Finding | |
---|---|
Title | Failure to Maintain Procedures to Ensure Design Requirements Would Be Met During Construction of the External Flooding Protection Levee |
Description | The inspectors identified a finding of very low safety significance with an associated NCV of Technical Specification 5.4.1.a for the licensees failure to maintain adequate procedures to protect the plant from external flooding events. Specifically, the licensee failed to maintain Procedure 830002, External Flooding Protection Implementation to Support A.6 Acts of Nature, in that it lacked sufficient instructions to ensure testing of materials necessary to its external flooding mitigation plan were adequately controlled. The licensee entered this violation into its corrective action program (CAP) to evaluate changes to its procedures to correct the problem. The finding was of more than minor significance because it was associated with the Protection Against External Factors and Procedure Quality attributes and adversely affected the Mitigating Systems Cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the instructions for constructing the flood control levee lacked specific details on how the licensee would ensure it was constructed, compacted, and tested to at least 90 percent compaction. The finding was a licensee performance deficiency of very low safety significance because it did not involve a loss or degradation of equipment or function specifically designed to mitigate a seismic, flooding, or severe weather initiating event (e.g., seismic snubbers, flooding barriers, tornado doors). This determination was based on reasonable assurance the licensee could construct and compact the levee to at least 90 percent compaction. The inspectors determined this finding affected the cross-cutting area of human performance and the work management aspect due to the licensees failure to implement a process of planning, controlling, and executing work activities such that safety is the overriding priority. Specifically, the licensees process for developing and validating the work instructions for construction of the levee did not ensure appropriate quality control steps were incorporated for critical design attributes. |
Site: | Monticello ![]() |
---|---|
Report | IR 05000263/2014009 Section 4OA4 |
Date counted | Dec 31, 2014 (2014Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 95002 |
Inspectors (proximate) | B Kemker G Hansen J Corujo-Sandin J Rutkowski K Riemer M Ziolkowski P Voss R Edwards P Chaput W Wang |
Violation of: | Technical Specification Technical Specification - Procedures |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |