05000368/FIN-2014007-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Reassess the Effects of Aging |
Description | The team identified a non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for failure to follow procedures related to review of indications that could affect the structural integrity of the Unit 2 reactor building. Specifically, the licensee failed to perform a subsequent visual inspection of concrete cracks that exceeded acceptable criteria in the previous 5-year inspection as specified in Procedure CEP-CII-004, General and Detailed Visual Examinations of Concrete Containments, Revision 306. The corrective actions included verifying that the indications did not structurally affect the reactor building in these instances, initiating Condition Report C-2014-00597, and scheduling the affected areas for review during the upcoming 5-year inspection. The team determined that the failure to assess previous indications of concrete degradation, as specified in plant procedures, was a performance deficiency. The team considered the finding more than minor because, if left uncorrected, the finding would have the potential to lead to a more significant safety concern. Specifically, failure to track the growth of existing cracks on the reactor building could allow degradation to continue to the point of affecting the structural integrity. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 3, Barrier Integrity Screening Questions, the issue screened as having very low safety significance (Green) because it did not involve an actual open pathway in the physical integrity of the containment, loss of containment isolation, or reduction in heat removal capability and it did not affect hydrogen igniters. The team determined that this finding had a human performance cross cutting aspect in the area of work management. The licensee did not implement a process of planning, controlling, and executing work activities such that nuclear safety was the overriding priority. |
Site: | Arkansas Nuclear ![]() |
---|---|
Report | IR 05000368/2014007 Section 4OA5 |
Date counted | Mar 31, 2014 (2014Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | G Pick J Dixon M Williams S Graves S Makor |
Violation of: | 10 CFR 50 Appendix B Criterion V |
CCA | , |
INPO aspect | WP.1, WP.1 |
' | |
Finding - Arkansas Nuclear - IR 05000368/2014007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Arkansas Nuclear) @ 2014Q1
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||