Notification of Potential Part 21 Report for Safety Hazard on Speed Switch Installed on Emergency Diesel Generator (EDG)
ML110110359
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/07/2011
From: Dedolph D
Fairbanks Morse Engine
To:
Office of Nuclear Reactor Regulation, NRC Region 1
References
46523
Download: ML110110359 (6)


Text

0110712011 U.S. Nuclear Regulatory Commission Operations Center Event Report Page I Part 21 (PAR) Event# 46523 Rep Org: FAIRBANKS MORSE ENGINE Notification Date /Time: 01/07/2011 17:13 (EST)

Supplier: FAIRBANKS MORSE ENGINE Event Date I Time: 11/16/2010 (CST)

Last Modification: 01/07/2011 Region: 3 Docket #:

City: BELOIT Agreement State: Yes County: License #:

State: WI NRC Notified by: DOMINIC DEDOLPH Notifications: NEIL PERRY R1DO HQ Ops Officer: JOE O'HARA PART 21 GRP Emergency Class: NON EMERGENCY 10 CFR Section:

21.21 UNSPECIFIED PARAGRAPH PART 21 REPORT FOR POTENTIAL SAFETY HAZARD ON SPEED SWITCH INSTALLED ON EMERGENCY DIESEL GENERATOR (EDG)

The following was received via fax:

"[Fairbanks Morse (FM) determined] that when the speed switch assembly was mounted on a conductive surface, the voltage regulator grounded out the 24 volt direct current power through the heat sink preventing the speed switch from operating.

"This condition was not detected prior to the first speed switch being shipped to Hope Creek in September, 2010.

It was never installed on the EDG prior to being recalled. The unit was returned to FM and has since been reworked and verified to be in compliance with the latest design to eliminate the deficiency."

i3iff, 67

Jan, 7. 2011 4 1 3PM F.Irb~anks Mvrsp Engine No, 0374 P. I FAIRBANKS MORSE in ,nPro ondu.ific,<omy FM Notification Report Serial Number 10-05 Fairbanksý Morse Engine 10CFR 21.21 (d)(3)(ii) Notification (i)Name and address of the Individual or individuals informing the Commission, Mr. Dominic Dedoiph Manager, Quality Assurance Fairbanks Morse-,Engine 701 White Avenue Beloit, WI 53511 (il)Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.

Facility: PSE&G (Hope Creek)

Basic component which fails to comply or contains a defect:

Electronic Speed Switch (FM P/N 11916260)

The electronic speed switch 11916260', is only used in the engine control cabinet for PSE&G (Hope Creek). The electronic speed switch:is used to detect when the engine is running at or above various speeds ihat are important to the management of the emergency diesel generator (EDOG), particularly during its starting process. For Hope Creek it contains four relay outputs that are used for various control functions.

(iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.

Fairbanks Morse Engine 701 White Avenue Beloit, WI 53511 (lv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.

Nature of defect:

Fairbanks Morse '(FM) evaluation has determined that a potential safety hazard existed for the original FMP/N 11916260 created from FM PIN P12620666 rev 0 that was delivered to Hope Creek. Subsequent to shipment to Hope Creek, additional testing found that when the speed switch assembly was mounted on a conductive surface, the voltage regulator grounded out the 24 vdc power through the heat sink preventing the speed switch from operalingi FM form BF5548 page Iýdf 5

Jan. 7. 201 4:13PM Fa.irbanks Mrse Eng ine No. 0374 F. 2 FAIRBANKS MORSE EQ an. tnoo°dus*,iw*mPny FM Notification Report Serial Number 10-05 Fairbanks Morse Engine 10CFR 21.21 (d)(3)(ii) Notification By adding an insulator kit, the speed switch circuit was isolated from ground and verified as functional. The FM initial design of the speed switch did not include the insulator kit (non-conductive washers) that would electrically isolate the voltage regulator from the heat sink and thus the metal mounting surface.

This condition was not detected prior to shipment of the first speed switch assembly due to the following:

1. Inspection / functional testing at FM was performed on a wooden / non-conductive bench top which did not short the circuit.
2. The FM test plan, Critical Characteristic Verification (CCV) sheet, did not identify circuit isolation from ground as a critical characteristic requiring inspection.

Safety hazard which could be created by such defect:

The speed switch provides the following functions, through four relays [crank rotation relay (CRR-40 rpm), air start relay (ASR-95 rpm), low speed relay (LSR-125 rpm), and high speed relay (HSR-365 rpm)) operated by the speed switch (abbreviated summary of functions):

1. CRR - Annunciate whether the engine attempted to start, or did not even crank over in the process of starting
2. ASR - Turn off the air supply to the engine starting system
3. LSR - Initiate field flashing, turn off keep warm systems and other miscellaneous non-essential systems and enable service water to engine coolers
4. HSR - Backup LSR and enable alarm/shutdown circuits It should be noted that some HSR functions are backed up by a pressure switch.

However, the pressure switch actuation time may not initiate field flashing quick enough to achieve 4160V within 10 seconds. All other functions are not time critical.

(v) The date on which the Information of such defect or failure to comply was obtained.

Deviation discovered on November 16, 2010 Evaluation completed on January. 5, 2011 FM form BF5548 Page 2 of 5

Jan. 7. 2011 4:13PM Fa. Irba nks Morse Engine No, 0374 P. 3 FAIRBANKS MORSE an EnProIndustries company FM Notification Report Serial Number 10-05 Fairbanks Morse Engine I0CFR 21.21 (d)(3)(ii) Notification (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of all such components In use at, supplied for, or being supplied for one or more facilities or activities subject to the regulations in this part, One speed switch assembly of 11916260 created from P12620666 rev Owith the defect was shipped to Hope Creek in September 2010. It was never installed on the EDG prior to being recalled by FM. This unit was returned to FM in November under RMA #

10008120 and has since been reworked and verified to be in compliance with the latest design 11916260 created from P12620666 rev I to eliminate the deficiency.

(vil) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.

The one affected unit 11916260-created from P12620666 rev 0 was recalled and modified by adding an insulator kit (item 23) between the voltage regulator (item 8) and the heat sink (item 7) asshown in Figure 1. The design records have been updated accordingly. The.assembly drawing, P12620666, and engineering bill of material have been updated. In addition the inspection plans for this part have been updated to include a circuit isolation check to confirm thatthe case of the voltage regulator is electrically isolated from the aluminum brackets, The inspectors have been trained in how to perform these checks.

FM form BF5548 Page 3 of 5

7. 2011 2Jn, 4:13PM Fai r:,banks Morse Engine Nc, 0374 P., 4 FAIRBANKS MORS Q at) ,,Pfo,,kdu .,,py. FM Notification Report[Serial Number 10-05 Fairbanks Morse Engine 10CFR 21.21 (d)(3)(ii) Notification FM form BF5548 Page 4 of 5

,.an. 7. 2011 4:1'3PM n.k. Morsel Engi ne F.irýKba.b No,.0374 P. 5 FAIRBANKS MORSE j A-)EfPn.~oivsisecompany FM Notification Report Serial Number 10-05 Fairbanks Morse Engine 10CFR 21.21 (d)(3)(ii) Notification (viii) Any advice related to the defector failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

The one affected unit 11916260 created from P12620666 rev 0 was recalled and ithas been reworked to 11916260 created from P12620666 rev 1. No additional notifications are required.

FM form BF5548 Page 5 of 5