IR 05000397/2024005 | 22 August 2024 | Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) | License Renewal |
IR 05000397/2024002 | 9 August 2024 | Integrated Inspection Report 05000397/2024002 | Enforcement Discretion Squib Functionality Assessment FLEX Maintenance Rule Program Fire Protection Program Operability Assessment Unidentified leak |
GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-054 | 30 July 2024 | Reply to a Notice of Violation, EA-21-170 and EA-23-054 | High Radiation Area |
GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program | 29 July 2024 | Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program | Incorporated by reference Surveillance Frequency Control Program Excess Flow Check Valve |
GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan | 15 July 2024 | Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan | Incorporated by reference |
IR 05000397/2024012 | 10 July 2024 | – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 | |
ML24180A148 | 28 June 2024 | Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information | Safe Shutdown Fitness for Duty Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Operator Manual Action Temporary Modification Aging Management Job Performance Measure Fire Protection Program |
IR 05000397/2024420 | 27 June 2024 | – Security Baseline Inspection Report 05000397 2024420 Cover Letter | Affidavit |
GO2-24-057, Notice of Readiness for Supplemental Inspection | 19 June 2024 | Notice of Readiness for Supplemental Inspection | |
ML24099A223 | 12 June 2024 | Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling | Ultimate heat sink |
GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing | 11 June 2024 | Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing | Stroke time Local Leak Rate Testing |
ML24128A224 | 31 May 2024 | Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | Reactor Vessel Water Level Anticipated operational occurrence |
GO2-24-049, 2023 Annual Radiological Environmental Operating Report | 13 May 2024 | 2023 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl Tritium |
GO2-24-050, Annual Environmental Operating Report | 30 April 2024 | Annual Environmental Operating Report | |
IR 05000397/2024001 | 24 April 2024 | Integrated Inspection Report 05000397/2024001 | Functionality Assessment Fire Protection Program Power change Operability Assessment Siren |
GO2-24-042, 2023 Annual Radioactive Effluent Release Report | 22 April 2024 | 2023 Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
ML24089A228 | 15 April 2024 | – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan | |
GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-01 | 11 April 2024 | Voluntary Response to Regulatory Issue Summary 2024-01 | |
ML24074A453 | 11 April 2024 | Request for Withholding Information from Public Disclosure | Affidavit |
IR 05000397/2024401 | 2 April 2024 | – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) | Affidavit |
IR 05000397/2024403 | 28 March 2024 | Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 | Cyber Security |
GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan | 20 March 2024 | Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan | |
ML24058A069 | 14 March 2024 | Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan | |
GO2-24-041, Level of Financial Protection - Annual Reporting Requirement | 12 March 2024 | Level of Financial Protection - Annual Reporting Requirement | |
ML24044A049 | 12 March 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate | 11 March 2024 | Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate | Flow Induced Vibration Power Uprate Stretch Power Uprate Affidavit |
GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 | 11 March 2024 | Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 | |
ML24047A042 | 7 March 2024 | Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up | Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Scram Discharge Volume License Renewal |
IR 05000397/2023006 | 28 February 2024 | Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) | Cyber Security License Renewal |
IR 05000397/2025301 | 14 February 2024 | Notification of NRC Initial Operator Licensing Examination 05000397/2025301 | |
GO2-24-004, License Amendment Request to Revise Emergency Plan | 30 January 2024 | License Amendment Request to Revise Emergency Plan | Health Physics Network Offsite Dose Calculation Manual Cyber Security Incorporated by reference FLEX B.5.b Tone Alert Radio Severe Accident Management Guideline Earthquake Fuel cladding Minimum staff Fire Protection Program Grace period Backfit Siren Overexposure Potassium iodide ANS Design Report |
IR 05000397/2023004 | 29 January 2024 | Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 | Non-Destructive Examination Offsite Dose Calculation Manual Temporary Modification Functionality Assessment Aging Management Feedwater Heater Process Control Program Integrated leak rate test Maintenance Rule Program Fire Protection Program Scaffolding Operability Assessment |
GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing | 29 January 2024 | Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing | Safe Shutdown Ultimate heat sink Stroke time Incorporated by reference Excess Flow Check Valve |
ML24011A152 | 10 January 2024 | March 2024 Emergency Preparedness Exercise Inspection-Request for Information | Siren |
GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 | 8 January 2024 | Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 | High Radiation Area Final Significance Determination of a White Finding |
GO2-23-136, Guarantee of Payment of Deferred Premium | 20 December 2023 | Guarantee of Payment of Deferred Premium | |
GO2-23-130, Reply to a Notice of Violation; EA-23-054 | 14 December 2023 | Reply to a Notice of Violation; EA-23-054 | |
GO2-23-135, Notice of Readiness for Supplemental Inspection | 14 December 2023 | Notice of Readiness for Supplemental Inspection | Final Significance Determination of a White Finding |
GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report | 12 December 2023 | Licensing Basis Document Update and Biennial Commitment Change Report | Aging Management License Renewal |
ML23288A000 | 7 December 2023 | Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program |
GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | 5 December 2023 | Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | Reactor Vessel Water Level |
GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 | 28 November 2023 | Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 | |
GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 27 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
IR 05000397/2023012 | 20 November 2023 | Commercial Grade Dedication Inspection Report 05000397/2023012 | Commercial Grade Dedication Scram Discharge Volume Commercial Grade |
IR 05000397/2023010 | 9 November 2023 | Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 | High Radiation Area Locked High Radiation Area Local Leak Rate Testing Operability Assessment |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
IR 05000397/2023093 | 1 November 2023 | Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 | Significance Determination Process Preliminary White Finding Substantial potential for overexposure Overexposure Final Significance Determination of a White Finding |
ML23299A207 | 26 October 2023 | Biennial Requalification Inspection Request for Information | |
IR 05000397/2023003 | 25 October 2023 | Integrated Inspection Report 05000397/2023003 | Fire Barrier Stroke time Functionality Assessment FLEX Excess Flow Check Valve Time Critical Operator Action Maintenance Rule Program Fire Protection Program Weak link Operability Assessment |
IR 05000397/2023011 | 4 October 2023 | License Renewal Phase 2 Report 05000397/2023011 | Boric Acid Non-Destructive Examination Fire Barrier Coatings Nondestructive Examination Temporary Modification High Energy Line Break Aging Management Flow Accelerated Corrosion Stress corrosion cracking Integrated leak rate test License Renewal Control of Heavy Loads Fire Protection Program Power Uprate Thermography |