Start date | Site | Title | |
---|---|---|---|
05000458/FIN-2018002-02 | 30 June 2018 23:59:59 | River Bend | Enforcement Action (EA)-18-053: Enforcement Discretion for Tornado-Generated Missile Protection Noncompliances |
05000275/FIN-2018008-01 | 30 June 2018 23:59:59 | Diablo Canyon | Emergency Diesel Generator Mission Time for Operability Evaluations |
05000219/FIN-2018001-02 | 31 March 2018 23:59:59 | Oyster Creek | Enforcement Action (EA)-18-007: No. 2 Emergency Diesel Generator Ring Lug Failure |
05000416/FIN-2017007-05 | 31 December 2017 23:59:59 | Grand Gulf | Failure to Update a Calculation and Procedure to Address Standby Service Water Passive Failure |
05000298/FIN-2017001-03 | 31 March 2017 23:59:59 | Cooper | Failure to Identify a Condition Adverse to Quality |
05000368/FIN-2016011-01 | 31 December 2016 23:59:59 | Arkansas Nuclear | Failure to Ensure Adequate Lubication for Emergency Diesel Generator Bearing |
05000400/FIN-2016003-01 | 30 September 2016 23:59:59 | Harris | Subsequent Loss of Safety-Related Chilled Water System Results in a Loss of Safety Function |
05000269/FIN-2016003-01 | 30 September 2016 23:59:59 | Oconee | Failure to Translate Design Requirements to Prevent the Effects of Waterhammer |
05000333/FIN-2016007-01 | 30 June 2016 23:59:59 | FitzPatrick | Failure to ensure design basis of EDG LO storage facility |
05000280/FIN-2016001-01 | 31 March 2016 23:59:59 | Surry | Failure to Perform a 10 CFR 50.59 Evaluation for Blocking Ventilation to Main Steam Valve Houses |
05000315/FIN-2016001-01 | 31 March 2016 23:59:59 | Cook | Incorrect Auxiliary Feedwater Mission Time |
05000354/FIN-2016001-01 | 31 March 2016 23:59:59 | Hope Creek | Untimely correction of a Condition Adverse to Quality Associated with High Vibrations on the C Emergency Diesel Generator |
05000255/FIN-2015004-05 | 31 December 2015 23:59:59 | Palisades | Licensee-Identified Violation |
05000336/FIN-2015004-01 | 31 December 2015 23:59:59 | Millstone | Charging Packing Lubrication Pump Inadequate Operating Procedure Acceptance Criteria |
05000277/FIN-2015004-01 | 31 December 2015 23:59:59 | Peach Bottom | Failure to Ensure Design Basis of Emergency Diesel Generator Lubrication System |
05000445/FIN-2015008-04 | 30 September 2015 23:59:59 | Comanche Peak | Failure to Maintain Adequate Controls for Design Calculations |
05000445/FIN-2015007-02 | 30 September 2015 23:59:59 | Comanche Peak | Failure to Validate Inverter Output Demand Factor and to use the Correct Value of Inverter Efficiency when Determining Inverter Input D-C Power Requirements |
05000315/FIN-2015003-07 | 30 September 2015 23:59:59 | Cook | Licensee-Identified Violation |
05000456/FIN-2015003-02 | 30 September 2015 23:59:59 | Braidwood | Licensee-Identified Violation |
05000454/FIN-2015007-01 | 30 September 2015 23:59:59 | Byron | Failure to Evaluate the Impact of a FLEX-Related Configuration Change on Available DG Fuel Oil Margin |
05000338/FIN-2015003-01 | 30 September 2015 23:59:59 | North Anna | Licensee-Identified Violation |
05000266/FIN-2015003-04 | 30 September 2015 23:59:59 | Point Beach | Licensee-Identified Violation |
05000454/FIN-2015007-02 | 30 September 2015 23:59:59 | Byron | Failure to Evaluate Operability and Reportability in Accordance with the Issue Report Screening Procedure |
05000324/FIN-2015002-04 | 30 June 2015 23:59:59 | Brunswick | 2C Residual Heat Removal Service Water (RHRSW) Pump Oil Leak |
05000336/FIN-2015007-02 | 30 June 2015 23:59:59 | Millstone | Failure to Provide 10 CFR 50.59 Evaluation for Interim Action Associated with Implementation of Operability Determination Procedure |
05000237/FIN-2015007-02 | 30 June 2015 23:59:59 | Dresden | EDG Usable Fuel Calculations Failed to Consider Appropriate EDG Frequency Variations |
05000338/FIN-2015002-01 | 30 June 2015 23:59:59 | North Anna | Failure To Maintain An Adequate Maintenance Procedure For The Turbine Driven Auxiliary Feedwater Pump |
05000528/FIN-2015002-01 | 30 June 2015 23:59:59 | Palo Verde | Failure to Verify the Design of the Essential Spray Pond System Crosstie Valves |
05000293/FIN-2015002-02 | 30 June 2015 23:59:59 | Pilgrim | Inadequate Operability Determination for the B EDG Results in TS Violation |
05000336/FIN-2015007-01 | 30 June 2015 23:59:59 | Millstone | Reactor Building Closed Cooling Water System Pump Oil Leakage Results in Technical Specification Inoperability |
05000458/FIN-2015001-01 | 31 March 2015 23:59:59 | River Bend | Failure to Perform Adequate Operability Evaluations on Degraded High Pressure Core Spray System |
05000483/FIN-2014008-03 | 30 September 2014 23:59:59 | Callaway | Emergency Diesel Generator Operability Evaluations using 7 Day Mission Time |
05000315/FIN-2014004-02 | 30 September 2014 23:59:59 | Cook | Turbine-Driven Auxiliary Feedwater Mission Time |
05000456/FIN-2014004-06 | 30 September 2014 23:59:59 | Braidwood | Licensee-Identified Violation |
05000456/FIN-2014004-02 | 30 September 2014 23:59:59 | Braidwood | Multiple Failures to Follow Operability Evaluation Process Following Discovery of a Non-Conforming Condition in the Ultimate Heat Sink |
05000285/FIN-2014004-03 | 30 September 2014 23:59:59 | Fort Calhoun | Failure to Verify the Adequacy of the Design of the FO-10 to FO-1 Fuel Oil Transfer System |
05000528/FIN-2014004-01 | 30 September 2014 23:59:59 | Palo Verde | Failure to Translate Design Basis Requirements for Establishing Operability of Spray Pond System |
05000458/FIN-2014007-05 | 30 September 2014 23:59:59 | River Bend | Failure to Promptly Correct Adverse Conditions Associated with Non-cited Violation 05000458/2011008-06 |
05000456/FIN-2014003-01 | 30 June 2014 23:59:59 | Braidwood | Issues That Could Adversely Affect the UHS |
05000458/FIN-2014002-03 | 31 March 2014 23:59:59 | River Bend | Failure to Adequately Control Design Basis Documents for the Emergency Diesel Generators |
05000382/FIN-2014002-01 | 31 March 2014 23:59:59 | Waterford | Failure to Establish Procedures for Using the Alternate Emergency Fuel Oil Storage Tank Fill Line |
05000528/FIN-2013009-01 | 31 March 2014 23:59:59 | Palo Verde | Failure to Translate Design Basis Requirements for Establishing Operability of the Spray Pond System |
05000395/FIN-2013005-01 | 31 December 2013 23:59:59 | Summer | Seal Water Injection Filter Impact on Alternate Seal Injection System and Design Basis Accidents |
05000483/FIN-2013005-03 | 31 December 2013 23:59:59 | Callaway | Failure to Correct Non-conservative Safety Related Equipment Oil Leakage Criteria |
05000275/FIN-2013007-02 | 30 September 2013 23:59:59 | Diablo Canyon | Failure to Evaluate the Auxiliary Feedwater Pump Motor Capability for the Effects of Pump Maximum Brake Horsepower Conditions |
05000266/FIN-2013004-04 | 30 September 2013 23:59:59 | Point Beach | Documentation Error Causes Oversight in Creating Oil Change Tasks for New Auxiliary Feedwater Pump Motors |
05000324/FIN-2013003-05 | 30 June 2013 23:59:59 | Brunswick | Inadequate Design Control for Allowable Jacket Water Leak Rate |
05000483/FIN-2013003-04 | 30 June 2013 23:59:59 | Callaway | Failure to Correctly Screen Repetitive Equipment Failures |
05000482/FIN-2012005-07 | 31 December 2012 23:59:59 | Wolf Creek | Licensee-Identified Violation |
05000482/FIN-2012005-06 | 31 December 2012 23:59:59 | Wolf Creek | Licensee-Identified Violation |