Title | Failure to Conduct a Drill Required by the Site Emergency Plan in 2014 |
Description | Green. The inspectors identified a non-cited violation of 10 CFR 50.54(q)(2) associated with the licensees failure to conduct a drill required by the site emergency plan in 2014. The licensee was required to conduct a drill involving both the site first-aid team and a local hospital. This violation is not an immediate safety concern because drills were conducted involving the site first-aid team and other drills were conducted at local hospitals. This issue has been entered into the licensees corrective action program as Condition Report CR-GGN-2017-00311. The performance deficiency was more than minor, and therefore a finding, because it was associated with the emergency response organization performance (drills and exercises) cornerstone attribute and adversely affected the Emergency Preparedness Cornerstone objective of being capable of implementing adequate measures to protect the health and safety of the public in the event of a radiological emergency. The finding was evaluated using Inspection Manual Chapter 0609, Appendix B, Emergency Preparedness Significance Determination Process, dated September 22, 2015. The finding was determined to be of very low safety significance (Green) because it was a failure to comply with NRC requirements, was not associated with the risk-significant planning standards, and was not a degraded planning standard function. The finding had a cross-cutting aspect in the area of human performance associated with training because the licensee did not maintain a workforce knowledgeable about the requirements of the emergency plan [H.9] |
Site: | Grand Gulf |
---|---|
Report | IR 05000416/2017001 Section 1EP5 |
Date counted | Mar 31, 2017 (2017Q1) |
Type: | NCV: Green |
cornerstone | Emergency Prep |
Identified by: | NRC identified |
Inspection Procedure: | IP 71114.05 |
Inspectors (proximate) | E Uribe G Warnick L Carson M Phalen M Young N Day P Elkmann S Hedger |
Violation of: | 10 CFR 50.54 10 CFR 50.54(q) |
CCA | H.9, Training |
INPO aspect | CL.4 |
' | |