Finding | |
|---|---|
| Title | Failure to Verify the Adequacy of Design of Unit 1 Emergency Core Cooling Systems to Address Potential Voiding |
| Description | The inspector identified a noncited violation of 10 CFR 50 Appendix B Criterion III for failure to verify and check the adequacy of design by performance of design reviews, alternate calculations, or a suitable testing program. Specifically, the licensee identified potential void locations during engineering evaluations of the Unit 1 High Pressure Injection, Decay Heat Removal / Low Pressure Injection, Core Flood, and Building Spray systems and did not verify the adequacy of the design of those systems to ensure continued operability. The licensee performed ultrasonic testing on these locations at the time of the identification, but did not install vents, determine an acceptable void size, or establish a program to periodically vent or monitor these locations. The licensee entered this issue into their corrective action program as Condition Report CR-ANO-1-2011-1406. The failure to verify and check the adequacy of design of the Unit 1 High Pressure Injection, Decay Heat Removal/Low Pressure Injection, Core Flood, and Building Spray systems is a performance deficiency. The performance deficiency is more than minor because it is associated with the design control attribute of the Mitigating Systems cornerstone and adversely affected the objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspector performed a Phase 1 screening, in accordance with Inspection Manual Chapter 0609, Attachment 4, Phase 1 Initial Screening and Characterization of Findings, and determined that the finding was of very low safety significance (Green), because the finding was confirmed not to result in a loss of operability. This finding has a crosscutting aspect in the area of problem identification and resolution in the corrective action component because the licensee did not takes appropriate corrective actions to address safety issues in a timely manner. |
| Site: | Arkansas Nuclear |
|---|---|
| Report | IR 05000313/2011004 Section 4OA5 |
| Date counted | Sep 30, 2011 (2011Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | |
| Inspectors (proximate) | A Sanchez J Rotton K Clayton L Ricketson R Azua R Kumana W Schaup |
| CCA | P.3, Resolution |
| INPO aspect | PI.3 |
| ' | |