05000341/FIN-2014007-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Incorrect Valve Location in Procedure |
Description | The inspectors identified a finding of very low safety significance (Green) and associated NCV of Technical Specifications (TS) Section 5.4.1.a for the licensees failure to maintain Procedure 20.000.23, High RPV [Reactor Pressure Vessel] Water Level to address an RPV overfill event. Specifically, the licensee provided an incorrect location of a manual valve in the Standby Feedwater (SBFW) system. The procedure described the valve as being located in the turbine building basement, while the valve was actually located in a locked high radiation area in the north heater room. The licensee revised the procedure to include the correct location of the valve. The inspectors determined that the issue was more than minor because a reactor overfill event could impair the RCIC and HPCI systems during a fire in fire zone RW. The finding affected the Mitigating Systems cornerstone. The finding was determined to be of very low safety significance based on a detailed risk-evaluation. This finding has a cross-cutting aspect in the area of Problem Identification and Resolution because the licensee did not take effective corrective actions to address a potential reactor pressure vessel overfill event. |
Site: | Fermi ![]() |
---|---|
Report | IR 05000341/2014007 Section 1R05 |
Date counted | Sep 30, 2014 (2014Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | D Szwarc J Gilliam R Daley R Winter |
Violation of: | Technical Specification - Procedures Technical Specification |
CCA | P.3, Resolution |
INPO aspect | PI.3 |
' | |
Finding - Fermi - IR 05000341/2014007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Fermi) @ 2014Q3
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||