05000247/FIN-2011002-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Entergy Personnel Did Not Identify a Leak on the 25 Service Water Pump Piping |
Description | The inspectors identified a Green NCV of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, because Entergy personnel did not promptly identify and correct an adverse condition related to a service water (SW) pipe leak. Specifically, on October 29, 2010, NRC inspectors identified a leak on the base weld of the 25 SW pipe vacuum breaker which required subsequent evaluation and repair by Entergy personnel to restore operability of the 25 service water pump (SWP). This issue was entered into Entergys CAP as CR IP2-2010-6620. This finding is more than minor because it is associated with the equipment performance attribute of the Mitigating Systems cornerstone and affects the cornerstone objective of ensuring the reliability and capability of systems that respond to initiating events to prevent undesirable consequences (i.e. core damage). Specifically, the 25 SW pipe weld leak challenged the capability and the reliability of the SWP, and the pump was declared inoperable by Entergy personnel to conduct repairs. Using IMC 0609.04, Phase 1 - Initial Screening and Characterization of Findings, the finding was determined to have very low safety significance (Green) because the finding was not related to a design or qualification deficiency, did not represent a loss of system safety function, and the finding did not screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The finding has a cross-cutting aspect in the area of problem identification and resolution associated with the CAP attribute because Entergy personnel did not implement a CAP with a low threshold for identifying issues, specifically, identifying a leak on the 25 SWP piping. |
Site: | Indian Point ![]() |
---|---|
Report | IR 05000247/2011002 Section 1R19 |
Date counted | Mar 31, 2011 (2011Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.19 |
Inspectors (proximate) | A Rao J Noggle J Richmond M Catts M Gray O Ayegbusi |
CCA | P.1, Identification |
INPO aspect | PI.1 |
' | |
Finding - Indian Point - IR 05000247/2011002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Indian Point) @ 2011Q1
Self-Identified List (Indian Point)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||