WEEKMONTHYEARENS 575822025-03-03T15:44:000Start date: 3 March 2025 15:44:00 Site: Limerick Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 575782025-03-01T06:01:000Start date: 1 March 2025 06:01:00 Site: Turkey Point Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 575612025-02-19T09:24:000Start date: 19 February 2025 09:24:00 Site: South Texas Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 575152025-01-26T20:50:000Start date: 26 January 2025 20:50:00 Site: Quad Cities Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 574852025-01-04T13:55:000Start date: 4 January 2025 13:55:00 Site: Watts Bar Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 574642024-12-10T16:30:000Start date: 10 December 2024 16:30:00 Site: Arkansas Nuclear Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 574592024-12-06T04:58:000Start date: 6 December 2024 04:58:00 Site: Unswick Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 574442024-11-26T16:58:000Start date: 26 November 2024 16:58:00 Site: Perry Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 574382024-11-23T00:37:000Start date: 23 November 2024 00:37:00 Site: Watts Bar Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 574202024-11-11T22:31:000Start date: 11 November 2024 22:31:00 Site: Eaver Valley Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 574062024-10-29T15:52:000Start date: 29 October 2024 15:52:00 Site: Perry Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 574012024-10-28T17:23:000Start date: 28 October 2024 17:23:00 Site: Oconee Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 574222024-10-10T14:02:000Start date: 10 October 2024 14:02:00 Site: Millstone Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 573492024-09-27T23:22:000Start date: 27 September 2024 23:22:00 Site: Grand Gulf Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 573382024-09-25T03:04:000Start date: 25 September 2024 03:04:00 Site: Grand Gulf Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 573282024-09-18T00:05:000Start date: 18 September 2024 00:05:00 Site: Summer Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 572822024-08-21T16:00:000Start date: 21 August 2024 16:00:00 Site: Millstone Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 572792024-08-21T01:10:000Start date: 21 August 2024 01:10:00 Site: South Texas Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 572782024-08-21T00:01:000Start date: 21 August 2024 00:01:00 Site: Summer Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness ENS 572112024-07-07T19:40:000Start date: 7 July 2024 19:40:00 Site: Byron Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 571992024-06-28T06:10:000Start date: 28 June 2024 06:10:00 Site: Monticello Reporting criterion: 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 571812024-06-18T20:40:000Start date: 18 June 2024 20:40:00 Site: Perry Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 572522024-06-07T06:46:000Start date: 7 June 2024 06:46:00 Site: River Bend Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 571462024-05-26T12:20:000Start date: 26 May 2024 12:20:00 Site: South Texas Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 571302024-05-16T12:40:000Start date: 16 May 2024 12:40:00 Site: Perry Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 571262024-05-13T13:17:000Start date: 13 May 2024 13:17:00 Site: Watts Bar Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 571202024-05-09T20:29:000Start date: 9 May 2024 20:29:00 Site: FitzPatrick Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 570462024-03-23T04:04:000Start date: 23 March 2024 04:04:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(iv)(A), System Actuation ENS 570362024-03-19T15:30:000Start date: 19 March 2024 15:30:00 Site: Browns Ferry Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 570412024-03-13T10:48:000Start date: 13 March 2024 10:48:00 Site: Cooper Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 570192024-03-10T08:53:000Start date: 10 March 2024 08:53:00 Site: South Texas Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 570102024-03-05T13:20:000Start date: 5 March 2024 13:20:00 Site: Comanche Peak Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 569892024-02-22T17:03:000Start date: 22 February 2024 17:03:00 Site: Cooper Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 569382024-01-29T16:05:000Start date: 29 January 2024 16:05:00 Site: Grand Gulf Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 569442024-01-24T01:02:000Start date: 24 January 2024 01:02:00 Site: South Texas Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 569152024-01-05T15:40:000Start date: 5 January 2024 15:40:00 Site: Davis Besse Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 569122024-01-03T17:57:000Start date: 3 January 2024 17:57:00 Site: Saint Lucie Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded ENS 568962023-12-18T07:23:000Start date: 18 December 2023 07:23:00 Site: Hatch Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 568932023-12-16T01:45:000Start date: 16 December 2023 01:45:00 Site: Saint Lucie Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded ENS 568662023-11-20T15:56:000Start date: 20 November 2023 15:56:00 Site: Dresden Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 568612023-11-16T21:41:000Start date: 16 November 2023 21:41:00 Site: South Texas Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 568482023-11-10T20:13:000Start date: 10 November 2023 20:13:00 Site: South Texas Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 568112023-10-22T16:49:000Start date: 22 October 2023 16:49:00 Site: Cooper Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 566442023-07-30T16:19:000Start date: 30 July 2023 16:19:00 Site: Waterford Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 566372023-07-25T13:24:000Start date: 25 July 2023 13:24:00 Site: Millstone Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 565702023-06-13T03:33:000Start date: 13 June 2023 03:33:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 565202023-05-16T16:27:000Start date: 16 May 2023 16:27:00 Site: Wolf Creek Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 565092023-05-08T07:07:000Start date: 8 May 2023 07:07:00 Site: Cooper Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown ENS 564942023-04-30T05:00:000Start date: 30 April 2023 05:00:00 Site: Hope Creek Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded ENS 564802023-04-18T21:30:000Start date: 18 April 2023 21:30:00 Site: Comanche Peak Reporting criterion: 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 564712023-04-17T07:46:000Start date: 17 April 2023 07:46:00 Site: LaSalle Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 564582023-04-08T00:52:000Start date: 8 April 2023 00:52:00 Site: Susquehanna Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 564292023-03-23T15:45:000Start date: 23 March 2023 15:45:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 564092023-03-14T14:00:000Start date: 14 March 2023 14:00:00 Site: Susquehanna Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 563502023-02-12T13:00:000Start date: 12 February 2023 13:00:00 Site: Beaver Valley Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition ENS 563212023-01-24T07:21:000Start date: 24 January 2023 07:21:00 Site: Browns Ferry Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 562952023-01-04T06:48:000Start date: 4 January 2023 06:48:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 562412022-11-28T09:00:000Start date: 28 November 2022 09:00:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 562032022-11-04T05:06:000Start date: 4 November 2022 05:06:00 Site: LaSalle Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 561862022-10-28T00:50:000Start date: 28 October 2022 00:50:00 Site: Harris Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 561752022-10-23T08:05:000Start date: 23 October 2022 08:05:00 Site: Vogtle Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 561682022-10-18T19:40:000Start date: 18 October 2022 19:40:00 Site: Browns Ferry Reporting criterion: 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 561632022-10-14T14:07:000Start date: 14 October 2022 14:07:00 Site: Limerick Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 561352022-09-30T20:08:000Start date: 30 September 2022 20:08:00 Site: Saint Lucie Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 561282022-09-26T21:41:000Start date: 26 September 2022 21:41:00 Site: Saint Lucie Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 561162022-09-19T06:32:000Start date: 19 September 2022 06:32:00 Site: River Bend Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 560582022-08-19T17:15:000Start date: 19 August 2022 17:15:00 Site: Grand Gulf Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 560542022-08-18T01:08:000Start date: 18 August 2022 01:08:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 559972022-07-16T00:20:000Start date: 16 July 2022 00:20:00 Site: Brunswick Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 559922022-07-12T14:17:000Start date: 12 July 2022 14:17:00 Site: Browns Ferry Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 559762022-07-04T06:30:000Start date: 4 July 2022 06:30:00 Site: Quad Cities Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 559622022-06-24T16:57:000Start date: 24 June 2022 16:57:00 Site: Perry Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 559552022-06-22T02:40:000Start date: 22 June 2022 02:40:00 Site: McGuire Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 559082022-05-23T17:56:000Start date: 23 May 2022 17:56:00 Site: LaSalle Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 559072022-05-23T09:55:000Start date: 23 May 2022 09:55:00 Site: Cooper Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 559052022-05-20T14:05:000Start date: 20 May 2022 14:05:00 Site: LaSalle Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 558962022-05-13T16:11:000Start date: 13 May 2022 16:11:00 Site: Monticello Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition ENS 558942022-05-11T22:14:000Start date: 11 May 2022 22:14:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 558712022-04-29T16:51:000Start date: 29 April 2022 16:51:00 Site: FitzPatrick Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 557852022-03-12T05:50:000Start date: 12 March 2022 05:50:00 Site: Turkey Point Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 557802022-03-10T01:13:000Start date: 10 March 2022 01:13:00 Site: Brunswick Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 556822022-01-01T17:10:000Start date: 1 January 2022 17:10:00 Site: Columbia Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 556192021-12-02T00:47:000Start date: 2 December 2021 00:47:00 Site: Quad Cities Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 555932021-11-18T22:02:000Start date: 18 November 2021 22:02:00 Site: FitzPatrick Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 555292021-10-18T00:30:000Start date: 18 October 2021 00:30:00 Site: Prairie Island Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 554842021-09-23T18:43:000Start date: 23 September 2021 18:43:00 Site: Limerick Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 554512021-09-09T05:33:000Start date: 9 September 2021 05:33:00 Site: Grand Gulf Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 554482021-09-08T05:59:000Start date: 8 September 2021 05:59:00 Site: Hatch Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 554362021-08-29T23:04:000Start date: 29 August 2021 23:04:00 Site: Waterford Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(iv)(A), System Actuation ENS 554232021-08-22T09:29:000Start date: 22 August 2021 09:29:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 554212021-08-20T13:05:000Start date: 20 August 2021 13:05:00 Site: Sequoyah Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 554032021-08-11T10:34:000Start date: 11 August 2021 10:34:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 553852021-07-29T23:51:000Start date: 29 July 2021 23:51:00 Site: Columbia Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material ENS 553112021-06-16T19:50:000Start date: 16 June 2021 19:50:00 Site: Palisades Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 555582021-06-03T06:41:000Start date: 3 June 2021 06:41:00 Site: Fermi Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 552242021-04-30T03:54:000Start date: 30 April 2021 03:54:00 Site: Peach Bottom Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 551282021-03-09T08:13:000Start date: 9 March 2021 08:13:00 Site: Susquehanna Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 551182021-03-01T20:11:000Start date: 1 March 2021 20:11:00 Site: Watts Bar Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 550462020-12-23T12:53:000Start date: 23 December 2020 12:53:00 Site: LaSalle Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident ENS 550402020-12-17T20:39:000Start date: 17 December 2020 20:39:00 Site: Harris Reporting criterion: 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
[Table view] |