| Q | CCA | Title |
---|
05000263/FIN-2014002-01 | 2014Q1 | P.3 | RCS Pressure Boundary Leakage Operation Prohibited by Technical Specifications |
05000263/FIN-2014002-07 | 2014Q1 | | Both Secondary Containment Access Doors Briefly Opened Simultaneously |
05000263/FIN-2014008-03 | 2014Q1 | H.12 | Repairs Credited for Hot Shutdown Conditions |
05000263/FIN-2014008-02 | 2014Q1 | | Both Redundant Safe Shutdown Trains of Nitrogen Bottles were Found Located In the Same Fire Area |
05000263/FIN-2014008-01 | 2014Q1 | P.2 | Shorting Switch Modification Failed to ensure Drywell Spray Valves would not Spuriously Open |
05000263/FIN-2014404-01 | 2014Q1 | | Security |
05000263/FIN-2014002-06 | 2014Q1 | | Uncontrolled High Radiation Area Following Shut-down Cooling Re-Alignment |
05000263/FIN-2014002-05 | 2014Q1 | H.14 | Inadequate Drywell-Torus Monthly Vacuum Breaker Test Procedure due to Proceduralized Unacceptable Preconditioning |
05000263/FIN-2014002-04 | 2014Q1 | H.14 | Failure to Follow Procedure for Drywell-Torus Vacuum Breaker Operability Determination |
05000263/FIN-2014002-03 | 2014Q1 | | Drywell-Torus Vacuum Breaker Inadequate Post-maintenance and Return-to-service Test |
05000263/FIN-2014002-02 | 2014Q1 | H.14 | Failure to Follow Procedure for RCS Operability Determination |
05000263/FIN-2014003-02 | 2014Q2 | | Operation Outside of Reactor Coolant System Pressure and Temperature Limits |
05000263/FIN-2014003-01 | 2014Q2 | H.3 | Inadequate Standby Liquid Control Quarterly Pump and Valve Test Due to Proceduralized Unacceptable Preconditioning |
05000263/FIN-2014405-01 | 2014Q3 | H.11 | Security |
05000263/FIN-2014405-02 | 2014Q3 | H.13 | Security |
05000263/FIN-2014403-01 | 2014Q3 | | Security |
05000263/FIN-2014403-02 | 2014Q3 | | Security |
05000263/FIN-2014004-01 | 2014Q3 | H.7 | Failure to Follow Reactivity Management Procedure |
05000263/FIN-2014009-05 | 2014Q4 | | Failure to Update the USAR for a Change to the Mitigation Strategy for the Design Basis External Flooding Event |
05000263/FIN-2014009-06 | 2014Q4 | | Failure to Perform a Written Safety Evaluation |
05000263/FIN-2014005-02 | 2014Q4 | | Incorrect Emergency Action Level Threshold |
05000263/FIN-2014009-02 | 2014Q4 | | Failure to Satisfy 10 CFR 50.72 and 10 CFR 50.73 Reporting Requirements for an Unanalyzed Condition |
05000263/FIN-2014009-01 | 2014Q4 | | Failure to Satisfy 10 CFR 50.73 Reporting Requirements for an Unanalyzed Condition |
05000263/FIN-2014005-01 | 2014Q4 | H.13 | Failure to Comply with ASME Code and Maintain Configuration Approved by IST Relief Request |
05000263/FIN-2014009-04 | 2014Q4 | H.3 | Safety/Security Interface Assessment Failure |
05000263/FIN-2014009-03 | 2014Q4 | H.5 | Failure to Maintain Procedures to Ensure Design Requirements Would Be Met During Construction of the External Flooding Protection Levee |
05000263/FIN-2014406-01 | 2014Q4 | | Security |