| Q | CCA | Title |
---|
05000323/FIN-2018001-02 | 2018Q1 | | Failure to Follow Operating Experience Procedures Results in Inadequate Screen of Operating Experience Report |
05000323/FIN-2018001-01 | 2018Q1 | | Improper Troubleshooting Results in Reactor Trip Signal and Loss of Source Range Nuclear Instrument Power |
05000275/FIN-2018008-02 | 2018Q2 | | Failure to Identify Diesel Generator Air Inlet Boot Seal Critical Characteristics |
05000275/FIN-2018008-03 | 2018Q2 | H.14 | Failure to Promptly Identify and Correct Emergency Diesel Generator 1-1 Cardox System Inoperability |
05000275/FIN-2018008-01 | 2018Q2 | | Emergency Diesel Generator Mission Time for Operability Evaluations |
05000275/FIN-2018010-01 | 2018Q2 | | Failure to install conduit to environmentally qualified solenoid valves in a manner to prevent moisture intrusion and accumulation within the solenoid enclosure |
05000275/FIN-2018008-05 | 2018Q2 | | Minor Violation |
05000275/FIN-2018008-06 | 2018Q2 | | Minor Violation |
05000275/FIN-2018003-01 | 2018Q3 | P.2 | Multiple Examples of Scaffolding in Place Greater Than 90 Days Without Required Evaluation |
05000275/FIN-2018003-02 | 2018Q3 | H.1 | 4 kV Vital Switchgear Room Ventilation Degraded or Non-Conforming Condition and Associated Compensatory Measure Not Corrected in a Timely Manner |
05000275/FIN-2018404-01 | 2018Q3 | H.13 | Security |