Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 12 Startup Rept. Based on Requirement,Encl Rept Being Submitted Due to Loading of New GE13 Fuel Type for Cycle 12 Operation
ML20117N429
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/06/1996
From: Hicks G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117N432 List:
References
BSEP-96-0184, BSEP-96-184, NUDOCS 9606200403
Download: ML20117N429 (3)


Text

- _ . _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

4 CP&L Carolina Power & Light Company P.O. Box lo429 southport, NC 28461-o429 JUN 6 1996 SERIAL: BSEP 96-0184 U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324/ LICENSE NO. DPR-62 CYCLE 12 STARTUP REPORT l

Gentlemen:

In accordance with Technical Specification 6 9.1.3 for the Brunswick Steam Electric Plant, Unit 2, Carolina Power & Light Company (CP&L) hereby submits the Cycle 12 Startup Report (provided in Enclosure 1).

Brunswick Technical Specification 6.9.1.1 states that a startup report should be submitted following the " installation of a fuel that has a different design or has been manufactured by a different fuel supplier." Based on this requirement, the enclosed report is being submitted due to the loading of the new GE13 fuel type for Cycle 12 operation.

In accordance with Technical Specification 6.9.1.2, the enclosed startup report addresses tests identified in Section 14.4.1 of the Updated Final Safety Analysis Report. In accordance with Specification 6.9.1.3, the enclosed startup report is being submitted within 90 days following completion of the startup test program.

In the next scheduled revision to the Updated Final Safety Analysis Report (FSAR), CP&L plans to incorporate the necessary changes resulting from these Unit 2 Cycle 12 start-up tests into Sections 14.4.1 and 14.4.2.2 of the Updated FSAR.

Please refer any questions regarding this submittal to Mr. Mark Turkal at (910) 457-3066.

Si O 200093 G. D. Hicks Manager- Regulatory Affairs Brunswick Nuclear Plant WRM/wrm 9606200403 960606 h

DR ADOCK 050003 4 p

(

s Document Control Desk BSEP 96-0184 / Page 2 l Enclosures i

1. Brunswick Unit 2, Cycle 12 Startup Report
2. List of Regulatory Commitements j cc: U. S. Nuclear Regulatory Commission ATTN.: Mr. Stewart D. Ebneter, Regional Administrator  ;

101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323-0199 i

Mr. C. A. Patterson NRC Senior Resident inspector- Brunswick Units 1 and 2:

U.S. Nuclear Regulatory Commission  !

ATTN.: Mr. David C. Trimble, Jr. (Mail Stop OWFN 14H22) 11555 Rockville Pike Rockville, MD 20852-2738 The Monorable H. Wells Chair.: tan - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 i

l l

l

9 ENCLOSURE 1 l

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324 LICENSE NO. DPR-62 BRUNSWICK UNIT 2, CYCLE 12 STARTUP REPORT l

l i

k i

j l

.-.-- _ . ., __, _ _