Category:Letter type:BVY
MONTHYEARBVY 25-007, Pre-Notice of Disbursement from Decommissioning Trust2025-01-27027 January 2025 Pre-Notice of Disbursement from Decommissioning Trust BVY 25-006, Report of Investigation Pursuant to 10 CFR 20, Appendix G2025-01-27027 January 2025 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 25-004, ISFSI, Submittal of Annual Radioactive Effluent Release Report2025-01-13013 January 2025 ISFSI, Submittal of Annual Radioactive Effluent Release Report BVY 25-002, Proof of Financial Protection2025-01-0606 January 2025 Proof of Financial Protection BVY 24-033, Pre-Notice Disbursement from Decommissioning Trust2024-12-17017 December 2024 Pre-Notice Disbursement from Decommissioning Trust BVY 24-031, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-12-0202 December 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-029, Defueled Safety Analysis Report, Revision 42024-11-26026 November 2024 Defueled Safety Analysis Report, Revision 4 BVY 24-030, Pre-Notice of Disbursement from Decommissioning Trust2024-11-25025 November 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-028, Pre-Notice of Disbursement from Decommissioning Trust2024-10-31031 October 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-10-30030 October 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-026, Pre-Notice of Disbursement from Decommissioning Trust2024-10-0202 October 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-013, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 20232024-03-27027 March 2024 Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2023 BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report 2025-01-06
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARBVY 23-023, License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 3F1120-02, And Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 And Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization BVY 17-004, Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2017-07-20020 July 2017 Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool BVY 17-022, License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 3162017-07-13013 July 2017 License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 316 BVY 17-005, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement2017-02-0909 February 2017 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement BVY 15-040, License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 3112015-06-24024 June 2015 License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 311 BVY 14-083, Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 32014-12-0505 December 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 3 BVY 14-062, Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions2014-09-0404 September 2014 Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions BVY 13-109, Cyber Security Plan Implementation Schedule, Proposed Change No. 3082013-12-19019 December 2013 Cyber Security Plan Implementation Schedule, Proposed Change No. 308 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-097, Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment2013-11-14014 November 2013 Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment BVY 12-084, License Amendment Request; Changes to 10CFR50.63 Licensing Basis2012-12-21021 December 2012 License Amendment Request; Changes to 10CFR50.63 Licensing Basis BVY 12-085, Technical Specifications Proposed Change No. 302 Inoperable Control Rods2012-12-17017 December 2012 Technical Specifications Proposed Change No. 302 Inoperable Control Rods BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-016, License Amendment Request to Revise License Renewal Commitments2012-03-12012 March 2012 License Amendment Request to Revise License Renewal Commitments BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-085, Proposed Change No. 296, Steam Dryer License Condition Change2011-12-22022 December 2011 Proposed Change No. 296, Steam Dryer License Condition Change BVY 11-069, Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation2011-09-29029 September 2011 Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-045, Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure2010-08-19019 August 2010 Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure BVY 10-036, Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan2010-07-16016 July 2010 Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-063, Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change2009-10-27027 October 2009 Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls ML0912001622009-05-31031 May 2009 Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station Supplement 1 BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements BVY 08-079, Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications2008-10-31031 October 2008 Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications BVY 08-055, Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes2008-09-30030 September 2008 Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-053, Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary2008-09-0404 September 2008 Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications ML0806602032008-02-12012 February 2008 Technical Specifications Proposed Change No. 273, Instrumentation Technical Specifications BVY 08-007, Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System2008-02-0606 February 2008 Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System ML0804202202008-02-0505 February 2008 License Renewal Application, Amendment 35 ML0736502282007-12-11011 December 2007 (PA-LR) VY Response to RAI 4.3.3-2 BVY 07-056, Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements2007-10-18018 October 2007 Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements BVY 07-063, Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits2007-10-18018 October 2007 Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits BVY 07-018, License Renewal Application, Amendment 262007-03-23023 March 2007 License Renewal Application, Amendment 26 ML0702402042007-01-10010 January 2007 Email: (PA-LR) Other Word File ML0701105042007-01-0404 January 2007 License Renewal Application, Amendment 23 BVY-06-100, License Renewal Application, Amendment 22, Clarification of Aging Management Program and Environmental Report Items2006-12-0404 December 2006 License Renewal Application, Amendment 22, Clarification of Aging Management Program and Environmental Report Items ML0634004532006-11-0909 November 2006 E-Mail: (NPA-PD-LR) VYNPS License Renewal Application Am. 20, Vermont Yankee BVY 06-098, License Renewal Application, Amendment 202006-11-0909 November 2006 License Renewal Application, Amendment 20 BVY 06-097, License Renewal Application, Amendment 192006-10-31031 October 2006 License Renewal Application, Amendment 19 ML0627801222006-10-12012 October 2006 Summary of a Telephone Conference Call Held on September 19, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc ML0626800342006-09-19019 September 2006 License Renewal Application, Amendment 13 2023-10-10
[Table view] Category:Technical Specification
MONTHYEARBVY 15-055, Revision of Technical Specifications Bases Pages2015-11-16016 November 2015 Revision of Technical Specifications Bases Pages BVY 15-024, Revision of Technical Specifications Bases Pages2015-03-25025 March 2015 Revision of Technical Specifications Bases Pages ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14202A2062014-07-16016 July 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 32014-06-11011 June 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-084, Revision of Technical Specification Bases Page2013-09-0909 September 2013 Revision of Technical Specification Bases Page BVY 13-053, Revision of Technical Specifications Bases Pages2013-07-24024 July 2013 Revision of Technical Specifications Bases Pages BVY 13-062, Revised of Technical Specification Bases Pages2013-06-26026 June 2013 Revised of Technical Specification Bases Pages BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit2013-05-14014 May 2013 Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 22013-04-29029 April 2013 License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 BVY 13-022, Revision of Technical Specification Bases Pages2013-03-26026 March 2013 Revision of Technical Specification Bases Pages BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information2012-11-20020 November 2012 Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information2012-08-0707 August 2012 Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 2482011-09-30030 September 2011 Revision of Technical Specification Bases Pages Due to License Amendment 248 BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves2011-05-16016 May 2011 Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 2462011-04-21021 April 2011 Revision of Technical Specification Bases Pages Due to License Amendment 246 BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-056, Submittal of Revision of Technical Specification Bases Pages2010-10-0606 October 2010 Submittal of Revision of Technical Specification Bases Pages BVY 10-047, Revision of Technical Specifications Bases Page2010-08-18018 August 2010 Revision of Technical Specifications Bases Page BVY 10-027, Revision of Technical Specification Bases Pages2010-05-21021 May 2010 Revision of Technical Specification Bases Pages BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes2010-04-13013 April 2010 Technical Specifications Proposed Change No. 290 Administrative Changes BVY 10-021, Revision of Technical Specification Bases Pages2010-03-31031 March 2010 Revision of Technical Specification Bases Pages BVY 09-074, Revision of Technical Specifications Bases Pages2009-12-0909 December 2009 Revision of Technical Specifications Bases Pages BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2362009-12-0909 December 2009 Technical Specification Bases Pages Associated with License Amendment 236 BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-055, Revision of Technical Specifications Bases Page2009-09-28028 September 2009 Revision of Technical Specifications Bases Page BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls BVY 09-044, Revision of Technical Specifications Bases Pages2009-07-28028 July 2009 Revision of Technical Specifications Bases Pages BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-021, Submittal of Revision of Technical Specification Bases Pages2009-03-31031 March 2009 Submittal of Revision of Technical Specification Bases Pages BVY 09-014, Submittal of Revised Technical Specification Bases Pages2009-02-24024 February 2009 Submittal of Revised Technical Specification Bases Pages BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations2008-12-18018 December 2008 Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 62008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 ML0836500072008-12-18018 December 2008 Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-081, Submittal of Revision of Technical Specification Bases Page 292008-11-17017 November 2008 Submittal of Revision of Technical Specification Bases Page 29 BVY 08-076, Revision of Technical Specification Bases Pages2008-10-14014 October 2008 Revision of Technical Specification Bases Pages BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems2008-09-22022 September 2008 Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-066, Submittal of Corrected Technical Specification Page2008-08-26026 August 2008 Submittal of Corrected Technical Specification Page BVY 08-060, Submittal of Revision of Technical Specification Bases Page 2202008-08-25025 August 2008 Submittal of Revision of Technical Specification Bases Page 220 BVY 08-046, Revision of Technical Specification Bases Page 972008-07-28028 July 2008 Revision of Technical Specification Bases Page 97 BVY 08-031, Revision of Technical Specification Bases Page2008-05-29029 May 2008 Revision of Technical Specification Bases Page BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications 2015-03-25
[Table view] Category:Bases Change
MONTHYEARBVY 15-055, Revision of Technical Specifications Bases Pages2015-11-16016 November 2015 Revision of Technical Specifications Bases Pages BVY 15-024, Revision of Technical Specifications Bases Pages2015-03-25025 March 2015 Revision of Technical Specifications Bases Pages ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14202A2062014-07-16016 July 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-084, Revision of Technical Specification Bases Page2013-09-0909 September 2013 Revision of Technical Specification Bases Page BVY 13-053, Revision of Technical Specifications Bases Pages2013-07-24024 July 2013 Revision of Technical Specifications Bases Pages BVY 13-062, Revised of Technical Specification Bases Pages2013-06-26026 June 2013 Revised of Technical Specification Bases Pages BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit2013-05-14014 May 2013 Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 22013-04-29029 April 2013 License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 BVY 13-022, Revision of Technical Specification Bases Pages2013-03-26026 March 2013 Revision of Technical Specification Bases Pages BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information2012-11-20020 November 2012 Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information2012-08-0707 August 2012 Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 2482011-09-30030 September 2011 Revision of Technical Specification Bases Pages Due to License Amendment 248 BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves2011-05-16016 May 2011 Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 2462011-04-21021 April 2011 Revision of Technical Specification Bases Pages Due to License Amendment 246 BVY 10-056, Submittal of Revision of Technical Specification Bases Pages2010-10-0606 October 2010 Submittal of Revision of Technical Specification Bases Pages BVY 10-047, Revision of Technical Specifications Bases Page2010-08-18018 August 2010 Revision of Technical Specifications Bases Page BVY 10-027, Revision of Technical Specification Bases Pages2010-05-21021 May 2010 Revision of Technical Specification Bases Pages BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes2010-04-13013 April 2010 Technical Specifications Proposed Change No. 290 Administrative Changes BVY 10-021, Revision of Technical Specification Bases Pages2010-03-31031 March 2010 Revision of Technical Specification Bases Pages BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2362009-12-0909 December 2009 Technical Specification Bases Pages Associated with License Amendment 236 BVY 09-074, Revision of Technical Specifications Bases Pages2009-12-0909 December 2009 Revision of Technical Specifications Bases Pages BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-055, Revision of Technical Specifications Bases Page2009-09-28028 September 2009 Revision of Technical Specifications Bases Page BVY 09-044, Revision of Technical Specifications Bases Pages2009-07-28028 July 2009 Revision of Technical Specifications Bases Pages BVY 09-021, Submittal of Revision of Technical Specification Bases Pages2009-03-31031 March 2009 Submittal of Revision of Technical Specification Bases Pages BVY 09-014, Submittal of Revised Technical Specification Bases Pages2009-02-24024 February 2009 Submittal of Revised Technical Specification Bases Pages BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations2008-12-18018 December 2008 Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 62008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 ML0836500072008-12-18018 December 2008 Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-081, Submittal of Revision of Technical Specification Bases Page 292008-11-17017 November 2008 Submittal of Revision of Technical Specification Bases Page 29 BVY 08-076, Revision of Technical Specification Bases Pages2008-10-14014 October 2008 Revision of Technical Specification Bases Pages BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems2008-09-22022 September 2008 Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-060, Submittal of Revision of Technical Specification Bases Page 2202008-08-25025 August 2008 Submittal of Revision of Technical Specification Bases Page 220 BVY 08-046, Revision of Technical Specification Bases Page 972008-07-28028 July 2008 Revision of Technical Specification Bases Page 97 BVY 08-031, Revision of Technical Specification Bases Page2008-05-29029 May 2008 Revision of Technical Specification Bases Page BVY 07-052, Revision of Technical Specification Bases Pages2007-07-31031 July 2007 Revision of Technical Specification Bases Pages BVY 07-043, Revision of Technical Specification Bases Pages2007-06-21021 June 2007 Revision of Technical Specification Bases Pages BVY 07-015, Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages2007-03-14014 March 2007 Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages BVY 06-028, Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers2006-04-22022 April 2006 Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers BVY 06-001, Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications2006-01-10010 January 2006 Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications BVY 05-099, Technical Specification Proposed Change No. 263 - Supplement No. 39 Extended Power Uprate - Risk Analysis of Containment Overpressure2005-10-26026 October 2005 Technical Specification Proposed Change No. 263 - Supplement No. 39 Extended Power Uprate - Risk Analysis of Containment Overpressure ML0529402252005-10-17017 October 2005 Technical Specification Proposed Change No. 263 - Supplement No. 36 Extended Power Uprate - Response to NRCs Letter License Conditions BVY 05-074, Transmittal of Vermont Yankee Technical Specification Proposed Change No. 263 - Supplement No. 31 Extended Power Uprate - Response for Additional Information2005-08-0404 August 2005 Transmittal of Vermont Yankee Technical Specification Proposed Change No. 263 - Supplement No. 31 Extended Power Uprate - Response for Additional Information BVY 05-072, Technical Specification Proposed Change No. 263 - Supplement No. 30 Extended Power Uprate - Response to Request for Additional Information2005-08-0101 August 2005 Technical Specification Proposed Change No. 263 - Supplement No. 30 Extended Power Uprate - Response to Request for Additional Information 2015-03-25
[Table view] |
Text
Entergy Nuclear Northeast AM Entergy Nuclear Operations, Inc.
-M Vermont Yankee 185 Old Ferry Rd.
v%'En tegy P.O. Box 500 Brattleboro, Vr 05302 Tel 802-257-5271 December 7, 2004 Docket No. 50-271 BVY 04-127 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 271 Removal of Inservice Testing Details
References:
(1) NUREG-1433, Rev. 3, Standard Technical Specifications, General Electric Plants, BWR/4, Published June 2004 In accordance with 10 CFR 50.90, Entergy Nuclear Operations, Inc. (ENO) hereby requests a change to Appendix A of the Vermont Yankee Nuclear Power Station Facility Operating License to:
(1)
Remove Technical Specification (TS) Surveillance Requirement 4.4.A.3 for the Standby Liquid Control System pressure relief valves and revise associated bases.
(2)
Remove the details of TS Surveillance Requirement 4.5.A.5 for the Recirculation pump discharge valves.
ENO has determined that this change does not involve a significant hazards consideration pursuant to 10 CFR 50.92(c). contains a description and summary safety assessment of the proposed TS change. contains the determination of no significant hazards consideration in support of the proposed TS change. Attachment 3 provides a mark-up of current TS and Bases pages indicating the proposed changes. Attachment 4 provides the retyped TS and Bases pages.
ENO requests review and approval of the proposed license amendment by September 1, 2005 and a 60 day implementation period from the date of amendment approval.
There are no new commitments being made in this submittal.
If you have any questions or require additional information, please contact Mitch McCluskie at (802) 258-4187.
-f:4
I declare under penalty of perjury that the foregoing is true and correct. Executed on December 7, 2004.
Sincerely,
{ Jag Tayer eVice President Vermont Yankee Nuclear Power Station Attachments:
- 1.
Description and Assessment of Proposed Changes to the Technical Specifications Regarding Removal of Inservice Testing Details
- 2.
No Significant Hazards Consideration
- 3.
Mark-up of Current TS and Bases Pages
- 4.
Retyped TS and Bases Pages cc:
Mr. Richard B. Ennis, Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Mail Stop 0 8 81 Washington, DC 20555 Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
ATTACHMENT I TO BVY 04-127 DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS REGARDING REMOVAL OF INSERVICE TESTING DETAILS ENTERGY NUCLEAR OPERATIONS, INC.
VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271
BVY 04-127 Docket No. 50-271 Page 1 of 3
1.0 DESCRIPTION
OF PROPOSED AMENDMENT The proposed license amendment changes Technical Specification (TS) Sections 4.4.A and 4.5.A for Vermont Yankee Nuclear Power Station (VY) regarding surveillance requirements for the Standby Liquid Control (SLC) and Low Pressure Coolant Injection (LPCI) Systems.
Specifically, the changes proposed are as follows:
- 1) Page 92, Surveillance Requirement (SR) 4.4.A.3: This SR is being deleted.
- 2) Page 97, Bases for Specifications 3.4 & 4.4: These Bases are being revised to delete discussions of pressure relief valve testing and setpoints.
- 3) Page 102, SR 5.4.A.5: This SR is being revised to remove details of recirculation pump discharge valve testing requirements.
2.0 BACKGROUND
ENO intends to remove the SLC pump discharge pressure setpoint requirements and the recirculation pump discharge valve closure timing requirements from the TS so that these values can be changed as necessary under the guidance of 10 CFR 50.59. The design details related to the safety functions of these systems will continue to be contained in the VY Updated Final Safety Analysis Report (UFSAR).
Testing requirements and details will continue to be contained in the VY Inservice Testing (IST) Program as required by TS 4.6.E.
3.0 REASON/BASIS FOR CHANGE Regulatory requirements related to the content of TSs are set forth in 10 CFR 50.36. This regulation requires that the TSs include items in eight specific categories. These categories are: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation (LCO); (3) SRs; (4) design features; (5) administrative controls; (6) decommissioning; (7) initial notification; and (8) written reports. However, the regulation does not specify the particular requirements to be included in a plant's TSs.
For LCOs, 10 CFR 50.36(c)(2)(ii) specifies four criteria to be used in determining whether a particular matter is required to be included in an LCO, as follows: (1) installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary; (2) a process variable, design feature, or operating restriction that is an initial condition of a design-basis accident (DBA) or transient analysis that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier; (3) a structure, system, or component (SSC) that is part of the primary success path, and which functions or actuates to mitigate a DBA or transient that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier; or (4) an SSC, which operating experience or probabilistic safety assessment has shown to be significant to public health and safety.
LCOs and related requirements that fall within or satisfy any of the criteria in the regulation must be retained in the TSs, while those requirements that do not fall within or satisfy these criteria may be relocated to licensee-controlled documents.
BVY 04-127 Docket No. 50-271 Page 2 of 3 The VY TSs include detailed information related to system design and testing limits. When inclusion of such information has been shown to provide little or no safety benefit, its removal from the TS may be appropriate.
In most cases, relaxations previously granted to individual plants on a plant-specific basis were the result of: (1) generic NRC actions; (2) new staff positions that have evolved from technological advancements and operating experience; or (3) resolution of the industry comments on Standard Technical Specifications (STSs). The NRC staff reviewed generic relaxations contained in STSs and found them acceptable because they are consistent with current licensing practices and the Commission's regulations.
ENO proposes to remove information from TS that describes engineered safety features (ESF) valve inservice testing (IST) requirements and acceptance criteria. This information is not contained in the improved STSs, NUREG-1433, Revision 3, "Standard Technical Specifications, General Electric Plants, BWR/4,' dated March 31, 2004.
The safety function of the SLC pressure relief valves is to prevent damage to the SLC discharge piping due to over-pressurization, thus helping to ensure the ability of the SLC system to perform its safety function of shutting down the reactor following a failure to scram event.
The safety function of the recirculation pump discharge valves is to prevent flow from the LPCI system from being diverted from the reactor vessel, thus helping to ensure the ability of the LPCI system to perform its safety function of providing core cooling following a loss of coolant accident.
Operability testing of these components ensures their capability to perform their respective safety functions. Following implementation of the proposed change, the VY TS will still require operability testing of the subject components by reference to the VY IST Program. Details of SLC pressure relief valve and recirculation pump discharge valve testing requirements will still be contained in the VY IST Program. The SLC pressure relief valve and recirculation pump discharge valve setpoint values related to the safety functions of those systems will continue to be contained in the VY UFSAR. Changes to the VY UFSAR are evaluated per the requirements of 10 CFR 50.59. These controls are adequate to ensure the required inservice testing is performed to verify the components are operable and capable of performing their respective safety functions.
Currently, VY TS SR 5.4.A.5 specifies maximum and minimum values for the closing time of the recirculation pump discharge valves.
UFSAR Section 7.4.3.5.4 includes only the maximum closing time for these valves.
The analysis for the design basis loss of coolant accident assumes that the recirculation pump discharge valves close within 33 seconds to ensure that LPCI flow is directed to the reactor vessel, rather than to the postulated break in the recirculation pump suction line, such that adequate core cooling is maintained following a loss of coolant accident. Therefore, the maximum closing time of 33 seconds is an essential input to a design basis accident analysis. However, the minimum closing time of 27 seconds, which is currently specified in TS SR 5.4.A.5 has no impact on any accident or transient analysis, and therefore does not need to be controlled either in the VY TS or any VY controlled document.
NUREG-1433 includes Section 5.5.7, Inservice Testing Program, which provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. VY TS Section 4.6.E, Structural Integrity and Operability Testing, provides these same controls and is worded, in part, as follows:
Attachment I BVY 04-127 Docket No. 50-271
-Page 3 of 3 Operability testing of safety-related pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a (0, except where specific written relief has been granted by the NRC.
VY TS Section 4.4.A.1 states, in part:
The Standby Liquid Control System shall be verified operable by testing pumps and valves in accordance with Specification 4.6.E.
After removal of recirculation pump discharge valve timing requirements, proposed VY TS Section 4.5.A.5 will state:
Operability testing of recirculation pump discharge valves and bypass valves shall be in accordance with Specification 4.6.E.
Therefore, following implementation of the proposed change, the VY TS will still require operability testing of the subject components, by reference to the VY IST Program. Details of SLC pressure relief valve and recirculation pump discharge valve testing requirements are being removed from the VY TS, but are being retained in the VY IST Program. In addition, the setpoint values related to the safety functions of those systems will continue to be contained in the VY UFSAR.
In summary, the removal of these type surveillance details and specific values is acceptable because it does not alter the TS requirements that ensure the operability of the SLC and LPCI systems. In particular, the requirements of the applicable LCOs and the associated SRs for these systems, as well as the TS definition of operability, are adequate to ensure that these systems are maintained operable. As a result, these details are not necessary to ensure the SLC and LPCI systems can perform their intended safety functions and are not required to be in the TS to provide adequate protection of the public health and safety. The removal of these details is also consistent with the improved STSs, NUREG-1433. Any changes to these details will be made in accordance with 10 CFR 50.59, as specified in the VY procedures governing changes to the VY UFSAR.
4.0 ENVIRONMENTAL CONSIDERATION
S This proposed License amendment changes SRs. VY has determined that this change involves no significant increase in the amounts, and no significant changes in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
Accordingly, VY has determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
ATTACHMENT 2 TO BVY 04-127 NO SIGNIFICANT HAZARDS DETERMINATION FOR PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS REGARDING REMOVAL OF INSERVICE TESTING'DETAILS ENTERGY NUCLEAR OPERATIONS, INC.
VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 BVY 04-127 Docket No. 50-271 Page 1 of 2 NO SIGNIFICANT HAZARDS DETERMINATION The proposed license amendment changes Technical Specification (TS) Sections 4.4.A and 4.5.A for Vermont Yankee Nuclear Power Station (VY) regarding surveillance requirements for the Standby Liquid Control (SLC) and Low Pressure Coolant Injection (LPCI) Systerns.
Specifically, the changes proposed are as follows:
- 1) Page 92, Surveillance Requirement (SR) 4.4.A.3: This SR is being deleted.
- 2) Page 97, Bases for Specifications 3.4 & 4.4: These Bases are being revised to delete discussions of pressure relief valve testing and setpoints.
- 3) Page 102, SR 5.4.A.5: This SR is being revised to remove details of recirculation pump discharge valve testing requirements.
Pursuant to 10 CFR 50.92, Entergy Nuclear Operations, Inc. (ENO) has reviewed the proposed change and concludes that the change does not involve a significant hazards consideration since the proposed change satisfies the criteria in 10 CFR 50.92(c). These criteria require that operation of the facility in accordance with the proposed amendment will not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. The discussion below addresses each of these criteria and demonstrates that the proposed amendment does not constitute a significant hazard.
The proposed change does not involve a significant hazards consideration because:
- 1.
The operation of Vermont Yankee Nuclear Power Station (VY) in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed amendment removes details of SLC pressure relief valve and recirculation pump discharge valve testing requirements from the TS. Following implementation of the proposed change, the VY TS will still require operability testing of the subject components by reference to the VY IST Program. Details of SLC pressure relief valve and recirculation pump discharge valve testing requirements will still be contained in the VY IST Program. The SLC pressure relief valve and recirculation pump discharge valve setpoint values related to the safety functions of those systems will continue to be contained in the VY UFSAR.
Changes to the VY UFSAR are evaluated per the requirements of 10 CFR 50.59. These controls are adequate to ensure the required inservice testing is performed to verify the components are operable and capable of performing their respective safety functions. The proposed amendment introduces no new equipment or changes to how equipment is operated. Neither the SLC pressure relief valves nor the recirculation pump discharge valves are initiators of any analyzed accidents. Therefore, operation of VY in accordance with the proposed amendment will BVY 04-127 Docket No. 50-271 Page 2 of 2 not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2.
The operation of Vermont Yankee Nuclear Power Station (VY) in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed amendment removes details of SLC pressure relief valve and recirculation pump discharge valve testing requirements from the TS. The -proposed amendment does not change the design or function of any component or system. No new modes of failure or initiating events are being introduced.
Therefore, operation of VY in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3.
The operation of Vermont Yankee Nuclear Power Station (VY) in accordance with the proposed amendment will not involve a significant reduction in a margin of safety.
The proposed amendment removes details of SLC pressure relief valve and recirculation pump discharge valve testing requirements from the TS. The proposed amendment does not change the design or function of any component or system. The proposed amendment does not involve any safety limits or limiting safety system settings.
Since the proposed controls are adequate to ensure the required inservice testing is performed, there will still be high assurance that the components are operable and capable of performing their respective safety functions, and that the systems will respond as designed to mitigate the subject events.
Therefore, operation of VY in accordance with the proposed amendment will not involve a significant reduction in a margin of safety.
ATTACHMENT 3 TO BVY 04-127 MARK-UP OF CURRENT TECHNICAL SPECIFICATION AND TECHNICAL SPECIFICATION BASES PAGES ENTERGY NUCLEAR OPERATIONS, INC.
VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271
VYNPS 3.4 LIMITING CONDITIONS FOR OPERATION 3.4 REACTOR STANDBY LIQUID CONTROL SYSTEM Applicability:
Applies to the operating status of the Reactor Standby Liquid Control System.
Objective:
To assure the availability of an independent reactivity control mechanism.
Specification:
A.
Normal Operation Except as specified in 3.4.B
- below, the Standby Liquid Control System shall be operable when the reactor mode switch is in either the "Startup/Hot StandbyN or "Run' position, except to allow testing of instrumentation associated with the reactor mode switch interlock functions provided:
- 1. Reactor coolant temperature is less than or equal to 212-FP
- 2. All control rods remain fully inserted in core cells containing one or more fuel assemblies; and
- 3.
No core alterations are in progress.
4.4 SURVEILLANCE REQUIREMENTS 4.4 REACTOR STANDBY LIQUID CONTROL SYSTEM A&plicability:-
Applies to the periodic testing requirement for the Reactor Standby Liquid Control System.
Objective:
To verify the operability of the Standby Liquid Control System.
Specification:
A.
Normal Operation The Standby Liquid Control System shall be verified operable by:
- 1. Testing pumps and valves in accordance with Specification 4.6.E.
A minimum flow rate of 35 gpm at 1320 psig shall be verified for each pump.
I
- 2.
Verifying the continuity of the explosive charges at least monthly.
In addition, at least once during each operating cycle, the Standby Liquid Control System shall be verified operable by:
Vt(%
Y
/jv 0g bgwe~e 00/
ffi Z14Z digJ~~-----
- 4.
Initiating one of the standby liquid control loops, excluding the primer chamber and inlet fitting, and verifying that a flow path from a pump to the reactor vessel is available.
Both loops shall be tested over the course of two operating cycles.
Amendment No. PaX S4, A-75, 219 92
VYNPS BASES:
3.4 & 4.4 REACTOR STANDBY LIQUID CONTROL SYSTEM A.
Normal Operation The design objective of the Reactor Standby Liquid Control System (SLCS) is to provide the capability of bringing the reactor.from full power to a cold, xenon-free shutdown assuming that none of the withdrawn control rods can be inserted.
To meet this objective, the Standby Liquid Control System is designed to inject a quantity of boron which produces a concentration of 800 ppm of natural boron in the.
reactor core in less than 138 minutes. An 800 ppm natural boron concentration in the reactor core is required to bring the reactbr from full power to a 5t Ak subcritical condition. An additional margin (25%
of boron) is added for possible imperfect mixing of the-dhemical solution in the reactor water. A minimum quantity of 3850 gallons of.
solution having a 10.11 natural sodium.pentaborate concentration is required to meet this shutdown requirement.
The time requirement (138 minutes) for insertion of the boron solution was selected to override the rate of reactivity insertion due to cooldown of the reactor following the xenon poison peak.
For a required 'minimum pumping rate of 3$ gallons per minute, the maximum net storage volume of the boron solution is established.as 4830 gallons.
In addition to its original design basis, the Standby Aiquid Control System also satisfies the requirements of 10CFR50.62(c)(4) on anticipated transients without scram (ATwS) by using enriched boron.
The ATWS rule adds hot shutdown and neutron absorber (i.e., boron-10) injection rate requirements that exceed the original Standby Liquid Control System design basis. However, chanfges to the Standby Liquid Control System as a result of the ATWS rule have not invalidated the original design basis.
with the reactor mode switch in the "Run" or *Startup/Hot Standby' position, shutdown capability is required. with the mode switch in
-Shutdown,' control rods are not able to be withdrawn since a control rod block is applied. This provides adequate controls to ensure that the reactor remains subcritical. With the mode switch in "Refuel,"
only a single control rod can be withdrawn from a core cell containing fuel assemblies.
Determination of adequate shutdown margin by Specification 3,.3.A ensures that the reactor will not become critical.
Therefore, the Standby Liquid Control System is not required to be operable when only a single control rod can be withdrawn.
Pump operability testing (by recirculating demineralized water to the test tank)in accordance with Specification 4.6.E is adequate to detect if failures have occurred.
Flow,LE(1>f vUeg circuitry, and trigger assembly testing at the prescribed intervals assures a high reliability of system operation capability. The maximum SLCS pump discharge pressure during the limiting ATWS event is 1320 psig.
This value is based on a peak reactor vessel lower plenum pressure of 1290 psia that occurs during the limiting ATWS event at the time of SLCS initiation, i.e., 120 seconds into the event.
There is adequate margin to prevent the SLCS relief valve from lifting.
rjmn4 L
r 6
~
vCpn~ P0s~,teei iarpn o /~80 Vd'i be~zkarp nh C'k/
_Ofpr~
Ksch ge~ pensuterarnd tyrelf vafve nofninv setp:6ivnt Recirculation of the borated solution is done during each operating cycle to ensure one suction line from the boron tank is clear. In addition, at least once during each operating cycle, one of the standby liquid control loops will be initiated to verify that a flow path from a pump to the reactor vessel is available by pumping demineralized water into the reactor vessel.
Amendment No0.
aO,
- 114, I&,
I, BYW ES--,
219 97
I.,
VYNPS 3.5 LIMITING CONDITION FOR OPERATION 4.5 SURVEILLANCE REQUIREMENT
- 5. All recirculation pump discharge valves and bypass valves shall be operable or closed prior to reactor startup.
- 6. If the requirements of Specifications 3.5.A cannot be met, an orderly shutdown of the reactor shall be initiated and the reactor shall be in a cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
B. Containment Spray Cooling Capability
- 1. Both containment cooling spray loops are required to be operable when the reactor water temperature is greater than 212 0F except that a Containment Cooling Subsystem may be inoperable for thirty days.
- 2. If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
o0fli&1&7-Y 7X5sr-4a oF
- 5. /ecirculation pump tdischarge valvesrElJ Rp'vErnstp ;"t adizy<
bassvalves shall be in accordance with Specification 4.6.E.
B. Containment Spiffy Cooling Capability
- 1. Surveillance of the drywell spray loops shall be performed as follows. During each five-year period, an air-test shall be performed on the drywell spray headers and nozzles.
I
- 2. Deleted.
Amendment No. Z-,
-GI, b44, l
-2, 209, 210 102
ATTACHMENT 4 TO BVY 04-127.
RETYPED TECHNICAL SPECIFICATION AND TECHNICAL SPECIFICATION BASES PAGES ENTERGY NUCLEAR OPERATIONS, INC.
VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271
VYNPS 3.4 LIMITING CONDITIONS FOR OPERATION 4.4 SURVEILLANCE REQUIREMENTS 3.4 REACTOR STANDBY LIQUID CONTROL SYSTEM Applicability:
Applies to the operating status of the Reactor Standby Liquid Control System.
Objective:
To assure the availability of an independent reactivity control mechanism.
Specification:
A. Normal Operation Except as specified in 3.4.B below, the Standby Liquid Control System shall be operable when the reactor mode switch is in either the "Startup/Hot Standby" or "Run" position, except to allow testing of instrumentation associated with the reactor mode switch interlock functions provided:
- 1. Reactor coolant temperature is less than or equal to 2120 F; 4.4 REACTOR STANDBY LIQUID CONTROL SYSTEM Applicability:
Applies to the periodic testing requirement for the Reactor Standby Liquid Control System.
Objective:
To verify the operability of the Standby Liquid Control System.
Specification:
A. Normal Operation The Standby Liquid Control System shall be verified operable by:
- 1. Testing pumps and valves in accordance with Specification 4.6.E.
A minimum flow rate of 35 gpm at 1320 psig shall be verified for each pump.
- 2. Verifying the continuity of the explosive charges at least monthly.
In addition, at least once during each operating cycle, the Standby Liquid Control System shall be verified operable by:
- 3. Deleted
- 4. Initiating one of the standby liquid control loops, excluding the primer chamber and inlet fitting, and verifying that a flow path from a pump to the reactor vessel is available.
Both loops shall be tested over the course of two operating cycles.
- 2. All control rods remain fully inserted in core cells containing one or more fuel assemblies; and
- 3. No core alterations are in progress.
Amendment No. 142, ad-, 4-4, 4r-S, 4i9 92
VYNPS BASES:
3.4 & 4.4 REACTOR STANDBY LIQUID CONTROL SYSTEM A. Normal Operation The design objective of the Reactor Standby Liquid Control System (SLCS) is to provide the capability of bringing the reactor from full power to a cold, xenon-free shutdown assuming that none of the withdrawn control rods can be inserted.
To meet this objective, the Standby Liquid Control System is designed to inject a quantity of boron which produces a concentration of 800 ppm of natural boron in the reactor core in less than 138 minutes. An 800 ppm natural boron concentration in the reactor core is required to bring the reactor from full power to a 5% Ak subcritical condition. An additional margin (25%
of boron) is added for possible imperfect mixing of the chemical solution in the reactor water. A minimum quantity of 3850 gallons of solution having a 10.1% natural sodium pentaborate concentration is required to meet this shutdown requirement.
The time requirement (138 minutes) for insertion of the boron solution was selected to override the rate of reactivity insertion due to cooldown of the reactor following the xenon poison peak.
For a required minimum pumping rate of 35 gallons per minute, the maximum net storage volume of the boron solution is established as 4830 gallons.
In addition to its original design basis, the Standby Liquid Control System also satisfies the requirements of 10CFR50.62(c)(4) on anticipated transients without scram (ATWS) by using enriched boron.
The ATWS rule adds hot shutdown and neutron absorber (i.e., boron-10) injection rate requirements that exceed the original Standby Liquid Control System design basis.
However, changes to the Standby Liquid Control System as a result of the ATWS rule have not invalidated the original design basis.
With the reactor mode switch in the "Run" or "Startup/Hot Standby" position, shutdown capability is required.
With the mode switch in "Shutdown," control rods are not able to be withdrawn since a control rod block is applied.
This provides adequate controls to ensure that the reactor remains subcritical.
With the mode switch in "Refuel,"
only a single control rod can be withdrawn from a core cell containing fuel assemblies.
Determination of adequate shutdown margin by Specification 3.3.A ensures that the reactor will not become critical.
Therefore, the Standby Liquid Control System is not required to be operable when only a single control rod can be withdrawn.
Pump operability testing (by recirculating demineralized water to the test tank)in accordance with Specification 4.6.E is adequate to detect if failures have occurred.
Flow, circuitry, and trigger assembly testing at the prescribed intervals assures a high reliability of system operation capability.
The maximum SLCS pump discharge pressure during the limiting ATWS event is 1320 psig.
This value is based on a peak reactor vessel lower plenum pressure of 1290 psia that occurs during the limiting ATWS event at the time of SLCS initiation, i.e.,
120 seconds into the event.
There is adequate margin to prevent the SLCS relief valve from lifting.
Recirculation of the borated solution is done during each operating cycle to ensure one suction line from the boron tank is clear. In addition, at least once during each operating cycle, one of the standby liquid control loops will be initiated to verify that a flow path from a pump to the reactor vessel is available by pumping demineralized water into the reactor vessel.
Amendment No. 140, 444, 1S, 4.7S, BVY 03 38, 24-9 97
VYNPS 3.5 LIMITING CONDITION FOR OPERATION 4.5 SURVEILLANCE REQUIREMENT
- 5. All recirculation pump discharge valves and bypass valves shall be operable or closed prior to reactor startup.
- 6. If the requirements of Specifications 3.5.A cannot be met, an orderly shutdown of the reactor shall be initiated and the reactor shall be in a cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
B. Containment Spray Cooling Capability
- 1. Both containment cooling spray loops are required to be operable when the reactor water temperature is greater than 2120 F except that a Containment Cooling Subsystem may be inoperable for thirty days.
- 2. If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 5. Operability testing of recirculation pump discharge valves and bypass valves shall be in accordance with Specification 4.6.E.
B. Containment Spray Cooling Capability
- 1. Surveillance of the drywell spray loops shall be performed as follows.
During each five-year period, an air test shall be performed on the drywell spray headers and nozzles.
- 2. Deleted.
Amendment No. G4, 3a,
- g4e, G4-8, A28, -G49, 210 102