Commitment Change Evaluation Report for 2009
ML100960418
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/30/2010
From: Morris J
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML100960418 (3)


Text

PkDuke Energy Carolinas JAMES R. MORRIS, VICE PRESIDENT Duke Energy Carolinas, LLC Catawba Nuclear Station / CN01 VP 4800 Concord Road York, SC 29745 803-831-4251 803-831-3221 fax March 30, 2010 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke)

Catawba Nuclear Station, Units 1 and 2 Docket Nos.: 50-413 and 50-414 Commitment Change Evaluation Report for 2009 Attached is a summary of commitment change evaluations completed during the 2009 calendar year for Catawba Nuclear Station. These evaluations and subsequent commitment changes were made based on the guidance defined in NEI 99-04, Guidelines for Managing NRC Commitments, and have no adverse effect on compliance with NRC rules and regulations.

Questions regarding this report should be directed to Toni Pasour at 803-701-3566.

Sincer ly, J. R. Morris Attachment

]: f-- ý- 1 --7 www. duke-energy, corn

U. S. Nuclear Regulatory Commission March 30, 2010 Page 2 xc:

L. A. Reyes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 J. H. Thompson (addressee only)

NRR Project Manager (CNS)

U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 G. A. Hutto Senior Resident Inspector (CNS)

CN01NC

Catawba Nuclear Station Annual Commitment Change Summary Report for 2009 Docket Nos. 50-413 and 50-414 I

NRC Notification Number Source Document Original Commitment Modified Commitment Required Duke Power response to NRC Inspections of nuclear safety related Inspections of nuclear safety related Yes 2009-C-001 Generic Letter 89-13, Service service water piping internal service water piping internal coatings will Water System Problems coatings will be performed one year be performed 18 months following the Affecting Safety-Related following the initial coating initial coating application. Subsequent Equipment dated January 26, application. Subsequent inspections will be performed at three to 1990 inspections will be performed at six year intervals.

three to five year intervals.