LER-1980-032, Forwards LER 80-032/01T-0
Event date:
Report date:
2931980032R00 - NRC Website

text

__

()O CCUPAnf PILCRIM fJUCLEAR PCwcR SrATION RF*D #1 Rccxy HILL RcAo PLywouTH, MAssAcHuscTTs C236C September 22, 1980 BEco Ler #80-231 Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Consnission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 80-032/01.T-0 Docket Number 50-293 License DPR-35 Gentlemen:

The attached Licensee Event Report 80-032/01T-0, "Drywell Temperature", is hereby submitted in accordance with the requirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.1.

This report was not submitted earlier because it was believed that the original assumptions were invalid in that a saturated reference leg was used to determine setpoints instead of a sub-cooled reference leg. On Sept. 22, 1980 af ter discussions with resident NRC Inspectors a d Plant Support Group personnel it was learned that sub-cooled conditions were used in the calculations.

It there are any questions on this subject, please contact us.

Respectfully submitted, R. D. M hon Nuclear Operations Manager Pilgrim Station CJM:ep

Enclosures:

(3 copies)

LER 80-032/01T-0 cc:

Director (40 copies)

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 i

aosseeg g