IR 05000341/2014404

From kanterella
Jump to navigation Jump to search
IR 05000341-14-404; on 03/17/2014 - 03/20/2014; Fermi Power Plant, Unit 2; Routine Security Baseline Inspection. (Cover Letter Only)
ML14114A362
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/22/2014
From: Richard Skokowski
Plant Support Branch II
To: Plona J
Detroit Edison, Co
Gregory Hansen
References
IR-14-404
Download: ML14114A362 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ril 22, 2014

SUBJECT:

FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2014404

Dear Mr. Plona:

On March 20, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on March 20, 2014, with Ms. J. Ford and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure:

Inspection Report 05000341/2014404(DRS)

w/Attachment: Supplemental Information cc w/encl: N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl: Distribution via LISTSERV