 QuarterSiteTitleTopic
05000416/FIN-2018003-012018Q3Grand GulfFailure to Develop Adequate Work Instructions
05000458/FIN-2018012-052018Q2River BendFailure to Develop an Adequate Operational Decision-Making Issue for Compensatory Measures Related to a Degraded Condition of the Feedwater System Sparger Nozzles
05000482/FIN-2017008-022017Q4Wolf CreekFailure to Provide Adequate Emergency LightingSafe Shutdown
Emergency Lighting
Significance Determination Process
05000313/FIN-2017007-012017Q3Arkansas NuclearFailure to Promptly Identify and Correct an Inadequate Design Bases CalculationCondition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
05000254/FIN-2017002-012017Q2Quad CitiesFailure to Establish aProcedure Appropriate for Calibration of RCIC GovernorSignificance Determination Process
05000416/FIN-2017001-012017Q1Grand GulfFailure to Conduct a Drill Required by the Site Emergency Plan in 2014Significance Determination Process
05000397/FIN-2017008-022017Q1ColumbiaOperators Fail To Follow Procedure Causes RCIC Overspeed TripSignificance Determination Process
Maintenance Rule Program
05000397/FIN-2017008-012017Q1ColumbiaOperators Fail To Follow Reactor Scram ProcedureSignificance Determination Process
Maintenance Rule Program
05000482/FIN-2016410-012016Q4Wolf CreekSecurity
05000482/FIN-2016007-042016Q2Wolf CreekFailure to Promptly Correct Deficiencies With Operator Time Critical ActionsSignificance Determination Process
05000498/FIN-2016002-022016Q2South TexasFailure to Control Steam Generator Water Levels at Low PowerSignificance Determination Process
05000483/FIN-2016002-052016Q2CallawayFailure to Follow Plant Foreign Material Exclusion ProcedureSignificance Determination Process
Foreign Material Exclusion
05000458/FIN-2015008-022015Q3River BendFailure to Promptly Document Adverse Conditions in the Corrective Action Program
05000458/FIN-2015406-012015Q2River BendSecurity
05000285/FIN-2015002-072015Q2Fort CalhounFailure to Perform Functionality Assessments for the Spent Fuel Pool Cooling SystemBoric Acid
Functionality Assessment
Significance Determination Process
05000446/FIN-2015001-072015Q1Comanche PeakInadequate Centrifugal Charging Pump Lubricating Oil Pump Installation ProcedureSignificance Determination Process
05000285/FIN-2014009-162014Q3Fort CalhounFailure to Correct Longstanding Software Classification IssuesSignificance Determination Process
Maintenance Rule Program
05000254/FIN-2014007-012014Q3Quad CitiesInadequate Rounds Package Acceptance CriteriaSignificance Determination Process
05000368/FIN-2014004-032014Q3Arkansas NuclearFailure to Implement Procedural Requirements for Axial Shape Index during a Rapid Power ReductionSignificance Determination Process
05000313/FIN-2014003-032014Q2Arkansas NuclearFailure to Repair a Through Wall Flaw in Spent Fuel Pool PipingFunctionality Assessment
Significance Determination Process
Through Wall Leak
05000298/FIN-2014003-032014Q2CooperFailure to Follow Seismic Housekeeping Requirements for ScaffoldingSignificance Determination Process
Maintenance Rule Program
Scaffolding
05000528/FIN-2014002-012014Q1Palo VerdeFailure to Follow Protected Equipment ProcedureSignificance Determination Process
05000285/FIN-2014002-042014Q1Fort CalhounFailure to Request a License Amendment for Required Change to Technical Specifications
05000285/FIN-2014007-012014Q1Fort CalhounFailure to Follow Procedures for Classifying Component FailuresSignificance Determination Process
05000285/FIN-2014007-042014Q1Fort CalhounFailure to perform an immediate operability determinationSignificance Determination Process
05000313/FIN-2013005-012013Q4Arkansas NuclearFailure to Maintain Fluorescent Light Fixture Above Emergency Feedwater Pump in Seismically Qualified ConfigurationSignificance Determination Process
05000368/FIN-2013005-022013Q4Arkansas NuclearInadequate Operability Evaluation Due to Failure to Characterize Weld FlawSignificance Determination Process
05000445/FIN-2013004-042013Q3Comanche PeakFailure to Initiate a Condition Report for a Degraded Under Frequency RelaySignificance Determination Process
05000416/FIN-2013004-052013Q3Grand GulfFailure to Implement the Offsite Dose Calculation ManualOffsite Dose Calculation Manual
Significance Determination Process
05000445/FIN-2013003-022013Q2Comanche PeakFailure to Follow Procedure Results in Water HammerSignificance Determination Process
05000361/FIN-2013002-012013Q1San OnofreFailure to Completely Inspect and Maintain PMF BermSignificance Determination Process
Large early release frequency
05000482/FIN-2012005-012012Q4Wolf CreekFailure Rates Exceed Twenty Percent for Biennial Requalification ExamSignificance Determination Process
05000254/FIN-2012005-022012Q4Quad CitiesFailure to Follow Surveillance Procedure
05000528/FIN-2012004-062012Q3Palo VerdeFailure to Declare an Unusual EventSignificance Determination Process
Earthquake
05000382/FIN-2012403-042012Q3WaterfordSecurity
05000416/FIN-2012003-022012Q2Grand GulfInadequate Corrective Actions to Address Configuration Control of Previous Non-Cited ViolationSignificance Determination Process
05000361/FIN-2012003-012012Q2San OnofreDegraded Fire Barrier Separating Unit 2 Shutdown Cooling Heat Exchanger RoomsSafe Shutdown
Fire Barrier
Significance Determination Process
Fire Protection Program
05000458/FIN-2012002-012012Q1River BendFailure to Adequately Monitor the Performance of the Digital Radiation Monitoring SystemMaintenance Rule Program
05000483/FIN-2011005-052011Q4CallawayImproper Ground and Test Device Damages Residual Heat Removal Pump SwitchgearSignificance Determination Process
05000458/FIN-2011008-072011Q4River BendInadequate Abnormal Procedure for Reducing Loads on Standby Diesel Generators
05000458/FIN-2011008-092011Q4River BendInadequate Simulator Fidelity for Emergency Diesel Generator LoadingSignificance Determination Process
05000445/FIN-2011005-012011Q4Comanche PeakFailure to Remove Materials and Debris from Containment
05000445/FIN-2011406-012011Q4Comanche PeakSecurity
05000498/FIN-2011402-012011Q4South TexasSecurity
05000416/FIN-2011003-012011Q2Grand GulfFailure to Perform an Adequate Inspection of Probable Maximum Precipitation Door Seals Protecting Safety Related Equipment
05000482/FIN-2011003-052011Q2Wolf CreekFailure to Assure Configuration Control of Safety-Related SystemsBoric Acid
05000482/FIN-2011003-032011Q2Wolf CreekFailure to Assure Fillet Weld Met Size Requirements on Train B Charging Header Vent Line
05000416/FIN-2011003-062011Q2Grand GulfLoose Fuse Clips in Division 3 Emergency Diesel GeneratorCondition Adverse to Quality
05000498/FIN-2010007-012011Q1South TexasNonconservative Modeling of Engineered Safety Feature Transformer Load Tap Changer Controller Dead Band
05000458/FIN-2011403-012011Q1River BendSecurity