| | Q | CCA | Title |
|---|
| 05000341/FIN-2013008-05 | 2013Q3 | | Battery Testing Not in Conformance with Design Standard |
| 05000341/FIN-2013008-04 | 2013Q3 | | Untimely Resolution of Non-Conservative Battery Technical Specification |
| 05000341/FIN-2013008-03 | 2013Q3 | | Failure to Correct Non-Conservative Technical Specification |
| 05000341/FIN-2013008-02 | 2013Q3 | | Design Loads for ECCS Suction Strainer Modification Not in Conformance with Design Basis Plant Unique Analysis Report |
| 05000341/FIN-2013008-01 | 2013Q3 | | Battery Rack Configuration Not in Accordance with Design Basis |
| 05000341/FIN-2013005-05 | 2013Q4 | | Nonconforming Materials Used in EDG Air Coolant Piping System |
| 05000341/FIN-2013005-04 | 2013Q4 | | Evaluation of Apparent Unacceptable Preconditioning of High Pressure Coolant System Air Operated Valve Prior to Stroke Time Testing |
| 05000341/FIN-2013021-01 | 2013Q4 | H.12 | Security |
| 05000341/FIN-2013005-03 | 2013Q4 | H.12 | Failure to Correctly Connect Thermocouple Wiring During Maintenance Resulted in Inoperable Reactor Core Isolation Cooling System Isolation Instrumentation |
| 05000341/FIN-2013005-02 | 2013Q4 | | Acceptance Criteria for UHS Level and Temperature Did Not Consider Instrument Uncertainties |
| 05000341/FIN-2013005-01 | 2013Q4 | | RHR Pump Seal Cooler Testing Was Not Adequately Implemented |
| 05000341/FIN-2014002-01 | 2014Q1 | | Failure to Perform Appropriate Preventive Maintenance on Reactor Building Heating, Ventilation, and Air Conditioning Components |
| 05000341/FIN-2014002-02 | 2014Q1 | H.1 | Failure to Control the Work Hours of a Covered Worker |
| 05000341/FIN-2013408-01 | 2014Q1 | H.5 | Security |
| 05000341/FIN-2014002-04 | 2014Q1 | | Failure to Perform Inservice Testing of High Pressure Coolant Injection and Reactor Core Isolation Cooling System Valves |
| 05000341/FIN-2014002-05 | 2014Q1 | | Use of Delta Suit Respirator |
| 05000341/FIN-2014002-03 | 2014Q1 | | Unacceptable Preconditioning of High Pressure Coolant Injection System Air-Operated Valve Prior to Stroke Time Test Measurement |