MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000271/20220022023-02-22022 February 2023 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report No. 05000271/2022002 BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond ML22347A2792022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 IR 05000271/20224012022-12-15015 December 2022 NRC Inspection Report No. 05000271/2022401, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont (Letter Only) BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust ML22273A1492022-10-0404 October 2022 Review of Decommissioning Funding Status 2022 BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20220012022-08-0101 August 2022 NRC Inspection Report No. 05000271/2022001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate 2024-01-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARBVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization BVY 17-004, Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2017-07-20020 July 2017 Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool BVY 17-022, License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 3162017-07-13013 July 2017 License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 316 BVY 17-005, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement2017-02-0909 February 2017 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement BVY 15-040, License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 3112015-06-24024 June 2015 License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 311 BVY 14-083, Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 32014-12-0505 December 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 3 BVY 14-062, Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions2014-09-0404 September 2014 Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions BVY 13-109, Cyber Security Plan Implementation Schedule, Proposed Change No. 3082013-12-19019 December 2013 Cyber Security Plan Implementation Schedule, Proposed Change No. 308 BVY 13-097, Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment2013-11-14014 November 2013 Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 12-084, License Amendment Request; Changes to 10CFR50.63 Licensing Basis2012-12-21021 December 2012 License Amendment Request; Changes to 10CFR50.63 Licensing Basis BVY 12-085, Technical Specifications Proposed Change No. 302 Inoperable Control Rods2012-12-17017 December 2012 Technical Specifications Proposed Change No. 302 Inoperable Control Rods BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-016, License Amendment Request to Revise License Renewal Commitments2012-03-12012 March 2012 License Amendment Request to Revise License Renewal Commitments BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-085, Proposed Change No. 296, Steam Dryer License Condition Change2011-12-22022 December 2011 Proposed Change No. 296, Steam Dryer License Condition Change BVY 11-069, Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation2011-09-29029 September 2011 Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-045, Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure2010-08-19019 August 2010 Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure BVY 10-036, Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan2010-07-16016 July 2010 Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-063, Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change2009-10-27027 October 2009 Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls ML0912001622009-05-31031 May 2009 Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station Supplement 1 BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements BVY 08-079, Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications2008-10-31031 October 2008 Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications BVY 08-055, Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes2008-09-30030 September 2008 Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-053, Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary2008-09-0404 September 2008 Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications ML0806602032008-02-12012 February 2008 Vermont Yankee, Technical Specifications Proposed Change No. 273, Instrumentation Technical Specifications BVY 08-007, Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System2008-02-0606 February 2008 Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System ML0804202202008-02-0505 February 2008 Vermont Yankee - License Renewal Application, Amendment 35 ML0736502282007-12-11011 December 2007 (PA-LR) VY Response to RAI 4.3.3-2 BVY 07-056, Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements2007-10-18018 October 2007 Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements BVY 07-063, Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits2007-10-18018 October 2007 Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits BVY 07-018, License Renewal Application, Amendment 262007-03-23023 March 2007 License Renewal Application, Amendment 26 ML0702402042007-01-10010 January 2007 Email: (PA-LR) Other Word File ML0701105042007-01-0404 January 2007 Vermont Yankee - License Renewal Application, Amendment 23 ML0634201782006-12-0404 December 2006 2006/12/04-Vermont Yankee Nuclear Power Station, License Renewal Application, Amendment 22, Clarification of Aging Management Program and Environmental Report Items ML0634004532006-11-0909 November 2006 2006/11/09-E-Mail: (NPA-PD-LR) VYNPS License Renewal Application Am. 20, Vermont Yankee BVY 06-097, 2006/10/31-Vermont Yankee License Renewal Application, Amendment 192006-10-31031 October 2006 2006/10/31-Vermont Yankee License Renewal Application, Amendment 19 ML0627801222006-10-12012 October 2006 Summary of a Telephone Conference Call Held on September 19, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc ML0626800342006-09-19019 September 2006 2006/09/19-Vermont Yankee License Renewal Application, Amendment 13 ML0625504392006-09-0505 September 2006 License Renewal Application, Amendment 12 2023-10-10
[Table view] |
Text
October 12, 2006 LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Vermont Yankee Nuclear Power Station
SUBJECT:
SUMMARY
OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 19, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., (ENO) held a telephone conference call on September 19, 2006, to discuss and clarify the staffs requests for additional information (RAIs) and other issues concerning the Vermont Yankee Nuclear Station (VYNPS) license renewal application (LRA).
The conference call was useful in clarifying the staffs questions. provides a listing of the conference call participants. Enclosure 2 contains a listing of the issues discussed with the applicant, including a brief discussion of the items status.
The applicant had an opportunity to comment on this summary.
/RA/
Jonathan Rowley, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosures:
As stated cc w/encls: See next page
ML062780122 DOCUMENT NAME: G:\ADRO\DLR\RLRB\Rowley\Vermont Yankee Summary of Telephone Conference - September 19, 20006.wpd OFFICE PM:RLRB LA:RLRB BC:RLRB NAME JRowley SFigueroa JZimmerman DMerzke DATE 10/11/06 10/06/06 10/12/06 Vermont Yankee Nuclear Power Station cc:
Regional Administrator, Region I Ms. Carla A. White, RRPT, CHP U. S. Nuclear Regulatory Commission Radiological Health 475 Allendale Road Vermont Department of Health King of Prussia, PA 19406-1415 P.O. Box 70, Drawer #43 108 Cherry Street Mr. David R. Lewis Burlington, VT 05402-0070 Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, N.W. Mr. James M. DeVincentis Washington, DC 20037-1128 Manager, Licensing Vermont Yankee Nuclear Power Station Mr. David OBrien, Commissioner P.O. Box 0500 Vermont Department of Public Service 185 Old Ferry Road 112 State Street Brattleboro, VT 05302-0500 Montpelier, VT 05620-2601 Resident Inspector Mr. James Volz, Chairman Vermont Yankee Nuclear Power Station Public Service Board U. S. Nuclear Regulatory Commission State of Vermont P.O. Box 176 112 State Street Vernon, VT 05354 Montpelier, VT 05620-2701 Director, Massachusetts Emergency Chairman, Board of Selectmen Management Agency Town of Vernon ATTN: James Muckerheide P.O. Box 116 400 Worcester Rd.
Vernon, VT 05354-0116 Framingham, MA 01702-5399 Operating Experience Coordinator Jonathan M. Block, Esq.
Vermont Yankee Nuclear Power Station Main Street 320 Governor Hunt Road P.O. Box 566 Vernon, VT 05354 Putney, VT 05346-0566 G. Dana Bisbee, Esq. Mr. John F. McCann Deputy Attorney General Director, Licensing 33 Capitol Street Entergy Nuclear Operations, Inc.
Concord, NH 03301-6937 440 Hamilton Avenue White Plains, NY 10601 Chief, Safety Unit Office of the Attorney General Mr. Gary J. Taylor One Ashburton Place, 19th Floor Chief Executive Officer Boston, MA 02108 Entergy Operations 1340 Echelon Parkway Jackson, MS 39213
Vermont Yankee Nuclear Power Station cc:
Mr. John T. Herron Ms. Stacey M. Lousteau Sr. VP and Chief Operating Officer Treasury Department Entergy Nuclear Operations, Inc. Entergy Services, Inc.
440 Hamilton Avenue 639 Loyola Avenue White Plains, NY 10601 New Orleans, LA 70113 Mr. Oscar Limpias Mr. Norman L. Rademacher Vice President, Engineering Director, NSA Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station 440 Hamilton Avenue P.O. Box 0500 White Plains, NY 10601 185 Old Ferry Road Brattleboro, VT 05302-0500 Mr. Christopher Schwartz Vice President, Operations Support Mr. Raymond Shadis Entergy Nuclear Operations, Inc. New England Coalition 440 Hamilton Avenue Post Office Box 98 White Plains, NY 10601 Edgecomb, ME 04556 Mr. Michael J. Colomb Mr. James P. Matteau Director of Oversight Executive Director Entergy Nuclear Operations, Inc. Windham Regional Commission 440 Hamilton Avenue 139 Main Street, Suite 505 White Plains, NY 10601 Brattleboro, VT 05301 Mr. Travis C. McCullough Mr. William K. Sherman Assistant General Counsel Vermont Department of Public Service Entergy Nuclear Operations, Inc. 112 State Street 440 Hamilton Avenue Drawer 20 White Plains, NY 10601 Montpelier, VT 05620-2601 Mr. Theodore Sullivan Mr. Michael D. Lyster Site Vice President 5931 Barclay Lane Entergy Nuclear Operations, Inc. Naples, FL 34110-7306 Vermont Yankee Nuclear Power Station P.O. Box 0500 Ms. Charlene D. Faison 185 Old Ferry Road Manager, Licensing Brattleboro, VT 05302-0500 440 Hamilton Avenue White Plains, NY 10601 Mr. James H. Sniezek 5486 Nithsdale Drive Mr. James Ross Salisbury, MD 21801 Nuclear Energy Institute 1776 I Street, NW, Suite 400 Mr. Garrett D. Edwards Washington, DC 20006-3708 814 Waverly Road Kennett Square, PA 19348
Vermont Yankee Nuclear Power Station cc:
Diane Curran, Esq.
Harmon, Curran, Spielberg &
Eisenberg, L.L.P 1726 M Street, NW, Suite 600 Washington, DC 20036
Note to Entergy Nuclear Operations, Inc., from Jonathan Rowley dated October 12, 2006
SUBJECT:
SUMMARY
OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 19, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION HARD COPY DLR R/F JRowley E-MAIL:
JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes JRowley RLaufer JShea CAnderson, RI RPowell, RI DScrenci, RI MModes, RI DPelton, Sr. Resident MYoung RidsOpaMail
LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 19, 2006 Participants Affiliations Jonathan Rowley U.S. Nuclear Regulatory Commission (NRC)
Kenneth Chang NRC Kaihwa Hsu NRC Duc Nguyen NRC James DeVincentis Entergy Nuclear Operations, Inc. (ENO)
Mike Metell ENO David Lach ENO Mike Hamer ENO Allan Cox ENO Jim Fitzpatrick ENO Enclosure 1
VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 19, 2006 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on September 19, 2006, to discuss and clarify the staffs requests for additional information (RAIs) and other issues concerning the Vermont Yankee Nuclear Power Station (VYNPS) license renewal application (LRA). The following issues were discussed during the telephone conference call:
RAI 3.6.2.2-N-08-1 The applicant responded to the staffs Request for Additional Information (RAI) 3.6.2.2-N-08 in a letter dated July 14, 2006, License Renewal Application, Amendment 4. In the letter the applicant stated:
Entergy, consistent with the Peach Bottom precedent, credited the [Federal Energy Regulatory Commission] FERC dam inspection program to manage the effects of aging on civil and structural elements of the [Vernon Hydroelectric Station] VHS.
A FERC letter to the previous owner of the VHS, New England Power Company (currently owned by TransCanada Hydro Northeast Inc.), dated August 6,1997 states: By letter dated June 26, 1997, you requested an exemption from filing an Independent Consultants Safety Inspection Report under Part 12, Subpart D, of the Commissions Regulations... and ...I am granting your request for an exemption from the Part 12, Subpart D requirement for submittal of an Independent Consultants Safety Inspection Report.
As the exemption is only on the filing of an Independent Consultants Safety Inspection Report under Part 12, Subpart D, describe specific Vermont Yankee Nuclear Power Station aging management activities, provide inspection reports, and describe any corrective actions that have been taken as a result of the inspection reports - as they pertain to the VHS in accordance with 10 CFR 54.21(a)(3) - since the exemption was granted.
Discussion: The staff wanted to assure the applicant understood this RAI completely. The staff wanted to prevent reiteration of the response given to the initial RAI. The staffs position and basis for the question was clearly presented. The applicant indicated to the staff that the RAI was clear.
RAI 3.6.2.2-N-08-2 Electrical components for the VHS include 2 black-start turbine generators, cables and buses for power transmission, instrumentation and control components and their associated cables and connections. The audit team found that there is an aging management program (AMP) for underground cables from Vernon tie breaker routed to Vermont Yankee. However, there appears to be no AMPs for electrical components from the tie breaker to VHS generators.
Enclosure 2
Please describe how aging effects on the rest of the electrical components will be managed during the period of extended operation.
Discussion: The staff clarified the scope of the RAI. The applicant indicated to the staff that the RAI was against their current licensing basis (CLB) and that the presence of system redundancy should be just cause not to require a AMP for those electrical components. The staff requested that the applicant prove that no aging management is required.
RAI 4.3-H-01 Table 4.3-2 on Page 4.3-4 of the VYNPS LRA indicates that the design transient of reactor startup/shutdown cycles has bounded all other transients for the reactor coolant system (RCS).
Please describe all the transients bounded and demonstrate how this bounding transient encompasses all other RCS transients (e.g. transient curves for pressure and temperature cycles). Please demonstrate that the cumulative usage factors (CUFs) are still within the limit of this revised bounding transient.
Discussion: The staff did not find the applicants response in their September 5, 2006 letter (License Renewal Application, Amendment 12) to this RAI acceptable. The staff reiterated its position. The applicant will attempt to provide an adequate supplemental response to this concern in a impending letter to the NRC.
Additional issue:
The applicant referenced the use of relief request in its Inservice Inspection aging management program (AMP B.1.15) of the license renewal application. The staff wanted to make the applicant aware of this. The staff position is that relief requests can not be used as justification for exceptions to the Generic Aging Lessons Learned (GALL) Report recommendations for license renewal.
Discussion: The applicant understood the staffs position. The applicant will amend its application.