Re Manual Reactor Shutdown During Loss of Offsite Power Event
ML042940507
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/13/2004
From: Hinds D
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 04-0140 LER 04-002-00
Download: ML042940507 (10)


LER-2004-002, Re Manual Reactor Shutdown During Loss of Offsite Power Event
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(ii)

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(v), Loss of Safety Function
3252004002R00 - NRC Website

text

Progress Energy OCT 13 2004 SERIAL: BSEP 04-0140 10 CFR 50.73 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit No. 1 Docket No. 50-325/License No. DPR-71 Licensee Event Report 1-2004-002 Gentlemen:

In accordance with the Code of Federal Regulations, Title 10, Part 50.73, Carolina Power

& Light Company, now doing business as Progress Energy Carolinas, Inc., submits the enclosed Licensee Event Report. This report fulfills the requirement for a written report within sixty (60) days of a reportable occurrence.

Please refer any questions regarding this submittal to Mr. Edward T. O'Neil, Manager - Support Services, at (910) 457-3512.

Sincerely, David H. Hinds Plant General Manager Brunswick Steam Electric Plant SFT/sft Enclosure: Licensee Event Report Progress Energy Carolinas. Inc.

9 Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461

Document Control Desk BSEP 04-0140 / Page 2 cc (with enclosure):

U. S. Nuclear Regulatory Commission, Region II ATI'N: Dr. William D. Travers, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Eugene M. DiPaolo, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission ATTN: Ms. Brenda L. Mozafari (Mail Stop OWFN 8G9) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-051

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 EXPIRES: 06/30/2007 (6-2004)

, the NRC (See reverse for required number of may not conduct or sponso, and a person Is not required to respond to Om digits/characters for each block)

Infmation collection

3. PAGE Brunswick Steam Electric Plant (BSEP), Unit 1 05000325 1 of 8
4. TITLE Manual Reactor Shutdown During Loss of Offsite Power Event
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED MO DAY YEAR YEAR l SEQUENTIAL I REV MO DAY YEAR FACILITY NAME DOCKET NUMBER NUMBER NO BSEP, Unit 2 05000324 08 142004 2004 - 002 --

00 10 13 200400

9. OPERATING
11. THIS REPORT IS SUBMrTTED PURSUANT TO THE REQUIREMENTS OF 10 CFR i: (Checkone ormore)

MODE 202201(b) 202203(a)(3)(ii) 50.73(a)(2)(11)(b) 50.73(a)(2)(ix)(A)

10. POWER 202201 (d) 20.2203(a)(4) 50.73(a)(2)(ii) 50.73(a)(2)(x)

LEVEL 67

_ 202203(a)(1)

_50.36(C)(1)()(A)

X b0.73(a)(2)Qv)(A) 73.71(a)(4)

I 20.2203(a)(2)(i) 50.36(c)(1)(ii)(A) 50.73(a)(2)(v)(A) 73.71 (a)(5) 202203(a)(2)ii) 50.36(c)(2) 50.73(a)(2)(v)(B)

OTHER 20_

2_3(a)(2)(iii)_

50.46(a)(3)(_i) 50.73(a)(2)(v)(C)

Specify In Abstract below or 20.203()(2(iii 5046()(3)ii)________________

In (If more space Is required, use additional copies of (If more space is required, use additional copies of (If more space Is required, use additional copies of (it more space Is required, use additional copies of (If more space Is required, use additional copies of NRC Form 366A) (17)

COMMITMENTS

Those actions committed to by Progress Energy Carolinas, Inc. (PEC) in this document are identified below.

Any other actions discussed in this submittal represent intended or planned actions by PEC. They are described for the NRC's information and are not regulatory commitments. Please notify the Manager -

Support Services at BSEP of any questions regarding this document or any associated regulatory

commitments

No regulatory commitments are contained in this report. Those actions discussed in this submittal will be implemented in accordance with corrective action program requirements.

LICENSEE EVENT REPORT (LER)

Unit 1 Switchyard Arrangement WEATHERSPOON DELCO EAST I

JACKSONVILLE CASTLE HAYNE EAST A'

1 B 230kV

~4 2

1 2

4-

,CB/

4B 2

12 PCB l

24A 2

IN1A I'

- a22 1

I1 I

k 1

230kV U1U U-1 MAIN TITRANSFORMER U-1 MAIN GENERATOR U-1 UAT 0

U1 riril SAT