| Q | CCA | Title |
---|
05000368/FIN-2013012-05 | 2014Q1 | H.2 | Failure to Follow the Materials Handling Program during the Unit 1 Generator Stator Move |
05000313/FIN-2014002-01 | 2014Q1 | H.13 | Failure to Maintain Alternate ac Diesel Generator Governor |
05000313/FIN-2013012-03 | 2014Q1 | | Failure to Scope Required Components in the Stations Maintenance Rule Monitoring Program |
05000368/FIN-2013012-02 | 2014Q1 | P.5 | Main Feedwater Regulating Valve Maintenance Practices |
05000313/FIN-2013012-01 | 2014Q1 | H.7 | Failure to Adequately Develop and Implement Adequate Procedural Controls to Remediate the Anticipated Effects of Internal Flooding for Either Unit |
05000313/FIN-2013406-01 | 2014Q1 | | Security |
05000368/FIN-2014002-03 | 2014Q1 | | Failure to Land Signal Wire From Differential Relay Output to Generator Lockout Relay |
05000368/FIN-2014002-02 | 2014Q1 | | Failure to Correctly Install Flexible Link Bolted Connection on Phase C of 6.9 kV Bus |
05000368/FIN-2014007-01 | 2014Q1 | | Failure to Reassess the Effects of Aging |
05000313/FIN-2013012-04 | 2014Q1 | H.2 | Failure to Follow the Materials Handling Program during the Unit 1 Generator Stator Move |
05000368/FIN-2014003-09 | 2014Q2 | | Reporting of Unit 2 Events as Unplanned Scrams with Complications |
05000313/FIN-2014003-08 | 2014Q2 | H.8 | Failure to Establish, Implement, and Maintain Appropriate Changes to the Offsite Dose Dose Caculation Manual Fort Airborne Sampling |
05000313/FIN-2014003-03 | 2014Q2 | H.9 | Failure to Repair a Through Wall Flaw in Spent Fuel Pool Piping |
05000313/FIN-2014003-04 | 2014Q2 | H.14 | Failure to Follow Procedures for Through Wall Leaks |
05000313/FIN-2014003-02 | 2014Q2 | H.1 | Failure to Evaluate Reactor Cooler Sample System Piping Flaws |
05000313/FIN-2014003-01 | 2014Q2 | H.1 | Failure to Evaluate a Spent Fuel Pool Piping Flaw |
05000368/FIN-2014003-05 | 2014Q2 | | Proper ASME Code Classification of RCS Sample System |
05000368/FIN-2014003-06 | 2014Q2 | | Inservice Testing of the Diesel Fuel Oil Transfer Piping |
05000313/FIN-2014003-07 | 2014Q2 | P.5 | Inadequate Filling and Venting of High Pressure Injection Pump |
05000368/FIN-2014004-02 | 2014Q3 | P.2 | Failure to Establish Preventative Maintenance on Unit 2 Main Steam Isolation Valves |
05000313/FIN-2014009-01 | 2014Q3 | H.6 | Inadequate Flood Protection for Auxiliary and Emergency Diesel Fuel Storage Buildings |
05000368/FIN-2014004-03 | 2014Q3 | H.9 | Failure to Implement Procedural Requirements for Axial Shape Index during a Rapid Power Reduction |
05000313/FIN-2014004-01 | 2014Q3 | | Improper Maintenance on Circuit Breaker Caused Loss of Unit 1 Decay Heat Removal Pump |
05000368/FIN-2014005-05 | 2014Q4 | | Unit 2 Unplanned Scrams Performance Indicator |
05000313/FIN-2014005-03 | 2014Q4 | P.2 | Failure to Correct Weaknesses During Drills and Exercises |
05000368/FIN-2014005-01 | 2014Q4 | H.12 | Failure to Develop Adequate Guidance for Extreme Damage Mitigation |
05000313/FIN-2014403-02 | 2014Q4 | | Security |
05000313/FIN-2014403-01 | 2014Q4 | | Security |
05000368/FIN-2014005-04 | 2014Q4 | | Failure to Verify Ventilation Design for Vital Switchgear |
05000313/FIN-2014005-02 | 2014Q4 | | Failure to Provide Flow Protection For Auxiliary Feedwater Pump in Emergency Operating Procedures |