MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-23
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000272/20223012022-04-27027 April 2022 Initial Operator Licensing Examination Report 05000272/2022301 and 05000311/2022301 IR 05000272/20203012020-09-16016 September 2020 Initial Operator Licensing Examination Report 05000272/2020301 and 05000311/2020301 IR 05000311/20193012019-02-14014 February 2019 Initial Operator Licensing Examination Report 05000272 and 05000311/2019301 IR 05000272/20183012018-03-22022 March 2018 Initial Operator Licensing Examination Report 05000272/2018301; 05000311/2018301 IR 05000272/20173012017-03-0707 March 2017 NRC Initial Operator Licensing Examination Report Er 05000272/2017-301; 05000311/2017-301 IR 05000272/20163012016-02-22022 February 2016 Er 05000272/2016301 and 05000311/2016301, 12/14-21/2015, Salem Nuclear Generating Station Units 1 and 2 Initial Operator Licensing Examination Report ML15342A4482015-12-0303 December 2015 Initial Operator Licensing Operating Test and Written Examination Approval - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20143012015-01-20020 January 2015 Er 05000272/2014301; 05000311/2014301; 12/08/2014 to 12/19/2014; Salem Nuclear Generating Station Units 1 and 2; Initial Operator Licensing Examination Report IR 05000272/20113012011-12-0202 December 2011 NRC Initial Operator Licensing Examination Report 05000272/2011301; 05000311/2011301 NTD-05-046, Response to NRC Form 536 (RIS 2005-19) Operator Licensing Examination Data2005-10-31031 October 2005 Response to NRC Form 536 (RIS 2005-19) Operator Licensing Examination Data ML0220000482002-07-10010 July 2002 Response to NRC Form 536 (RIS 2002-9) Operator Licensing Examination Data 2022-04-27
[Table view] |
Text
ary 20, 2015
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000272/2014301; 05000311/2014301
Dear Mr. Joyce:
On December 19, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Salem Nuclear Generating Station Units 1 and 2. The enclosed examination report documents the examination results, which were discussed on January 15, 2015, with Messrs. J Carney, and other members of your staff.
The examination included the evaluation of four applicants for reactor operator licenses and eight applicants for instant senior reactor operator licenses. The written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiners determined that all of the 12 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on January 15, 2015.
No findings were identified during this examination.
In accordance with Title 10 of Code of Federal Regulation (CFR), 10 CFR 2.390 of the NRC's
"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access Management System (ADAMS).
ADAMS is accessible from the NRC Web site http://www.nrc.gov/reading-rm/adams.html#web-based-adams (the Public Electronic Reading Room).
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-272; 50-311 License Nos.: DPR-70; DPR-75
ML15023A321 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME DSilk DJackson DATE 1/20/15 1/20/15
Enclosure:
Examination Report 05000272&311/2014301 w/Attachment: Supplementary Information
REGION I==
Dockets: 50-272, 50-311 Licenses: DPR-70, DPR-75 Report: 05000272/2014301; 05000311/2014301 Licensee: PSEG Nuclear LLC (PSEG)
Facility: Salem Nuclear Generating Station Units 1 and 2 Location: P.O. Box 236 Hancocks Bridge, NJ 08038 Dates: 12/8-15/2014 (Operating Test Administration)
12/17/2014 (Written Examination Administration)
12/24/2014 (Licensee Submitted Post Exam Package)
1/12/2015 (NRC Examination Grading)
1/15/2015 (Licenses Issued)
Examiners: D. Silk, Chief Examiner, Operations Branch P. Presby, Senior Operations Engineer B. Fuller, Senior Operations Engineer T. Hedigan, Operations Engineer N. Graneto, Operations Engineer (Observer)
Approved By: Donald E. Jackson, Chief Operations Branch Division of Reactor Safety i Enclosure
SUMMARY
ER 05000272/2014301; 05000311/2014301; 12/08/2014 - 12/19/2014; Salem Nuclear
Generating Station Units 1 and 2; Initial Operator Licensing Examination Report.
Four NRC examiners evaluated the competency of four applicants for reactor operator licenses and eight applicants for instant senior reactor operator licenses at Salem Nuclear Generating Station Units 1 and 2. The facility licensee developed the examinations using NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
The written examination was administered by the facility on December 19, 2014. NRC examiners administered the operating tests on December 8-15, 2014. The NRC examiners determined that all of the 12 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
No findings were identified.
ii
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
The examiners reviewed all 12 license applications, and additional information, submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. This review focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee.
b. Findings
No findings were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
On December 19, 2014, the licensee proctored the administration of the written examinations to all 12 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on December 24, 2014.
The NRC examination team administered the various portions of the operating examination to all 12 applicants on December 8-15, 2014. The four applicants for reactor operator licenses participated in three dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of 11 system tasks, and an administrative test consisting of four administrative tasks. The eight applicants seeking an instant senior reactor operator license participated in three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of 10 system tasks, and an administrative test consisting of five administrative tasks.
b. Findings
All 12 of the applicants passed all parts of the operating test and the written examination. For the written examinations, the reactor operator applicants average score was 93.24 percent and ranged from 89.19 to 95.94 percent, the senior operator applicants average score was 88.00 percent and ranged from 80.61 to 96.93 percent.
The overall written examination average was 89.75 percent. The NRC examiners completed the final grading of the written examination on January 12, 2015, and conducted a review of each missed question to determine the accuracy and validity of the examination questions. The text of the examination questions, the licensees examination analysis, and the licensees post-examination comments may be accessed in the Agencywide Documents Access System (ADAMS) system under the accession numbers noted in the attachment. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for 2 years.
Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis for questions that were missed by 30 percent or more of the applicants. Eighteen questions met these criteria and the licensee submitted the analysis to the chief examiner. This analysis concluded that one of the questions (RO#61) indicated that a clarifying note should be added to the applicable lesson plan.
The licensee submitted three post-examination question comments, and the associated technical references, on December 24, 2014, and can be found in ADAMS under ML15009A252. The NRC reviewed the facilitys post-exam comment submittal package and accepted the facility recommendations based upon the technical merits of the comments. Details regarding the NRCs resolution of the facility recommendations are contained in ADAMS under ML15020A701. The NRC concluded that RO #61 and SRO
- 8 will be deleted from the examination and SRO#6 will accept Choices c. and d. as correct responses.
.3 Initial Licensing Examination Development
a. Examination Scope
The facility licensee developed the examinations in accordance with NUREG-1021, Revision 9, Supplement 1. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The facility licensee submitted both the written and operating examination outlines on September 19, 2014. The chief examiner reviewed the outlines against the requirements of NUREG-1021, and provided comments to the licensee. The facility licensee submitted the draft examination package on October 22, 2014. The chief examiner reviewed the draft examination package against the requirements of NUREG-1021, and provided comments to the licensee on the examination during the week of November 3, 2014. The NRC conducted an onsite validation of the operating examinations and provided further comments during the week of November 10, 2014.
The licensee satisfactorily completed comment resolution on November 24, 2014.
b. Findings
The NRC approved the initial examination outline and advised the licensee to proceed with the operating examination development.
The examiners determined that the written and operating examinations initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
No findings were identified.
.4 Simulation Facility Performance
a. Examination Scope
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Examination Scope
The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG-1021 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the examination results to Mr. J. Carney, Training Manager, and other members of the licensee's management staff on January 15, 2015.
The licensee acknowledged the findings presented.
The licensee did not identify any information or materials used during the examination as proprietary.
s:
1. Supplementary Information
SUPPLEMENTARY INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- J. Carney, Operations Training Manager
- G. Gauding, Simulator Support-Section Leader
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
NONE
Opened and Closed
NONE
Closed
NONE
Discussed
NONE
ADAMS DOCUMENTS REFERENCED