Letter Sequence RAI |
---|
CAC:MF9307, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs (Approved, Closed) EPID:L-2017-LLA-0211, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML17053B3932017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17054C2262017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WCAP-18083-NP, Rev 0, Westinghouse Revised Thermal Design Procedure Uncertainty Calculations. Project stage: Request ML17054C2292017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Responses to NRC RAIs on August 2013 Methodology Transition LAR Submittal Project stage: Response to RAI ML17054C2272017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Alternative Source Term, Rev 1 Project stage: Request ML17151A9972017-03-0909 March 2017 Wolf Creek Revision 30 to Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment, and Systems Project stage: Request WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses2017-03-22022 March 2017 Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17100A2662017-04-18018 April 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses Project stage: Acceptance Review ET 17-0011, Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses2017-05-0404 May 2017 Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17132A3632017-05-15015 May 2017 Acceptance of Requested Licensing Action License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses in Addition to Adopting of Alternative Source Term Project stage: Acceptance Review ML17136A3592017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/2016(CAW-16-4499), Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC Enclosure I of the Letter Dated 01/17/2017 Project stage: Withholding Request Acceptance ML17137A2862017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/16 (CAW-16-4500) Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC for Enclosure VI to the Letter Dated 1/17/17 Project stage: Withholding Request Acceptance ML17166A0382017-06-14014 June 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: RAI ET 17-0016, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses2017-07-13013 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Project stage: Response to RAI ML17265A0142017-09-21021 September 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Project stage: RAI ML17291A7102017-10-17017 October 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: RAI ET 17-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-10-18018 October 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Response to RAI ML17297B7972017-10-31031 October 2017 Request for Withholding Information from Public Disclosure (CAC No. MF9307; EPID L 2017-LLA-0211) Project stage: Withholding Request Acceptance ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Response to RAI ML17331A1782017-12-0404 December 2017 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternate Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: RAI WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... Project stage: Response to RAI ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement L-2018-077, Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation2018-03-27027 March 2018 Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation Project stage: Request ML18114A1162018-04-19019 April 2018 SAP-18-34, Supplemental 30 Day Responses to NRC Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies. Project stage: Supplement ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18115A3522018-05-0303 May 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated April 16, 2018 Supplemental 30 Day Responses to NRC RAI WCGS Transition to Westinghouse Safety AST Methodolgies Project stage: RAI ML18107A7562018-05-0303 May 2018 Regulatory Audit Summary License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term (CAC MF9307; EPID L-2017-LLA-0211) Project stage: Other ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18183A5832018-07-23023 July 2018 Request for Withholding Information from Public Disclosure - 6/18/18 Affidavit Executed by Edmond J. Mercier, Westinghouse Electric Company Adoption of AST Amendment Request(Cac No. MF9307; EPID L-2017-LLA-0211) Project stage: Withholding Request Acceptance WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-08-0909 August 2018 Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18270A0942018-10-0404 October 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Methodology for Selected Accident and Transient Analyses Project stage: RAI ML18332A1772018-10-25025 October 2018 Email Slides for 10/30 Public Meeting Project stage: Request ML18313A2252018-10-25025 October 2018 Westinghouse Affidavit CAW-18-4828 - Application for Withholding Proprietary Information from Public Disclosure Project stage: Request ML18299A0492018-10-30030 October 2018 Accident Analyses Methodology Transition LAR Public Meeting Project stage: Meeting ML18304A1052018-11-0505 November 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses and Alternative Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: RAI WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Response to RAI WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Request ML18313A2542018-11-16016 November 2018 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses for Wolf Creek Generating Station Project stage: Meeting ML18327A1342018-11-30030 November 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated October 25, 2018, Executed by Mr. Paul A. Russ, Westinghouse (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: Withholding Request Acceptance ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18360A0342018-12-21021 December 2018 NRR E-mail Capture - Review Schedule for Wolf Creek Generating Station License Amend Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Other ML19070A1162019-03-0505 March 2019 Westinghouse, Responses to NRC Request for Additional Information Documented in ADAMS Accession No. ML 18270A094 on the Core Design and Safety Analyses Methodology Transition Program Project stage: Response to RAI ML19070A1392019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. Project stage: Request ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. Project stage: Response to RAI ML19099A1772019-04-16016 April 2019 Request for Withholding Information from Public Disclosure, 2/13/19 Affidavit Executed by Stephen Rigby, Westinghouse Electric Company LLC RAI Response Related to Adoption of Alternative Source Term (CAC MF9307; EPID L-2017-LLA-0211) Project stage: RAI ML19100A1222019-05-31031 May 2019 Issuance of Amendment No. 221 License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Approval 2018-10-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:Proprietary Information Review
MONTHYEARML19099A1772019-04-16016 April 2019 Request for Withholding Information from Public Disclosure, 2/13/19 Affidavit Executed by Stephen Rigby, Westinghouse Electric Company LLC RAI Response Related to Adoption of Alternative Source Term (CAC MF9307; EPID L-2017-LLA-0211) ML18327A1342018-11-30030 November 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated October 25, 2018, Executed by Mr. Paul A. Russ, Westinghouse (CAC No. MF9307; EPID L-2017-LLA-0211) ML18313A2252018-10-25025 October 2018 Westinghouse Affidavit CAW-18-4828 - Application for Withholding Proprietary Information from Public Disclosure ML18183A5832018-07-23023 July 2018 Request for Withholding Information from Public Disclosure - 6/18/18 Affidavit Executed by Edmond J. Mercier, Westinghouse Electric Company Adoption of AST Amendment Request(Cac No. MF9307; EPID L-2017-LLA-0211) ML17297B7972017-10-31031 October 2017 Request for Withholding Information from Public Disclosure (CAC No. MF9307; EPID L 2017-LLA-0211) ML17136A3592017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/2016(CAW-16-4499), Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC Enclosure I of the Letter Dated 01/17/2017 ML17137A2862017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/16 (CAW-16-4500) Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC for Enclosure VI to the Letter Dated 1/17/17 ML16154A8542016-06-20020 June 2016 Request for Withholding Information from Public Disclosure - 8/20/1990, 2/1/1991, and 3/11/1992 Affidavits Executed by F. Rhodes, Wolf Creek Nuclear Operating Company, Three WCNOC Topical Reports ML15076A3132015-03-18018 March 2015 Request for Withholding Information from Public Disclosure - 1/15/2015 Affidavit Executed by J. Gresham, Westinghouse, Two Attachments to LTR-LIST-15-11, Revision 1 ML14182A3762014-07-14014 July 2014 Request for Withholding from Public Disclosure - 1/21/14 Affidavit Executed by J. Gresham, Westinghouse LTR-LIS-13-557P-Attachment, Revision 0 Provided as Enclosure 1 to 2/26/14 License Amendment Request ML14070A0622014-03-14014 March 2014 Request for Withholding Information from Public Disclosure - 2/14/14 Affidavit Executed by J. Gresham, Westinghouse SAP-14-27-P Attachment ML14056A1162014-03-0505 March 2014 Request for Withholding Information from Public Disclosure - 8/9/2013 Affidavit Executed by J. Gresham, Westinghouse WCAP-17446-P, Revision 0, and WCAP-17602, Revision 0 ML12142A2512012-06-0505 June 2012 Request for Withholding Information from Public Disclosure, 2/22/2012 Affidavit Executed by J. Gresham, Westinghouse, LTR-SGMMP-11-28, Revision 1 ML1034706072011-01-10010 January 2011 Request for Withholding Information from Public Disclosure, 11/5/2010 Affidavit Executed by J. Gresham, Westinghouse, Re WCAP-17330-P ML0926703602009-10-16016 October 2009 Request for Withholding Information from Public Disclosure ML0925102942009-09-25025 September 2009 Request for Withholding Information from Public Disclosure ML0903406802009-02-0909 February 2009 Request for Withholding Information from Public Disclosure, Affidavit Executed by Steen Sorenson, CS Innovations LLC ML0809802352008-08-18018 August 2008 Request for Withholding Information from Public Disclosure, Three Proprietary Documents, Affidavit Dated July 29, 2008, Executed by S. Sorenson, CS Innovations, LLC ML0809802612008-06-23023 June 2008 Wolf Creek,Request for Withholding Information from Public Disclosure in Als Architecture Evaluation and Sfis D3 Assessment Submitted February 28, 2008 ML0809801342008-04-16016 April 2008 Withholding from Public Disclosure, CS Innovations, 6101-00007, Msfis Instruction, Operation, and Maintenance Manual, Revision 1, Submitted March 14, 2008 ML0808600062008-04-0303 April 2008 Request for Withholding Information from Public Disclosure for Topical Report, LTR-CDME-08-43-P, Submitted in Licensee'S Letter Dated 03/21/08 ML0804500102008-02-29029 February 2008 Request for Withholding Information from Public Disclosure (1/7/2008 Affidavit Executed by J. A. Gresham, Westinghouse Electric Company LLC) (Tac MD4840) ML0804500042008-02-29029 February 2008 Request for Withholding Information from Public Disclosure (10/8/2008 Affidavit Executed by J. A. Gresham, Westinghouse Electric Company LLC) (Tac No. MD4840) ML0804300062008-02-27027 February 2008 Request for Withholding Information from Public Disclosure, 01/11/2008 Affidavit Executed by J. A. Gresham, Westinghouse Electric Company LLC ML0804300152008-02-27027 February 2008 Request for Withholding Information from Public Disclosure (2/1/2008 Affidavit Executed by J. A. Gresham, Westinghouse Electric Company LLC) (Tac No. MD8054) ML0725502682007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted June 15, 2007, for Wolf Creek Generating Station ML0725502012007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted April 18, 2007, for Wolf Creek Generating Station (Tac No. MD4839) ML0725503102007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Report Submitted August 31, 2007 ML0725502832007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Documents Submitted June 15, 2007, for Wolf Creek Generating Station ML0724201352007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in Three CS Innovations Topical Reports Submitted April 18, 2007 for Wolf Creek Generating Station ML0724200172007-09-11011 September 2007 Request for Withholding Information from Public Disclosure in CS Innovations Topical Report 9100-00003-P for the Wolf Creek Generating Station ML0609001572006-04-10010 April 2006 Withholding from Public Disclosure, LTR-CDME-05-209-P, MD0197 ML0410602032004-04-14014 April 2004 Request for Withholding Information from Public Disclosure for the Wolf Creek Generating Station and the Callaway Plant, Unit 1 2019-04-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 16, 2019 Mr. Adam C. Heflin President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, KS 66839
SUBJECT:
WOLF CREEK GENERATING STATION, UNIT 1-REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. MF9307; EPID L-2017-LLA-0211)
Dear Mr. Heflin:
By letter dated March 5, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19070A115), Wolf Creek Nuclear Operating Corporation (the licensee) submitted an affidavit dated February 13, 2019 (CAW-19-4862), to the U.S. Nuclear Regulatory Commission (NRC), executed by Mr. Stephen P. Rigby, Director, Windsor Operations, Westinghouse Electric Company LLC, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Westinghouse Responses to NRC Request for Additional Information Documented in ADAMS Accession No. ML18270A094 on the Core Design and Safety Analyses Methodology Transition Program [Proprietary]
A non proprietary version of this document has been placed in the NRC's Public Document Room and added to the NRC Library in ADAMS at ADAMS Accession No. ML19070A116.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
A. Heflin Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at 301-415-3016 or via e-mail at Balwant.Singal@nrc.gov.
Sincerely,
~~\Q91¥-
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482 cc: Stephen P. Rigby Director, Windsor Operations Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 Listserv
ML19099A177 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL2-1/LAit NRR/DORL/LPL4/LA NAME BSingal KZeleznock PBlechman (JBurkhardt for)
DATE 04/16/19 04/12/19 04/15/19
!OFFICE NRR/DSS/SRXB/BC NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME JWhitman RPascarelli BSingal DATE 04/16/19 04/16/19 04/16/19