| Q | CCA | Title |
---|
05000263/FIN-2013406-01 | 2013Q3 | | Security |
05000263/FIN-2013405-01 | 2013Q3 | H.8 | Security |
05000263/FIN-2013004-01 | 2013Q3 | H.7 | Recirculation System Vulnerabilities Due to Inadequate Modification Review |
05000263/FIN-2013004-02 | 2013Q3 | H.7 | Failure to Maintain the ODCM |
05000263/FIN-2013004-03 | 2013Q3 | H.14 | Loss of Accurate Level Indication During Partial RCS Drain Down |
05000263/FIN-2013004-04 | 2013Q3 | H.7 | Inappropriate Emergency Shutdown of Both EDGs During a LONOP Event |
05000263/FIN-2013004-05 | 2013Q3 | | Inappropriate Invoking of Surveillance Requirement 3.0.3 Due to Missed In-service Te |
05000263/FIN-2013007-04 | 2013Q4 | | EDG Fuel Oil Supply System Design does Not Meet the Single Failure Criteria |
05000263/FIN-2013007-03 | 2013Q4 | H.13 | Failure to Maintain Qualification of UV Relay 27-43A |
05000263/FIN-2013007-02 | 2013Q4 | H.12 | Failure to Ensure Required Design Basis Analysis was Maintained |
05000263/FIN-2013007-01 | 2013Q4 | H.7 | Failure to Evaluate the Effects of the HPCI Steam Isolation Outboard Valve Closure Time Increase |
05000263/FIN-2013005-03 | 2013Q4 | H.5 | Failure to Maintain Radiation Exposure ALARA During RFO 26 |
05000263/FIN-2013005-02 | 2013Q4 | H.12 | SBLC Discharge Pressure Procedural Limits Exceed |
05000263/FIN-2013005-01 | 2013Q4 | H.2 | Failure to Follow Procedure for AO 13-22 Furmanite Injection |
05000263/FIN-2014002-07 | 2014Q1 | | Both Secondary Containment Access Doors Briefly Opened Simultaneously |
05000263/FIN-2014404-01 | 2014Q1 | | Security |
05000263/FIN-2014008-03 | 2014Q1 | H.12 | Repairs Credited for Hot Shutdown Conditions |
05000263/FIN-2014008-02 | 2014Q1 | | Both Redundant Safe Shutdown Trains of Nitrogen Bottles were Found Located In the Same Fire Area |
05000263/FIN-2014008-01 | 2014Q1 | P.2 | Shorting Switch Modification Failed to ensure Drywell Spray Valves would not Spuriously Open |
05000263/FIN-2014002-06 | 2014Q1 | | Uncontrolled High Radiation Area Following Shut-down Cooling Re-Alignment |
05000263/FIN-2014002-05 | 2014Q1 | H.14 | Inadequate Drywell-Torus Monthly Vacuum Breaker Test Procedure due to Proceduralized Unacceptable Preconditioning |
05000263/FIN-2014002-04 | 2014Q1 | H.14 | Failure to Follow Procedure for Drywell-Torus Vacuum Breaker Operability Determination |
05000263/FIN-2014002-03 | 2014Q1 | | Drywell-Torus Vacuum Breaker Inadequate Post-maintenance and Return-to-service Test |
05000263/FIN-2014002-02 | 2014Q1 | H.14 | Failure to Follow Procedure for RCS Operability Determination |
05000263/FIN-2014002-01 | 2014Q1 | P.3 | RCS Pressure Boundary Leakage Operation Prohibited by Technical Specifications |