05000293/LER-1979-050, Forwards LER 79-050/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 79-050/03L-0
ML19257B767
Person / Time
Site: Pilgrim
Issue date: 01/09/1980
From: Mcguire P
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19257B768 List:
References
80-5, NUDOCS 8001180293
Download: ML19257B767 (1)


LER-1979-050, Forwards LER 79-050/03L-0
Event date:
Report date:
2931979050R00 - NRC Website

text

.

O January 9, 1980 BECo Ltr #80 :

Director, Region 1 Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 79-050/03L Docket Number 50-293 License DPR-35 Gentlemen:

The attached Licensee Event Report 79-050/03L, Pailure of an HPCI Exhaust Line Snubber Strut Assembly, is hereby submitted in accordance with the requirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.

The Operations Review Committee has reviewed this event and classified it as operation in a degraded mde permitted by a Limiting Condition for Operation or requiring,nutdown (Specification 6.9.B.2.b).

If there are any questions on this subject, please contact us.

Respectfully submitted,

/7' E P.'

. McGuire S tation Manager Nuclear Operations ETG:ep

Enclosures:

(3 copies)

LER 79-050/03L cc:

Di"ctor (6' copies)

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 1770 293 2W S

  • ""a