Category:Letter type:RBG
MONTHYEARRBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report RBG-48221, 2022 Annual Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Radiological Environmental Operating Report RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-27027 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RBG-48198, Report of Changes and Errors to 10CFR50.462022-09-22022 September 2022 Report of Changes and Errors to 10CFR50.46 RBG-48187, Notification of Spent Fuel Cask Use2022-08-15015 August 2022 Notification of Spent Fuel Cask Use RBG-48184, Notification of Spent Fuel Cask Use2022-07-18018 July 2022 Notification of Spent Fuel Cask Use RBG-48178, Notification of Spent Fuel Cask Use2022-06-29029 June 2022 Notification of Spent Fuel Cask Use RBG-48166, Supplement to Special Report for Tritium Discovered Onsite2022-05-12012 May 2022 Supplement to Special Report for Tritium Discovered Onsite RBG-48149, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report RBG-48148, 2021 Annual Radiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Radiological Environmental Operating Report RBG-48134, Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency2021-11-29029 November 2021 Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency RBG-48136, Additional Information for the 2020 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2020 Annual Radioactive Effluent Release Report RBG-48137, Additional Information for the 2019 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2019 Annual Radioactive Effluent Release Report RBG-48128, Reply to a Notice of Violation; EA-21-017, 030 and 0502021-10-29029 October 2021 Reply to a Notice of Violation; EA-21-017, 030 and 050 RBG-48129, Payment of a Civil Penalty2021-10-21021 October 2021 Payment of a Civil Penalty RBG-48112, Report of Changes and Errors to 10CFR50.462021-09-16016 September 2021 Report of Changes and Errors to 10CFR50.46 RBG-48110, Core Operating Limits Report (COLR) - Cycle 22, Revision 12021-08-19019 August 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 1 RBG-48104, Fitness for Duty Blind Quality Assurance Specimen Testing Error2021-06-30030 June 2021 Fitness for Duty Blind Quality Assurance Specimen Testing Error RBG-48099, Submittal of Owner'S Activity Report Form for Cycle 212021-06-16016 June 2021 Submittal of Owner'S Activity Report Form for Cycle 21 RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials RBG-48093, Corrected 2020 Annual Radiological Environmental Operating Report2021-05-20020 May 2021 Corrected 2020 Annual Radiological Environmental Operating Report RBG-48082, 2020 Annual Radiological Environmental Operating Report2021-04-20020 April 2021 2020 Annual Radiological Environmental Operating Report RBG-48081, 2020 Annual Radioactive Effluent Release Report2021-04-20020 April 2021 2020 Annual Radioactive Effluent Release Report RBG-48078, Core Operating Limits Report (COLR) - Cycle 22, Revision 02021-03-14014 March 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 0 RBG-48075, Notification of Deviation from BWRVIP Guidelines2021-02-24024 February 2021 Notification of Deviation from BWRVIP Guidelines RBG-48074, Spent Fuel Storage Radioactive Effluent Release Report for 20202021-02-22022 February 2021 Spent Fuel Storage Radioactive Effluent Release Report for 2020 RBG-48061, One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-12-0303 December 2020 One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency RBG-48054, Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program2020-11-0202 November 2020 Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program RBG-48049, Reply to a Notice of Violation; EA-20-0582020-10-26026 October 2020 Reply to a Notice of Violation; EA-20-058 RBG-48038, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic2020-10-0606 October 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic RBG-48042, Submittal of Rev. 48 to Emergency Plan2020-09-22022 September 2020 Submittal of Rev. 48 to Emergency Plan RBG-48039, Report of Changes and Errors to 10CFR50.462020-09-16016 September 2020 Report of Changes and Errors to 10CFR50.46 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RBG-48023, Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures2020-06-0909 June 2020 Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures RBG-48019, 2019 Annual Radioactive Effluent Release Report2020-04-30030 April 2020 2019 Annual Radioactive Effluent Release Report RBG-48020, Annual Radiological Environmental Operating Report2020-04-30030 April 2020 Annual Radiological Environmental Operating Report RBG-48018, Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date2020-04-24024 April 2020 Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date 2024-01-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 RBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.2019-11-18018 November 2019 Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 RBG-47925, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-12-20020 December 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47918, Removal of the Table of Contents from the Technical Specifications2018-11-29029 November 2018 Removal of the Table of Contents from the Technical Specifications RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-18018 October 2018 Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 RBG-47883, Amendment 1 to License Renewal Application2018-08-0202 August 2018 Amendment 1 to License Renewal Application RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47882, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-10010 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47850, Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement2018-04-0404 April 2018 Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement RBG-47824, License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves2018-04-0202 April 2018 License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves RBG-47848, License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement2018-03-22022 March 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47830, License Renewal Application Update - Neutron Absorbing Material Monitoring Program2018-02-15015 February 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program RBG-47823, Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling2018-01-29029 January 2018 Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application RBG-47735, License Renewal Application - Appendices a Through D2017-05-31031 May 2017 License Renewal Application - Appendices a Through D ML17153A2852017-05-25025 May 2017 License Renewal Application RBG-47630, Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 12015-12-0303 December 2015 Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 1 RBG-47620, License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months2015-10-29029 October 2015 License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating2014-07-0909 July 2014 Application for Change to Technical Specification 3.8.1, AC Sources - Operating CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments RBG-47432, License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity2014-02-10010 February 2014 License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity RBG-47382, Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-132013-07-29029 July 2013 Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-13 RBG-47361, Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2013-07-16016 July 2013 Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. RBG-47322, Submittal of Request for Amendment to the Technical Specifications2013-06-13013 June 2013 Submittal of Request for Amendment to the Technical Specifications CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments RBG-47332, Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria2013-02-0707 February 2013 Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria ML12191A1222012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating.2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating. RBG-47072, License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies2010-09-0909 September 2010 License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies RBG-47048, License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities2010-07-22022 July 2010 License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML0934801612009-12-0909 December 2009 Submittal of License Amendment Request - Cyber Security Plan RBG-46932, License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles2009-08-10010 August 2009 License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements2009-06-29029 June 2009 License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0902701982009-01-21021 January 2009 License Amendment Request 2009-01, Application for Technical Specifications (TS) Change to Adopt NRC Approved Generic Changes TSTF-163, TSTF-222, TSTF-230, and TSTF-306 to the Improved Technical Specifications RBG-46870, License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request2008-12-0808 December 2008 License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request 2023-07-27
[Table view] |
Text
Entergy Operations, Inc.
Entergx River Bend Station 5485 U.S. Highway 61 N
- 51. Francisville. LA 70775 Tel 225-381 -4374 Timothy Schenk Regulatory Assurance Manager RBG-47882 July 10, 2018 Attn : Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville , MD 20852-2738
Subject:
Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
River Bend Station , Unit 1 Docket No. 50-458 License No. NPF-47
Dear Sir or Madam :
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR 50.90), "Application for amendment of license, construction permit, or early site permit",
Entergy Operations, Inc. (Entergy) previously submitted a request for an amendment to the Technical Specifications (TS) for River Bend Station , Unit 1 (RBS) .
The proposed amendment would modify the RBS TS by relocating specific surveillance frequencies to a licensee-controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies".
Entergy originally submitted this request by RBS letter RBG-47799 dated February 28, 2018.
[ADAMS Accession Number ML18067A115]
It has recently been determined that five of the TS pages submitted for change by the amendment were not the current RBS TS pages. Attachment 1 contains the five current RBS TS pages with the proposed changes (mark-up). Attachment 2 contains the revised TS pages. The five pages contained in this supplement should supersede the corresponding pages of the original amendment.
The supplemental information provided does not change the scope of the original submittal.
Entergy requests approval the proposed license amendment by February 28, 2019 with the amendment being implemented within 90 days.
RBG-47882 Page 2 of 2 There are no regulatory commitments contained in this submittal. If you have any questions, please contact Mr. Tim Schenk at 225-381-4177.
TAS/twf ATTACHMENT:
- 1. Proposed Technical Specification Changes (Mark-up)
- 2. Revised Technical Specification Pages cc:
u .S. Nuclear Regulatory Commission Attn: Ms. Lisa M. Regner, Project Manager 09-D-14 One White Flint North 11555 Rockville Pike Rockville, MD 20852 u.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.
Arlington , TX 76011-4511 NRC Senior Resident Inspector Attn: Mr. Jeff Sowa 5485 U.S. Highway 61 , Suite 1 St. Francisville, LA 70775 Public Utility Commission of Texas Attn: PUC Filing Clerk 1701 N. Congress Avenue P. O. Box 13326 Austin , TX 78711-3326 RBF1-18-0142
ATTACHMENT 1 RBG-47882 PROPOSED TECHNICAL SPECIFIACTION CHANGES (MARK-UP)
SLC System 3.1.7 SURVEILLANCE FREQUENCY SR 3.1.7.5 Verify the available weight of Boron-1 0 is ~ 170 Ibs, 31 days and the percent weight concentration of sodium pentaborate in solution is :s:; 9.5% by weight, and determine the minimum required available solution volume. Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after water or boron is added to solution Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored to ~ 45°F SR 3.1.7.6 Verify each SLC subsystem manual , power operated , 31 days ...- - - - 1 and automatic valve in the flow path that is not locked , sealed , or otherwise secured in position , is in the correct position, or can be aligned to the correct position .
SR 3.1.7.7 Verify each pump develops a flow rate ~ 41 .2 gpm at In accordance with a discharge pressure ~ 1250 psig . the Inservice Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem from pump 24 Fflonths on a +--
into reactor pressure vessel. STl\GG~R~D T~ST BASIS (continued)
In accordance with the Surveillance frequency Control Program RIVER BEND 3.1-22 Amendment No. 81 114, 463
SGT System 3.6.4 .3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4 .3.1 Operate each SGT subsystem for ~ 15 continuous ~~ says .....
.L minutes with heaters operating.
SR 3 .6.4.3.2 Perform required SGT filter testing in accordance In accordance with with the Ventilation Filter Testing Prog ram (VFTP). the VFTP SR 3.6.4 .3.3 Verify each SGT subsystem actuates on an actual 24 Ffl9Att:lS L..
or simulated initiation signal.
L..
SR 3.6.4 .3.4 Verify each SGT filter cooling bypass 24 Ffl9Att:lS damper can be opened and the fan started .
In accordance with the Surveillance Frequency Control r--
Program RIVER BEND 3.6-52 Amendment No. 84, 168, ~83
Fuel Building Ventilation System-Fuel Handling 3.6.4 .7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.7.1 Verify one fuel building ventilation ch arcoa el;lFS ..-
filtration subsystem in operation .
SR 3.6.4 .7.2 Operate each fuel building ventilati on charcoal 31 days ...-
filtration subsystem for ~ 15 continu ous minutes with heaters operating .
SR 3.6.4 .7.3 Perform fuel building ventilation ch arcoal filtration In accordance with filter testing in accordance with the Ventilation the VFTP Filter Testing Program (VFTP).
SR 3.6.4 .7.4 Verify each fuel building ventilation charcoal 24 menths "-
filtration subsystem actuates on an actual or simulated initiation signal.
SR 3.6.4.7.5 Verify each fuel building ventilation charcoal 24 menths ..-
filtration filter cooling bypass damp er can be opened and the fan started .
In accordance with the Surveillance Frequency Control Program RIVER BEND 3.6-59 Amendment No. 84, 4e8, 4S3
CRFA System 3.7 .2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F. Two CRFA subsystems F.1 Suspend movement of Immediately inoperable during recently irradiated fuel movement of recently assembl ies in the primary irradiated fuel assemblies containment and fuel in the primary containment building .
or fuel building , or during OPDRVs.
F.2 Initiate action to suspend Immediately OPDRVs.
One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irrad iated fuel assemblies in the primary containment or fuel building , or during OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 Operate each CRFA subsystem for ~ 15 continuous 31 days """
minutes with the heaters operating .
SR 3.7.2.2 Perform required CRFA filter testing in accordance In accordance with with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.2.3 Verify each CRFA subsystem actuates on an actual 24 months ,
./
or simulated initiation signal.
(continued)
In accordance with the Surveillance r--
Frequency Control Program RIVER BEND 3.7-7 Amendment No. 81119 132 154 4%, +68, 48a
DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is ~ 130.2 V on float 7 days -"
charge .
SR 3.8.4 .2 Verify no visible corrosion at battery terminals and 92 days --....
connectors .
OR Verify battery connection resistance is
~ 1.5 E-4 ohm for inter-cell connections ,
In accordance wi th the
~ 1.5 E-4 ohm for inter-rack connections ,
Surveillance Freq uency
~ 1.5 E-4 ohm for inter-tier connections, and Control Program
~ 1.5 E-4 ohm for terminal connections.
AND Verify the total resistance for battery inter-cell ,
inter-rack, inter-tier, and terminal connections combined is s 27.45 E-4 ohms.
SR 3.8.4 .3 Verify battery cells, cell plates, and racks show no visual indication of physical damage or abnormal 24 Fft9RtRS deterioration.
SR 3.8.4.4 Remove visible corrosion, and verify battery cell to 24 Fft9RtRS ....
cell and terminal connections are coated with anti-corrosion material.
Verify battery connection resistance is 24 .,-
SR 3.8.4.5 Fft9RtRS ....
5{ 1.5 E-4 ohm for inter-cell connections, 5{ 1.5 E-4 ohm for inter-rack connections, 5{ 1.5 E-4 ohm for inter-tier connections, and 5{ 1.5 E-4 ohm for terminal connections.
AND Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is s 27.45 E-4 ohms.
RIVER BEND 3.8-25 Amendment No. 84, 4e8, 484
ATTACHMENT 2 RBG-47882 REVISED TECHNICAL SPECIFACTION PAGES
SLC System 3.1.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.1.7.5 Verify the available weight of Boron-10 is ~ 170 Ibs, In accordance with and the percent weight concentration of sodium the Surveillance pentaborate in solution is ~ 9.5% by weight, and Frequency Control determine the minimum required available solution Program volume .
Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after water or boron is added to solution Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored to ~ 45°F SR 3.1.7.6 Verify each SLC subsystem manual , power operated, In accordance with and automatic valve in the flow path that is not the Surveillance locked, sealed, or otherwise secured in position , is in Frequency Control the correct position , or can be aligned to the correct Program position .
SR 3.1.7.7 Verify each pump develops a flow rate ~ 41.2 gpm at In accordance with a discharge pressure ~ 1250 psig. the Inservice Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem from pump In accordance with into reactor pressure vessel. the Surveillance Frequency Control Program (continued)
RIVER BEND 3.1 -22 Amendment No. 81 114 , +e8-
SGT System 3.6.4.3 SURVEILLANCE REQUIREMENTS SU RVEI LLANCE FREQUENCY SR 3.6.4.3.1 Operate each SGT subsystem for ~ 15 continuous In accordance with minutes with heaters operating. the Surveillance frequency Control Program SR 3.6.4.3.2 Perform required SGT filter testing in accordance In accordance with with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.6.4.3.3 Verify each SGT subsystem actuates on an actual In accordance with or simulated initiation Signal. the Surveillance frequency Control Program SR 3.6.4.3.4 Verify each SGT filter cooling bypass In accordance with damper can be opened and the fan the Surveillance started. frequency Control Program RIVER BEND 3.6-52 Amendment No. 8+, 168, 18:3
Fuel Building Ventilation System-Fuel Handling 3.6.4.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.7.1 Verify one fuel building ventilation charcoal In accordance with filtration subsystem in operation. the Surveillance Frequency Control Program SR 3.6.4.7.2 Operate each fuel building ventilation charcoal In accordance with filtration subsystem for ~ 15 continuous minutes the Surveillance with heaters operating. Frequency Control Program SR 3.6.4.7.3 Perform fuel building ventilation charcoal filtration In accordance with filter testing in accordance with the Ventilation the VFTP Filter Testing Program (VFTP).
SR 3.6.4.7.4 Verify each fuel building ventilation charcoal In accordance with filtration subsystem actuates on an actual or the Surveillance simulated initiation signal. Frequency Control Program SR 3.6.4.7.5 Verify each fuel building ventilation charcoal In accordance with filtration filter cooling bypass damper can be the Surveillance opened and the fan started. Frequency Control Program RIVER BEND 3.6-59 Amendment No. 84-, -ie8, .:t-8a
CRFA System 3.7.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F. Two CRFA subsystems F.1 Suspend movement of Immediately inoperable during recently irradiated fuel movement of recently assemblies in the primary irradiated fuel assemblies containment and fuel in the primary containment building .
or fuel building, or during OPDRVs.
F.2 Initiate action to suspend Immediately OPDRVs.
One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irradiated fuel assemblies in the primary containment or fuel building , or during OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 Operate each CRFA subsystem for ~ 15 continuous In accordance with minutes with the heaters operating . the Surveillance Frequency Control Program SR 3.7.2.2 Perform required CRFA filter testing in accordance In accordance with with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.2.3 Verify each CRFA subsystem actuates on an actual In accordance with or simulated initiation signal. the Surveillance Frequency Control Program (continued)
RIVER BEND 3.7-7 Amendment No. 81 11 Q 1a2 154
+99, -+eg, ~
DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is ~ 130.2 V on float In accordance with charge. the Surveillance Frequency Control Proaram SR 3.8.4.2 Verify no visible corrosion at battery terminals and In accordance with connectors. the Surveillance Frequency Control Program Verify battery connection resistance is
~ 1.5 E-4 ohm for inter-cell connections,
~ 1.5 E-4 ohm for inter-rack connections ,
~ 1.5 E-4 ohm for inter-tier connections, and
$ 1.5 E-4 ohm for term inal connections .
Verify the total resistance for battery inter-cell ,
inter-rack, inter-tier, and terminal connections combined is s 27.45 E-4 ohms.
SR 3.8.4.3 Verify battery cells, cell plates, and racks show no In accordance with visual indication of physical damage or abnormal the Surveillance deterioration . Frequency Control Proqram SR 3.8.4.4 Remove visible corrosion , and verify battery cell to In accordance with cell and terminal connections are coated with the Surveillance anti-corrosion material. Frequency Control Proqram SR 3.8.4.5 Verify battery connection resistance is In accordance with
~ 1.5 E-4 ohm for inter-cell connections, the Surveillance
~ 1.5 E-4 ohm for inter-rack connections, Frequency Control
$ 1.5 E-4 ohm for inter-tier connections, and Program
$ 1.5 E-4 ohm for terminal connections .
Verify the total resistance for battery inter-cell ,
inter-rack , inter-tier, and terminal connections combined is S 27.45 E-4 ohms.
RIVER BEND 3.8-25 Amendment No. 8+, +98, +3+