|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21117A0722021-04-27027 April 2021 Meeting Slides for April 28, 2021 Meeting with TVA ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML20345A0262020-12-10010 December 2020 Replacement Steam Generator Project Planned License Amendment Request (Lars). LAR Descriptions and Submittal Schedule Meeting Slides ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML20302A1232020-10-28028 October 2020 Pre-Submittal Meeting Slides Non-Voluntary Application to Modify WBN Unit 1 and Unit 2 TS Surveillance Requirement 3.6.15.4, Shield Building ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19298A0042019-09-12012 September 2019 Presentation Slides for 9/12/19 Public Meeting ML19252A0532019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources ML19235A2882019-08-23023 August 2019 2019 WBN SCWE Public Meeting Slides 8-27-2019 (NRC Slides) ML19235A2712019-08-23023 August 2019 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) ML19178A2462019-07-0101 July 2019 Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 ML19161A2412019-06-11011 June 2019 Pre-Application Meeting for Proposed License Amendment Request (LAR) Regarding Change to the WBN Unit 2 Technical Specifications (TS) 3.4.17, Steam Generator Tube Integrity and 5.7.2.12 Steam Generator Program ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19142A3602019-05-21021 May 2019 May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant ML19018A0072019-01-18018 January 2019 (WBN)Pre-Submittal Meeting for Proposed License Amendment Request Regarding a One-Time Change for the WBN Unit 2 Technical Specification (TS) 3.7.8, Essential Raw Cooling Water (ERCW) System. ML18291A5732018-10-18018 October 2018 Chilled Work Environment ML18291A5632018-10-18018 October 2018 Chilled Worked Environment Update ML18248A1052018-09-0505 September 2018 Presentation Slides - Watts Bar Nuclear Plant Units 1 and 2 Adoption of TSTF-425 Initiative 5b - Surveillance Frequency Control Program - September 6, 2018 ML18248A1022018-09-0505 September 2018 Presentation Slides - Watts Bar Nuclear Plant (WBN) Pre-Submittal Meeting for Proposed License Amendment Request Regarding Shutdown Board Cleaning - September 6, 2018 ML18248A1012018-09-0505 September 2018 Bar Nuclear Plant (WBN) Pre-Submittal Meeting for Proposed License Amendment Adoption of TSTF-500 ML18248A1072018-09-0505 September 2018 Presentation Slides - Watts Bar Nuclear Plant Units 1 and 2 Adoption of 10 CFR 50.69 - September 6, 2018 ML18164A3192018-06-18018 June 2018 Presentation Material for 6/19/18 Pre-submittal Meeting ML18024A7932018-01-25025 January 2018 Presentation Slides - Watts Bar Nuclear Plant Unit 2 Pre-Submittal Meeting for Proposed License Amendment Request Regarding the Use of PAD4TCD in the Large Break Loss of Coolant Accident Analysis 2023-09-27
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23010A2542023-01-12012 January 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension -- Meeting Slides ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 and Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22035A0002022-02-0404 February 2022 February 8, 2022, Pre-Submittal Meeting Slides Regarding Proposed Change to Modify the Allowable Value for Technical Specification Table 3.3.2-1, Function 6.e(1) ML22013A6432022-01-19019 January 2022 TVA Slides - Watts Bar Nuclear Plant (WBN) Schedule for the Development of a License Amendment Request (LAR) for Increased Tritium Production at WBN ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21096A1002021-04-0606 April 2021 Annual Assessments ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML21019A5692021-01-19019 January 2021 Pre-Submittal Teleconference for Proposed License Amendment Requests (Lars) for the WBN Unit 2 Replacement Steam Generator (RSG) Project ML20352A0362020-12-17017 December 2020 Pre-Submittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analysis Report (UFSAR) to Use an Alternate Probability of Detection (POD) ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML21050A1562020-10-21021 October 2020 Graizer - Presentation - Analysis of Tva'S Watts Bar Nuclear Power Plant Strong-Motion Records of the M 4.4 December 12, 2018 Decatur Tennessee Earthquake ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20220A2022020-08-0707 August 2020 Pre-Submittal Meeting Slides - Proposed License Approach Regarding a Change for Watts Bar Nuclear Plant Units 1 & 2 Technical Specification 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps(Epid L-2 ML20209A0702020-07-27027 July 2020 Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B Meeting Slides ML20169A5222020-06-25025 June 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals and TSTF-510 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20148M1452020-05-27027 May 2020 (Wbn)Proposed License Approach Regarding a Change for the WBN Units 1& 2 Technical Specification (TS) 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps ML20147A0132020-05-26026 May 2020 NRC Slides Final WBN-1 TS 3.3.3 LAR ML20134J0102020-05-14014 May 2020 Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values ML19298A0042019-09-12012 September 2019 Presentation Slides for 9/12/19 Public Meeting ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19252A0532019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources ML19252A0522019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant (WBN) Application to Modify WBN Unit 1 and Unit 2 Technical Specification (TS) 3.6.15, Shield Building - September 11, 2019 ML19235A2712019-08-23023 August 2019 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) ML19197A0932019-07-16016 July 2019 Presentation Slides - Watts Bar Nuclear Plant (WBN) Unit 2, Pre-Submittal Meeting for License Amendment Request Measurement Uncertainty Recapture (Mur) Power Update ML19178A2462019-07-0101 July 2019 Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 2023-09-27
[Table view] |
Text
Hydrology License Amendment Requests Watts Bar Nuclear Plant October 22, 2014 1
Hydrologic Calculation Flow Chart 2
Hydrologic Calculation Flow Chart 3
Tennessee River SystemWattsBarWatts Bar Nuclear Plant Chattanooga Knoxville Wilson DamLargeandcomplexriversystem 4Large and complex river system Tennessee River System Overview Thorpe(N)Watauga South Holston Boone Ft. Patrick HenryClinch River Holston River French Broad RiverLittle Tennessee Bristol Projects (2)
NolichuckyNorris Melton Hill Cherokee DouglasFontanaNantahala (N)Thorpe (N)Santeetlah (T)ChatugeTellicoChilhowee(T)Calderwood (T)Cheoah(T)Watauga Wilbur HenryWttBFt. Loudoun Hiwassee River John SevierDoakes CreekWattsBarPlantTims Ford Raccoon Mountain Nottel yHiwassee Apalachia Blue RidgeOcoee 1, 2, 3Guntersville Nickajack Chickamauga W a tt s B a rDkRi Elk RiverWatts Bar PlantSequoyah PlantBrowns Ferry Plant NormandyTennessee-Tombigbee Waterway Wilson Wheeler Green RiverCumberland River D uc k Ri verBear Creek Projects (4)Pickwick KentuckyBarkley (C)Ohio River Note:(C) U.S. Army Corps of Engineers Dams(N)NantahalaPower & Light Company (subsidiary of Duke Energy)Beech River Projects (8) 5Mississippi River(T) Brookfield Smokey Mountain Hydro Power (Formerly Tapoco)
Main Stem Profile 813 813 741 682.5 634.5 595 556 507.7 414 359Summer Pool Elevations NOT TO SCALE 300 6 Historical Timeline of PMF1982 -1997TVA Dam Safety Modification Program Feb/March 2008 Bellefonte NOV & Hydrology model reconstitution project started September 2014Watts Bar LAR supplement1999 & 2001Watts Bar & Sequoyah UFSAR change reflect PMF reevaluation, respectivelyJuly & Aug 2012 WBN & SQN LAR submittal, respectively respectively 1997-1998 PMF r e-e v a l uated Dec 2009 HESCO 1979 & 1982 Sequoyah & Watts BarHydrologyAnalysis eeauated for TVA Dam Safety Mods barriers installed 2004TVA Reservoir 2013-2014 Dam Stabilit y Re p orts 7 Hydrology Analysis approved by NRC, respectively Operation Study completed yp Model Results WBN (Feet)()Original Licensing PMF Elevation738.11998 Calculation PMFElevation734.92012 LAR PMF Elevation739.2 2014 LAR HEC-RAS PMF Elevation738.92014 LAR Pro p osed Desi gnBasis PMF Elevation739.2 pg 8 Hydrologic Calculation Flow Chart 9
PMP Isohyets for 21,400 Square-Mile Event (Downstream Placement
)()10 PMP Isohyets for 7,980 Square-Mile Event Centered at Bulls Ga p, TN p, 11 Seasonal Variations of Rainfall (PMP)Anteceden t(in inches)Three-Day PMP(in inches)7,980-sq.mi.21,400-sq.mi.Dry IntervalbeforePMP7,980-sq.mi.21,400-sq.mi.MonthBasinBasinbefore PMP(days)BasinBasinMarch5.976.18317.0516.18April5.925.92316.9115.51May5.845.63316.6914.74June5.735.19316.3513.59July4.203.572-1/215.9812.46August4.203.622-1/215.9812.63 September4.464.122-1/217.0014.40 12Sources: March - Appendix G, CDQ000020080053Other values calculated using ratios in HMR-41 Table 7-7 Rainfall/Runoff Relationship DevelopmentUnchangedfrom2012LARRainfall-runoff relationships contained in the API method weredevelopedbytheUSWeatherBureau(USWB)inUnchanged from 2012 LAR were developed by the U.S. Weather Bureau (USWB) in the 1950s using procedures outlined in Kohler and Linsley'sUSWB Research Paper No. 34, Predicting the Runoff from Storm Rainfall, 1951.Therelationshipsweredevelopedfromstormandflood The relationships were developed from storm and flood records which relate precipitation excess to:-Basin rainfall-The week of the year-Location -API region Adiiiid(API) 13-A ntece d ent prec i p i tat i on i n d ex (API)
API BackgroundUnchangedfrom2012LARThe Antecedent Precipitation Index (API) method is currentlyusedbyTVARiverOperationsinforecastingUnchanged from 2012 LAR currently used by TVA River Operations in forecasting and was used by TVA in previous analyses of the TennesseeRiversystemfortheTVANuclearPower Tennessee River system for the TVA Nuclear Power Group.The API method is currentl y used b y TVA River yyOperations to accomplish their federally mandated, integrated operation of the TVA reservoir system which includes flood control responsibilitiesIn CDQ000020080052, the API method was ddddhd 14 compare d to two in d ustry stan d ar d met h o d s.
Computed API Prior to Main Storm 12The API for any day is equal to that of the previous day multiplied by 0.9, plus
an y rain on that da y 10 h esComputed API prior to main storm, 3.65 inches y yAdopted API prior to antecedent storm, varies API to demonstrate sensitivity 6 8 or API in Inc hComputed APIs are same atthis point; runoff in main storm not sensitive to ado p ted initial 4 ecipitation o pmoisture conditions beginningof storm 2 Pr e3-daydry periodmain stormantecedent storm 151234567891011Days LossMethod Comparisons 16 LossMethod Comparisons 17 SRO Hydrograph DevelopmentUnchangedfrom2012LARTVA FLDHYDRO computer code was used to develop surfacerunoff(SRO)hydrographsforallbasinsUnchanged from 2012 LAR surface runoff (SRO) hydrographs for all basinsCode used verified unit hydrographs, distributed rainfall, initial API and API region as inputsFLDHYDROoutputimportedtoExcelforprocessing FLDHYDRO output imported to Excel for processingBaseflowand initial soil moisture conditions were developed from long term TVA gage data 18 Inflow Hydrograph Routing 19 Hydrologic Calculation Flow Chart 20 Geometry DataOriginal cross sections were extracted from previous models and verifiedwithnewdataSeveraldatasourceswereusedto verified with new data. Several data sources were used to develop new profiles of the river channels. These include:Reservoir Reservoir-DTM/DEM Data-Corps of Engineers Bathymetric Survey bTri b utaries-DTM/DEM Data-Tennessee River Surve y (TRS) Ma p sy()p-USGS TopoMaps
-TVA Field SurveysFEMAModels 21-FEMA Models Geometry Data 22 HEC-RAS Steady-State Calibration -
1973 Flood Hi gh Water Marks615625HEC-RAS g595 605 L1973 Flood Profile575585Feet above MS L1973 High-Water Marks555565Elevation in River Bottom535 545River Bottom ElevationSteady-state model calibrated to observed high water marks 23525340350360370380390400410420430440450Tennessee River Mile HEC-RAS Unsteady-State CalibrationThis process calibrates reaches not influenced by RiOifh D 24 Reservo i r Operat i ons o f t h e D am HEC-RAS Unsteady-State CalibrationMinor differences in headwater elevation iDihdbd 25 us i ng Di sc harge as downstream b oun d ary Dam Rating CurvesUnchangedfrom2012LARChanges from FSAR to 2012 LARddiiUnchanged from 2012 LARRe d uce d max i mum open i ngsOrifice discharge coefficientsSubmergence effects
-referencedataforspillwayfreeflowused reference data for spillway free flow used-model data for orifice flow availableHESCO ConcertainersTurbine dischargeRimLeaks 26 Rim Leaks Watts Bar Rim LeaksUnchangedfrom2012LARUnchanged from 2012 LAR 27 Dam Rating CurvesChanges from 2012 LAR to 2014 LARCases added as a result of dam stability calculationsCasesaddedtoreflectpermanentdammodifications Cases added to reflect permanent dam modificationsNot all cases were used to support 2014 LAR 28 Flood Operational GuidesUnchangedfrom2012LARCapture reasonable dam operationsUnchanged from 2012 LARSimulate those operations in our modelRidfRiShdli(RS)R ev iew an d concurrence f rom Ri ver S c h e d u li ng (R v S) of the model dam simulation 29 Flood Operational Guide Curve to DRCUnchangedfrom2012LAR 780Combined Operating Guide and DRCtosimulatehowthedamUnchanged from 2012 LAR 760 770DRC to simulate how the dam operates during flood events 750 ter Elevation (ft)Gates Fully Open 740Headwa tTop of Gates Recover y Recovery Mode 730 Recovery Mode Base
Point y Mode ElbowDRC Curve-Spillway 30 7200100200300400500600700800900100011001200Discharge (1000 cfs
)
Unsteady Flow Rules*Water surface elevations at appropriate headwater/tailwatersectionsareextractedatthe headwater/tailwater sections are extracted at the beginning of each computational time stepItlbdflthtti
- I n t erna l b oun d ary average fl ows over th e nex t ti me step are computed as a function of these elevations asprescribedintheFOG&DRCcalculations as prescribed in the FOG & DRC calculations 31 Unsteady Flow Rules Checking Tool 32 Model Setup*Combine the calibrated reservoirs into a composite HECRASmodel HEC-RAS model*Use of Inline/Lateral structures to connect each reservoir*Geometrymodificationsnecessaryforthecomposite
- Geometry modifications necessary for the composite model are noted in the calculation 33 AssumptionsAssumptionFSAR2012 LAR2014 LARChickamaugaLock ConfigurationCurrent LockCurrent LockCurrent Lock Dallas Bay/Lick Branch/North
Chickamauga CrModeledas a rating curve at
Chickamauga
DamIncluded in the unsteady SOCH
modelIncluded in the unsteady HEC-RAS modelWtSddlDFilTtlFilTtlFilTtlFil(Ldt752ft)W es t S a ddl e D am F a il ure T o t a l F a il ure T o t a l F a il ure T o t a l F a il ure (L owere d t o 752 f ee t)West Saddle Dam RoutingModeledas a rating curve at Watts Bar DamDischargeseparated as a local in Yellow
CreekDischargeseparated as a local in Yellow Creek Correction for
Submergence The average tailwater rating curve used for
each event Correction for submergence was
performed for each
event Correction for submergence was performed for each eventDam ModificationsNot included HESCO Concertainers IncludedOperationalAllowancesNot includedEvaluatedfor each simulationEvaluatedfor each simulation 34Rim Leaks at Fort Loudoun, Watts Bar, and
NickajackNot includedIncludedIncluded AssumptionsAssumptionFSAR2012 LAR2014 LARMelton Hill ReservoirLevel pool routingUnsteady SOCH modelUnsteady HEC-RAS model Hiwassee River (mouth to HRM 18.9)Lag routedUnsteady SOCH modelUnsteady HEC-RAS modelMain Stem UnsteadyFlow ModelSOCHSOCHHEC-RASTributaryUnsteady Flow ModelTRBROUTETRBROUTEHEC-RASTurbineDischargeEvaluated for main river damsEvaluatedfor all dams with turbinesEvaluatedfor all dams with turbinesOperationalDeck/Gate
operability Not consideredIf operating deck was overtopped then the gates are assumed to
be inoperable on the If operating deck was overtopped then the gates are assumed to be inoperable on the recession siderecession sideDownstream Dams No failures assumedNo failures assumedNo failures assumed Loss Method A PI A PI A PI 35Norris Subbasins411Melton Hill Subbasins1011 Hydrologic Calculation Flow Chart 36