Semantic search
Jump to navigation
Jump to search
Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000313/FIN-2018003-04 | 2018Q3 | Arkansas Nuclear | Failure to Verify Safety-Related 4160 V Breaker Operability Following Maintenance Activities | |
05000313/FIN-2018003-06 | 2018Q3 | Arkansas Nuclear | Reactor Power Transient Caused by the Turbine Bypass Valve Failing Open | |
05000458/FIN-2018012-03 | 2018Q2 | River Bend | Failure to Establish Procedural Guidance for Determining Core Flow During Unanticipated Single Loop Operations | |
05000416/FIN-2017012-01 | 2017Q3 | Grand Gulf | Failure to Correct Instrument Calibration Process in a Timely Manner | Significance Determination Process Substantial potential for overexposure |
05000416/FIN-2017012-02 | 2017Q3 | Grand Gulf | Failure to Operate the Gaseous Radwaste System Within Design Specifications | Significance Determination Process |
05000483/FIN-2017003-01 | 2017Q3 | Callaway | Spurious Containment Spray Pump Start | Significance Determination Process Maintenance Rule Program |
05000445/FIN-2017002-01 | 2017Q2 | Comanche Peak | Failure to Control Transient Combustible Material in Accordance with a Fire Protection Procedure | Safe Shutdown Significance Determination Process Fire Protection Program |
05000298/FIN-2017010-01 | 2017Q2 | Cooper | Failure to Assign Corrective Actions to Prevent Recurrence of High Pressure Coolant Injection Failure | Condition Adverse to Quality Significance Determination Process |
05000458/FIN-2017007-02 | 2017Q2 | River Bend | Failure to Perform an Adequate Operability Determination for a Condition Identified During an NRC Walkdow | Significance Determination Process |
05000482/FIN-2017001-01 | 2017Q1 | Wolf Creek | Failure to Provide Adequate Work Instructions for Preventive Maintenance | |
05000313/FIN-2016404-02 | 2016Q4 | Arkansas Nuclear | Security | |
05000382/FIN-2016008-03 | 2016Q4 | Waterford | Failure to Include Appropriate Quantitative Acceptance Criteria for the Reconstituted Feedwater/Emergency Feedwater Monitoring Plan Associated with Steam Generator Replacement Induced Vibration | |
05000528/FIN-2016008-01 | 2016Q1 | Palo Verde | Operations Department Failure to Document Conditions Adverse to Quality in Condition Reports | |
05000313/FIN-2016007-01 | 2016Q1 | Arkansas Nuclear | Failure to Complete Extent of Condition Reviews for the Stator Drop Significant Condition Adverse to Quality Event | Condition Adverse to Quality Significance Determination Process |
05000285/FIN-2015009-01 | 2015Q4 | Fort Calhoun | Failure to Take Adequate Corrective Action to Preclude Repetition of a Significant Condition Adverse to Quality Associated with Emergency Diesel Generator Room Water Intrusions | Condition Adverse to Quality Significance Determination Process |
05000445/FIN-2015005-03 | 2015Q4 | Comanche Peak | Inadequate Compensatory Measures for Seismic Monitoring System Maintenance | Significance Determination Process |
05000445/FIN-2015005-06 | 2015Q4 | Comanche Peak | Failure to Barricade High Radiation Areas | High Radiation Area Significance Determination Process Substantial potential for an overexposure |
05000382/FIN-2015002-01 | 2015Q2 | Waterford | Failure to Identify and Secure Potential Tornado-Borne Missile Hazards | Large early release frequency |
05000498/FIN-2015002-01 | 2015Q2 | South Texas | Failure to Follow Hurricane Plan Procedure to Secure Missile Hazards During Tropical Storm Bill | |
05000382/FIN-2015007-02 | 2015Q2 | Waterford | Failure to Provide a Bounding Calculation for Time Critical Actions | Fire impairment |
05000382/FIN-2015007-04 | 2015Q2 | Waterford | Failure to Correct Long Standing Deficiencies with the Appendix R Emergency Lighting Units | Safe Shutdown Emergency Lighting Significance Determination Process |
05000298/FIN-2015008-02 | 2015Q2 | Cooper | Failure to Adequately Torque Fasteners on Emergency Diesel Generator Number 2 | Significance Determination Process |
05000397/FIN-2015007-05 | 2015Q1 | Columbia | Failure to Translate Design Basis into Component Classification Evaluation Records | Maintenance Rule Program |
05000528/FIN-2014404-04 | 2015Q1 | Palo Verde | Security | |
05000285/FIN-2013018-07 | 2014Q4 | Fort Calhoun | Failure to Maintain Design Control of the Auxiliary Feedwater | Significance Determination Process |
05000275/FIN-2014007-02 | 2014Q3 | Diablo Canyon | V Inadequate Technical Specification Surveillance Requirement for Emergency Diesel Generators | |
05000458/FIN-2014007-04 | 2014Q3 | River Bend | Failure to Correct Identified Negative Safety Margin in Design Documents for Reactor Core Isolation Cooling Valves under Postulated High Energy Line Break Conditions | Significance Determination Process |
05000254/FIN-2014007-02 | 2014Q3 | Quad Cities | Inadequate Administrative Controls 05000265/2014007-02 | Significance Determination Process |
05000382/FIN-2014008-01 | 2014Q2 | Waterford | Inadequate Procedures for Securing Dry Cooling Tower Fans | Significance Determination Process |
05000382/FIN-2014008-02 | 2014Q2 | Waterford | Failure to Identify and Correct Condition Adversely Affecting Flooding Mitigation Design | Condition Adverse to Quality |
05000285/FIN-2013019-01 | 2013Q4 | Fort Calhoun | Failure to Correct Deficiencies in Operations Support Center Functions | Significance Determination Process |
05000397/FIN-2013007-03 | 2013Q3 | Columbia | Failure to Establish Emergency Procedures for Filling and Venting Diesel Fuel Oil Tanks after Tornado Damage | |
05000397/FIN-2013007-08 | 2013Q3 | Columbia | Failure to Correct a Condition Adverse to Quality with Emergency Operating Procedures | Condition Adverse to Quality |
05000397/FIN-2013008-04 | 2013Q3 | Columbia | Failure to Control Inadequate Surveillance Procedure | |
05000397/FIN-2013008-05 | 2013Q3 | Columbia | Failure to Implement Procedure for Age Management of Electrolytic Capacitors | |
05000445/FIN-2013007-11 | 2013Q2 | Comanche Peak | Failure to Correct Design Calculations to Incorporate Technical Specification Allowed Frequency Range for the Emergency Diesel Generator in a Timely Manner | Condition Adverse to Quality Significance Determination Process |
05000285/FIN-2013008-02 | 2013Q2 | Fort Calhoun | Frazil Ice Monitor Not Operational | Time to boil Significance Determination Process Frazil ice |
05000285/FIN-2013010-04 | 2013Q2 | Fort Calhoun | Failure to Perform Extent of Condition Evaluation | |
05000397/FIN-2013002-03 | 2013Q1 | Columbia | Failure to Address Noticeable Differences in the Simulator in Accordance with Ansi/Ans 3.5-1998 and -2009 | Significance Determination Process |
05000285/FIN-2012012-03 | 2012Q4 | Fort Calhoun | Failure to Properly Manage the Functionality of the River Sluice Gates | Functionality Assessment |
05000298/FIN-2012004-07 | 2012Q3 | Cooper | Failure to Provide Procedure Appropriate to the Circumstance of Assembling the Zurn Strainer | Significance Determination Process Maintenance Rule Program |
05000285/FIN-2012005-02 | 2012Q3 | Fort Calhoun | Untimely Corrective Actions for 480 VAC Breaker Issues | |
05000361/FIN-2012004-01 | 2012Q3 | San Onofre | Failure to Correct Drill Performance Weaknesses | Significance Determination Process |
05000482/FIN-2012007-03 | 2012Q2 | Wolf Creek | Failure to Take Timely Corrective Action to Preclude Repetition | |
05000298/FIN-2012007-05 | 2012Q2 | Cooper | Failure to Have an Adequate Procedure for Erecting Flood Barriers | Significance Determination Process Earthquake |
05000482/FIN-2012007-08 | 2012Q2 | Wolf Creek | Failure to Adequately Evaluate the Suitability of NONSAFETY-RELATED Gaskets, O-RINGS, and Seals Installed in SAFETY-RELATED Equipment and to Identify Extent of the Condition | |
05000285/FIN-2011406-02 | 2012Q1 | Fort Calhoun | Security | |
05000528/FIN-2012002-04 | 2012Q1 | Palo Verde | Failure in the Choice of Protective Actions Consistent with Federal Guidance | |
05000313/FIN-2011004-04 | 2011Q3 | Arkansas Nuclear | Failure to Verify the Adequacy of Design of Unit 1 Emergency Core Cooling Systems to Address Potential Voiding | |
05000298/FIN-2011004-04 | 2011Q3 | Cooper | Failure to Assess and Manage Risk for Maintenance Near an Operating Reactor Feed Pump That Could Impact Initiating Events | Significance Determination Process |