| Title | Failure to Take Adequate Corrective Action to Preclude Repetition of a Significant Condition Adverse to Quality Associated with Emergency Diesel Generator Room Water Intrusions |
| Description | The team identified an NCV of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Actions, for the licensees failure to take corrective actions to prevent repetition of a significant condition adverse to quality. Specifically, since February 2009, the licensee failed to take corrective actions to prevent repetitive water intrusions from the Auxiliary Building HVAC room (Room 82) into the number one Emergency Diesel Generator room (Room 63). The inspectors determined that the licensees failure to implement corrective actions to preclude repetitive water intrusions into Room 63 was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external factors attribute of the mitigating systems cornerstone. Specifically, water intrusion events from Room 82 into Room 63 could challenge the reliability of the emergency diesel generator when relied upon during a loss of offsite power. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Question, inspectors determined that the finding was of very low safety significance (Green). The finding has a problem identification and resolution cross-cutting aspect within the area of Resolution, because the licensee did not take effective corrective actions to address issues in a timely manner commensurate with their safety significance [P.3]. |
| Site: | Fort Calhoun |
|---|---|
| Report | IR 05000285/2015009 Section 4OA2 |
| Date counted | Dec 31, 2015 (2015Q4) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | B Cummings E Ruesch H Freeman M Williams R Azua |
| Violation of: | 10 CFR 50 Appendix B Criterion XVI |
| CCA | P.3, Resolution |
| INPO aspect | PI.3 |
| ' | |