05000311/FIN-2014002-07
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Inadequate Inspection of Isolated Phase Main Bus Duct Cooling Fan Sheave |
| Description | A self-revealing Green FIN was identified against PSEG procedure MA-AA-716-009, Use of Maintenance Procedures, Revision 5, when PSEG staff did not follow the rules of usage for Maintenance Department procedures as applied to work on a Unit 2 isolated phase bus cooling fan. Specifically, PSEG staff did not perform inspection and testing as required. Subsequently, the 2B fan belts broke causing high temperatures in the bus enclosure, control room alarms, and an unplanned reduction to 51 percent reactor thermal power. As interim corrective actions, PSEG entered this in their corrective action program (CAP), initiated a prompt investigation, installed fan belts and swapped operations to the 2A motor, and established weekly readings to monitor drive belt conditions. The issue was more than minor since it was associated with the Equipment Performance attribute of the Initiating Events cornerstone and adversely impacted its objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the failure of the drive belts resulted in an unplanned downpower. The finding was evaluated in accordance with IMC 0609, Attachment 4, and Appendix A where it screened as very low safety significance (Green) as a support system initiator. Specifically, the finding did contribute to the likelihood of, or cause, both an initiating event and affect mitigation equipment. The finding had a crosscutting aspect in the area of Human Performance, Teamwork, in that individuals and work groups communicate and coordinate their activities within and across organizational boundaries to ensure nuclear safety is maintained. Specifically, PSEG operations, maintenance, and engineering staff did not coordinate to ensure that inspections and testing were completed appropriately or that decisions not to complete steps as required were reviewed by the appropriate departments. |
| Site: | Salem |
|---|---|
| Report | IR 05000311/2014002 Section 4OA2 |
| Date counted | Mar 31, 2014 (2014Q1) |
| Type: | Finding: Green |
| cornerstone | Initiating Events |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | A Ziedonis E Burket G Dentel J Schoppy P Finney R Barkley R Nimitz |
| INPO aspect | |
| ' | |