle Power Uprate Ascension Startup Report2017-06-29029 June 2017 Mid-Cycle Power Uprate Ascension Startup Report CNS-17-033, Technical Specification Bases Changes2017-06-27027 June 2017 Technical Specification Bases Changes CNS-17-029, Flood Hazard Mitigating Strategies Assessment Report Submittal2017-06-20020 June 2017 Flood Hazard Mitigating Strategies Assessment Report Submittal CNS-17-030, Catawba, Unit 1, Submittal of Core Operating Limits Report (Colr) for Cycle 24 Reload Core2017-06-20020 June 2017 Catawba, Unit 1, Submittal of Core Operating Limits Report (Colr) for Cycle 24 Reload Core CNS-17-024, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations2017-05-25025 May 2017 Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations CNS-17-031, Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report2017-05-24024 May 2017 Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report CNS-17-027, Submittal of 2015/2016 10 CFR 50.59 Evaluation Summary Report2017-05-10010 May 2017 Submittal of 2015/2016 10 CFR 50.59 Evaluation Summary Report CNS-17-015, Catawba Nuclear Station, Units 1 and 2 - Submittal of 2016 Annual Radioactive Effluent Release Report2017-04-27027 April 2017 Catawba Nuclear Station, Units 1 and 2 - Submittal of 2016 Annual Radioactive Effluent Release Report CNS-17-021, Special Report 2017-01 for the Units 1 and 2 Loose Parts Monitoring System Non-Functional for Greater than 30 Days2017-04-20020 April 2017 Special Report 2017-01 for the Units 1 and 2 Loose Parts Monitoring System Non-Functional for Greater than 30 Days CNS-17-020, Application to Adopt ASME Code Case OMN-20 (CN-GRR-01) for Pump and Valve Inservice Testing2017-04-11011 April 2017 Application to Adopt ASME Code Case OMN-20 (CN-GRR-01) for Pump and Valve Inservice Testing CNS-17-008, Commitment Change Evaluation Report for 20162017-03-16016 March 2017 Commitment Change Evaluation Report for 2016 CNS-17-004, Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants.2017-01-26026 January 2017 Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants. CNS-17-002, End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report2017-01-0606 January 2017 End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report CNS-16-080, Submittal of Emergency Plan Implementing Procedure2016-12-20020 December 2016 Submittal of Emergency Plan Implementing Procedure CNS-16-077, Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-12-0808 December 2016 Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident CNS-16-066, Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task..2016-10-20020 October 2016 Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.. CNS-16-069, Submittal of Emergency Plan, Revision 16-22016-10-10010 October 2016 Submittal of Emergency Plan, Revision 16-2 CNS-16-068, Submittal of Emergency Plan Implementing Procedure Revisions2016-10-10010 October 2016 Submittal of Emergency Plan Implementing Procedure Revisions CNS-16-064, License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 242016-09-0707 September 2016 License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 24 CNS-16-061, Submittal of Design Basis Specification for the Plant Fire Protection Revision 252016-08-12012 August 2016 Submittal of Design Basis Specification for the Plant Fire Protection Revision 25 CNS-16-051, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) an2016-08-0202 August 2016 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) and CNS-16-049, ISFSI Registration of Spent Fuel Storage Cask2016-07-14014 July 2016 ISFSI Registration of Spent Fuel Storage Cask CNS-16-056, Transmittal of Emergency Plan Implementing Procedures, Including Revision 034 to RP/0/A/5000/006A and Revision 038 to RP/0/A/5000/00682016-07-13013 July 2016 Transmittal of Emergency Plan Implementing Procedures, Including Revision 034 to RP/0/A/5000/006A and Revision 038 to RP/0/A/5000/0068 CNS-16-050, Unit 2 - Ufsar/Selected Licensee Commitment Changes2016-07-12012 July 2016 Unit 2 - Ufsar/Selected Licensee Commitment Changes 2018-07-19
[Table view] Category:Status Report
MONTHYEARML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports IR 05000413/20200062021-03-0303 March 2021 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - NRC Inspection Report 05000413/2020006 and 05000414/2020006 RA-19-0159, Stations - Biennial Decommissioning Financial Assurance Reports2019-03-28028 March 2019 Stations - Biennial Decommissioning Financial Assurance Reports RA-17-0018, Duke Energy Carolinas, LLC - Biennial Decommissioning Financial Assurance Reports2017-03-29029 March 2017 Duke Energy Carolinas, LLC - Biennial Decommissioning Financial Assurance Reports CNS-15-080, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) CNS-15-071, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-0303 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) RA-15-0010, Submits Required Biennial Decommissioning Financial Assurance Reports2015-03-30030 March 2015 Submits Required Biennial Decommissioning Financial Assurance Reports CNS-15-013, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-16016 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) CNS-14-086, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) CNS-14-093, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-14014 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) CNS-14-020, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-28028 February 2014 Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) CNS-14-025, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-26026 February 2014 Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13242A0092013-08-26026 August 2013 Duke Energy - First Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13091A0222013-03-28028 March 2013 Submittal of Biennial Decommissioning Financial Assurance Reports ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML1009604182010-03-30030 March 2010 Commitment Change Evaluation Report for 2009 ML0919004522009-03-30030 March 2009 Duke Energy Carolinas, LLC - Oconee Nuclear Station Units 1,2, and 3; McGuire Nuclear Station Units 1 and 2; Catawba Nuclear Station Units 1 and 2 - Decommisionings Financial Assurance Reports ML0505405242005-02-15015 February 2005 January 2005 Monthly Operating Report for Oconee McGuire and Catawba Nuclear Stations ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2024-02-22
[Table view] |
Text
Kelvin Henderson Vice President Catawba Nuclear Station
~ENERGY.
Duke Energy CN01VP I 4800 Concord Road York, SC 29745 CNS-15-013 o: 803.701.4251 f: 803.701.3221 February 16, 2015 U.S. Nuclear Regulatory Commission (USNRC)
Attention: Document Control Desk Washington, D.C. 20555-0001 Duke Energy Carolinas, LLC (Duke Energy) 10 CFR 50.4 Catawba Nuclear Station, Units 1 and 2 Docket Numbers 50-413 and 50-414 Renewed License Numbers NPF-35 and NPF-52
Subject:
Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
References:
- 1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012, ADAMS Accession Number ML12054A679
- 2. NRC Interim Staff Guidance JLD-ISG-20J2-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012, ADAMS Accession Number ML12221A339
- 3. NEI 12-02, Industry Guidance for Compliance with NRC Order EA 051, to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1, dated August 2012, ADAMS Accession Number ML12240A307
- 4. Duke Energy letter, Duke Energy Carolinas,LLC, (Duke Energy)
Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated October 29, 2012, ADAMS Accession Number ML12307A022
- 5. Duke Energy letter, Duke Energy Carolinas,LLC, (Duke Energy)
Overall Integrated Plans in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (OrderNumber EA-12-051), dated February 28, 2013, ADAMS Accession Number ML13086A095
- 6. Duke Energy letter, Duke Energy Carolinas,LLC, (Duke Energy), First Six-Month Status Reports in Response to March 12, 2012 Commission OrderModifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (OrderNumber EA-12-051), dated August 26, 2013, ADAMS Accession Number ML13242A009
- 7. NRC letter, Catawba Nuclear Station, Units 1 and 2 - Interim Staff Evaluation and Request for Additional Information Regardingthe Overall Integrated Plan for Implementation of Order EA-12-051, Reliable .Spent Fuel Pool Instrumentation, dated October 28, 2013, ADAMS Accession Number ML13281A562 ~A~cO www.duke-energy.com
Document Control Desk Page 2 February 16, 2015
- 8. Duke Energy letter, Duke Energy Carolinas,LLC, (Duke Energy),
Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 26, 2014, ADAMS Accession Number ML14063A279
- 9. NRC Letter, Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA 051, dated March 26, 2014, ADAMS Accession Number ML14083A620
- 10. Duke Energy letter, Duke Energy Carolinas,LLC, (Duke Energy),
Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (OrderNumber EA-12-051), dated August 14, 2014, ADAMS Accession Number ML14227A717 On March 12, 2012, the NRC issued Order EA-12-051 (Reference 1) to Duke Energy.
Reference 1 was immediately effective and directed Duke Energy to have a reliable indication of water level in spent fuel storage pools. Specific requirements were outlined in Attachment 2 of Reference 1.
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan pursuant to Section IV, Condition C. Reference 2 endorsed industry guidance document NEI 12-02, Revision 1 (Reference 3) with clarifications and exceptions identified in Reference 2.
Reference 4 provided the Duke Energy initial status report regarding spent fuel pool instrumentation. Reference 5 provided the Duke Energy overall integrated plan.
Reference 1 required submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provided direction regarding the content of the status reports. Reference 6 provided the first six-month status report for Catawba. Reference 8 provided the second six-month status report for Catawba.
Reference 10 provided the third six-month status report for Catawba. The purpose of this letter is to provide the fourth six-month status report pursuant to Section IV, Condition C.2, of Reference 1 that delineates progress made in implementing the requirements of Reference 1. The enclosure to this letter provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief and the basis, if any.
In Reference 7, the NRC provided an Interim Staff Evaluation (ISE) which included a Request for Additional Information (RAI) to Catawba. The NRC requested that a response to the RAI be provided in the next six-month status report, with all information provided by September 30, 2014. Reference 9 instructed that responses to the RAI need not be formally submitted on the docket but instead can be placed on the plant-specific ePortal. Catawba did so and the NRC reviewed this information during their onsite audit the week of September 29, 2014.
-1 Document Control Desk Page 3 February 16, 2015 This submittal contains no new regulatory commitments and no revisions to existing regulatory commitments.
Should you have any questions regarding this submittal, please contact L.J. Rudy at (803) 701-3084.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 16, 2015.
Very truly yours, Kelvin Henderson Vice President, Catawba Nuclear Station LJR/s Enclosure
Document Control Desk Page 4 February 16, 2015 xc (with enclosure):
V.M. McCree Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G.A. Hutto, III Senior Resident Inspector (Catawba)
U.S. Nuclear Regulatory Commission Catawba Nuclear Station G.E. Miller (addressee only)
NRC Project Manager (Catawba)
U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 J. Folkwein American Nuclear Insurers 95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453
Enclosure Fourth Six-Month Status Report (Order EA-12-051)
Catawba Nuclear Station, Units 1 and 2 Docket Numbers 50-413 and 50-414 Renewed License Numbers NPF-35 and NPF-52 1
Catawba Nuclear Station Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation I Introduction Catawba Nuclear Station developed an Overall Integrated Plan (Reference 1 in Section 7),
documenting the requirements to install reliable spent fuel pool level instrumentation in response to NRC Order EA-1 2-051. References 2, 8, and 10 in Section 7 provided the first, second, and third six-month status reports, respectively, for Catawba Nuclear Station. This enclosure provides an update of milestone accomplishments since the submittal of the third six-month update, including any changes to the compliance method, schedule, or the need for relief/relaxation and the basis, if any, that occurred during the period from July 28, 2014 to January 31, 2015 (hereafter referred to as "the update period").
2 Milestone Accomplishments No new milestones were completed during the update period.
3 Milestone Schedule Status There are no changes to the schedule as reported in Reference 1 of Section 7.
4 Changes to Compliance Method No changes were made during the update period.
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation Catawba Nuclear Station expects to comply with the order implementation date and no relief/relaxation is required at this time.
6 Open Items from Overall Integrated Plan and Interim Staff Evaluation There are no open items documented in the Overall Integrated Plan (OIP) or in the Interim Staff Evaluation (ISE). The ISE received (Reference 7 in Section 7) included Requests for Additional Information (RAIs). Reference 9 instructs that responses to the RAIs do not need to be formally submitted on the docket but instead can be placed on the Catawba Nuclear Station ePortal.
Catawba did so and the NRC reviewed this information during their onsite audit the week of September 29, 2014.
7 References The following references support the updates to the OIP described in this enclosure.
- 1. Duke Energy Letter, Duke Energy Carolinas,LLC, (Duke Energy), Overall Integrated Plans in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (OrderNumber EA-12-051), dated February 28, 2013 2
- 2. Duke Energy Letter, Duke Energy Carolinas,LLC, (Duke Energy), FirstSix-month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated August 26, 2013
- 3. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012
- 4. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, dated August 29, 2012
- 5. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation",Revision 1, dated August 2012
- 6. Duke Energy Letter, Duke Energy Carolinas,LLC, (Duke Energy), Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-05 1),
dated October 29, 2012
- 7. NRC Letter, Catawba Nuclear Station, Units I and 2 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall IntegratedPlan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MFI060 and MF1061), dated October 28, 2013
- 8. Duke Energy Letter, Duke Energy Carolinas,LLC, (Duke Energy), Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-05 1),
dated February 26, 2014
- 9. NRC Letter, Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051, dated March 26, 2014
- 10. Duke Energy Letter, Duke Energy Carolinas,LLC, (Duke Energy), Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses
,with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-05 1),
dated August 14, 2014 3