ML060620476
From kanterella
Jump to navigation
Jump to search
ML060620476 | |
Person / Time | |
---|---|
Site: | Browns Ferry, Watts Bar, Sequoyah, Bellefonte |
Issue date: | 02/28/2006 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML060620468 | List: |
References | |
Download: ML060620476 (26) | |
Category:Meeting Agenda
MONTHYEARPMNS20240067, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Delete Surveillance Requirement 3.8.1.8 from the Technical Specifications2024-02-0606 February 2024
[Table view]Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Delete Surveillance Requirement 3.8.1.8 from the Technical Specifications PMNS20240113, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Revise the Fuel Handling Accident Analysis and Outage Related Fuel Decay Time2024-02-0202 February 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Revise the Fuel Handling Accident Analysis and Outage Related Fuel Decay Time PMNS20240088, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications2024-01-30030 January 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications PMNS20240078, Meeting with Tennessee Valley Authority to Discuss a Future License Amendment Request to Revise the Final Safety Analysis Report Regarding the Hydrologic Analysis for the Browns Ferry Nuclear Plant2024-01-24024 January 2024 Meeting with Tennessee Valley Authority to Discuss a Future License Amendment Request to Revise the Final Safety Analysis Report Regarding the Hydrologic Analysis for the Browns Ferry Nuclear Plant PMNS20240028, Meeting with Tennessee Valley Authority to Discuss Proposed Use of the Risk-Informed Process for Evaluations (RIPE) for an Upcoming License Amendment Request for the Browns Ferry Nuclear Plant2024-01-12012 January 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Use of the Risk-Informed Process for Evaluations (RIPE) for an Upcoming License Amendment Request for the Browns Ferry Nuclear Plant ML23345A1662023-12-13013 December 2023 Tennessee Valley Authority - Pre-submittal Meeting for Conversion of Nuclear Quality Assurance Plan from ANSI N45.2-1971 to ASME NQA-1-2015 (EPID L-2023-LRM-0103) - Slides PMNS20231329, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-11-28028 November 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20231126, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 22023-10-18018 October 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides PMNS20231024, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-09-18018 September 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230966, Pre-Application SLRA Meeting with TVA for Browns Ferry Cathodic Protection2023-09-11011 September 2023 Pre-Application SLRA Meeting with TVA for Browns Ferry Cathodic Protection PMNS20230916, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-08-31031 August 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs PMNS20230795, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-06-30030 June 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230712, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-06-12012 June 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants ML23130A0922023-05-11011 May 2023 NRC Browns Ferry Nuclear Plant, Units 1, 2, and 3, Subsequent License Renewal Application, Public Meeting Slides ML23130A0912023-05-11011 May 2023 TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 PMNS20230570, Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Environmental2023-05-10010 May 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Environmental PMNS20230568, Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Bfnp) - Safety2023-05-10010 May 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Bfnp) - Safety PMNS20230549, Annual Assessment Virtual Meeting for the 2022 Assessment Period2023-04-25025 April 2023 Annual Assessment Virtual Meeting for the 2022 Assessment Period PMNS20230446, Annual Assessment Public Poster Session and Openhouse Meeting2023-04-17017 April 2023 Annual Assessment Public Poster Session and Openhouse Meeting ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) PMNS20230127, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods2023-02-13013 February 2023 Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods ML23025A0472023-01-25025 January 2023 Pre-Submittal Meeting for Proposed License Amendment Request Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves - January 25, 2023 PMNS20230053, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 32023-01-18018 January 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20221292, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2023-01-11011 January 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation PMNS20221152, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 22022-11-0303 November 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 ML22285A1902022-10-13013 October 2022 October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides PMNS20221018, Meeting with the Tennessee Valley Authority to Discuss Proposed Alternative Requests for the Browns Ferry Nuclear Plant2022-10-12012 October 2022 Meeting with the Tennessee Valley Authority to Discuss Proposed Alternative Requests for the Browns Ferry Nuclear Plant ML22277A6562022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October, 2022 (TVA Slides) PMNS20220991, Meeting with Tennessee Valley Authority to Discuss Severe Accident Mitigation Alternatives Analysis for the Browns Ferry Nuclear Plant, Subsequent License Renewal Application2022-10-0606 October 2022 Meeting with Tennessee Valley Authority to Discuss Severe Accident Mitigation Alternatives Analysis for the Browns Ferry Nuclear Plant, Subsequent License Renewal Application ML22264A2332022-09-22022 September 2022 Slides for Pre-Submittal Meeting for Request to Use a Later Edition of the ASME OM Code for the Fifth Inservice Testing (IST) 10-Year Interval PMNS20220953, Meeting with Tennessee Valley Authority to Discuss Proposed Alternative Request for Browns Ferry Nuclear Plant2022-09-21021 September 2022 Meeting with Tennessee Valley Authority to Discuss Proposed Alternative Request for Browns Ferry Nuclear Plant PMNS20220956, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2022-09-20020 September 2022 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML22201A0292022-07-20020 July 2022 Pre-Submittal Teleconference Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request for Sequoyah Nuclear Plant, Unit 1 PMNS20220531, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants2022-05-19019 May 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220379, Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 22022-04-0808 April 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 PMNS20220314, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants2022-03-31031 March 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220312, Meeting with Tennessee Valley Authority to Discuss the Criticality Analysis License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 32022-03-31031 March 2022 Meeting with Tennessee Valley Authority to Discuss the Criticality Analysis License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20220285, Annual Assessment Meeting2022-03-29029 March 2022 Annual Assessment Meeting PMNS20220206, Meeting with Tennessee Valley Authority Regarding Framatome Advanced Methodologies for the Browns Ferry Atrium 11 Fuel Transition License Amendment Request2022-03-0707 March 2022 Meeting with Tennessee Valley Authority Regarding Framatome Advanced Methodologies for the Browns Ferry Atrium 11 Fuel Transition License Amendment Request PMNS20220079, Public Meeting with the Tennessee Valley Authority (TVA)2022-02-0404 February 2022 Public Meeting with the Tennessee Valley Authority (TVA) PMNS20211575, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request2022-01-18018 January 2022 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request PMNS20211571, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods2022-01-0606 January 2022 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods PMNS20211507, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal2021-12-0101 December 2021 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal PMNS20211347, Notice of Meeting with the Tennessee Valley Authority (TVA) Regarding a Potential Future Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request for Modifications to the Approved 10 CFR 50.69 Categorization Process2021-10-27027 October 2021 Notice of Meeting with the Tennessee Valley Authority (TVA) Regarding a Potential Future Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request for Modifications to the Approved 10 CFR 50.69 Categorization Process ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) PMNS20211308, Notice of Meeting with the Tennessee Valley Authority (TVA) Regarding a Potential Future Sequoyah Nuclear Plant Unit 2 Alternative Method for the Repair of a through-wall Defect in a Reactor Coolant Pump2021-10-0606 October 2021 Notice of Meeting with the Tennessee Valley Authority (TVA) Regarding a Potential Future Sequoyah Nuclear Plant Unit 2 Alternative Method for the Repair of a through-wall Defect in a Reactor Coolant Pump 2024-02-06 Category:Meeting Briefing Package/Handouts MONTHYEARML24037A0252024-02-0808 February 2024
[Table view]Pre-Submittal Presentation - 02/08/2024 - Proposed License Amendment Request Change to the Sequoyah Nuclear Plant Technical Specifications 3.8.1 and 3.8.2 ML24032A2752024-02-0707 February 2024 Pre-Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates (Slides) ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML23345A1662023-12-13013 December 2023 Tennessee Valley Authority - Pre-submittal Meeting for Conversion of Nuclear Quality Assurance Plan from ANSI N45.2-1971 to ASME NQA-1-2015 (EPID L-2023-LRM-0103) - Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23130A0922023-05-11011 May 2023 NRC Browns Ferry Nuclear Plant, Units 1, 2, and 3, Subsequent License Renewal Application, Public Meeting Slides ML23130A0912023-05-11011 May 2023 TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23025A0472023-01-25025 January 2023 Pre-Submittal Meeting for Proposed License Amendment Request Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves - January 25, 2023 ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22285A1902022-10-13013 October 2022 October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides ML22277A6562022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October, 2022 (TVA Slides) ML22279A8992022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October 6, 2022-TVA Slides ML22264A2332022-09-22022 September 2022 Slides for Pre-Submittal Meeting for Request to Use a Later Edition of the ASME OM Code for the Fifth Inservice Testing (IST) 10-Year Interval ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21308A4932021-11-0808 November 2021 Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides) ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21270A0322021-09-27027 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting September 27, 2021 ML21265A0422021-09-21021 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting 09/22/2021 ML21252A3632021-09-15015 September 2021 Pre-Submittal Meeting for License Amendment Request to Eliminate the High Negative Flux Rate Trip ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21250A3012021-09-0707 September 2021 TVA Slides for September 7, 2021, Presubmittal Meeting to Discuss Planned Browns Ferry TSTF-505 License Amendment Request ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21152A1872021-06-0101 June 2021 TVA Slides for June 1, 2021, Presubmittal Meeting to Discuss Planned Control Bay Chiller Cross-Tie License Amendment Request ML21117A0722021-04-27027 April 2021 Meeting Slides for April 28, 2021 Meeting with TVA ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21061A0892021-03-0202 March 2021 TVA Presentation Slides for March 2, 2021, Public Meeting to Discuss Sequoyah Alternative Request ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML20345A0262020-12-10010 December 2020 Replacement Steam Generator Project Planned License Amendment Request (Lars). LAR Descriptions and Submittal Schedule Meeting Slides ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML24019A1322020-11-0909 November 2020 ANP-3874NP, Revision 1, Browns Ferry Atrium 11 Control Rod Drop Accident Analysis with the AURORA-B CRDA ML20302A1232020-10-28028 October 2020 Pre-Submittal Meeting Slides Non-Voluntary Application to Modify WBN Unit 1 and Unit 2 TS Surveillance Requirement 3.6.15.4, Shield Building ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20196L6892020-07-16016 July 2020 TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20196L7922020-07-16016 July 2020 Corrected TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20203M0572020-07-16016 July 2020 Updated TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20163A6952020-06-12012 June 2020 Bpg Presentation on TVA SCWE Final 2 2024-02-08 Category:Organization Chart MONTHYEARML23130A0912023-05-11011 May 2023
[Table view]TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 CNL-22-019, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Reduction in Commitment2022-02-0404 February 2022 Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Reduction in Commitment ML0606204762006-02-28028 February 2006 Public Meeting Summary - Meeting Category 1 - TVA Nuclear Facilities. Enclosure 2 - Meeting Slides ML0425403412004-09-0909 September 2004 Meeting Handout on Browns Ferry Unit 1 Status ML0217607222002-02-20020 February 2002 TVA Nuclear Corporate 1996 Re-Organization Chart 2023-05-11 Category:Slides and Viewgraphs MONTHYEARML24037A0252024-02-0808 February 2024
[Table view]Pre-Submittal Presentation - 02/08/2024 - Proposed License Amendment Request Change to the Sequoyah Nuclear Plant Technical Specifications 3.8.1 and 3.8.2 ML24032A2752024-02-0707 February 2024 Pre-Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates (Slides) ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML23345A1662023-12-13013 December 2023 Tennessee Valley Authority - Pre-submittal Meeting for Conversion of Nuclear Quality Assurance Plan from ANSI N45.2-1971 to ASME NQA-1-2015 (EPID L-2023-LRM-0103) - Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23130A0922023-05-11011 May 2023 NRC Browns Ferry Nuclear Plant, Units 1, 2, and 3, Subsequent License Renewal Application, Public Meeting Slides ML23130A0332023-05-11011 May 2023 NRC Presentation Browns Ferry Subsequent License Renewal Pre-application Meeting, Environmental Overview ML23130A0912023-05-11011 May 2023 TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 ML23130A0302023-05-10010 May 2023 TVA Presentation Browns Ferry Nuclear Plant Subsequent License Renewal License Application Environmental Report ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23025A0472023-01-25025 January 2023 Pre-Submittal Meeting for Proposed License Amendment Request Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves - January 25, 2023 ML23010A2542023-01-12012 January 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension -- Meeting Slides ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22285A1902022-10-13013 October 2022 October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides ML22277A6562022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October, 2022 (TVA Slides) ML22279A8992022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October 6, 2022-TVA Slides ML22264A2332022-09-22022 September 2022 Slides for Pre-Submittal Meeting for Request to Use a Later Edition of the ASME OM Code for the Fifth Inservice Testing (IST) 10-Year Interval ML22201A1262022-07-20020 July 2022 July 20, 2022 - Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Centrifugal Charging Pump 1B-B Testing Per ISTB-3310 (RP-12) ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 and Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22046A2932022-02-15015 February 2022 Pre-submittal Meeting Presentation - Request for Alternative to ASME OM Code ISTC-3630 Regarding Leakage of Pressure Isolation Valves ML22035A0002022-02-0404 February 2022 February 8, 2022, Pre-Submittal Meeting Slides Regarding Proposed Change to Modify the Allowable Value for Technical Specification Table 3.3.2-1, Function 6.e(1) ML22013A6432022-01-19019 January 2022 TVA Slides - Watts Bar Nuclear Plant (WBN) Schedule for the Development of a License Amendment Request (LAR) for Increased Tritium Production at WBN ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21308A4932021-11-0808 November 2021 Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides) ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21270A0322021-09-27027 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting September 27, 2021 ML21265A0422021-09-21021 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting 09/22/2021 ML21252A3632021-09-15015 September 2021 Pre-Submittal Meeting for License Amendment Request to Eliminate the High Negative Flux Rate Trip ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21250A3012021-09-0707 September 2021 TVA Slides for September 7, 2021, Presubmittal Meeting to Discuss Planned Browns Ferry TSTF-505 License Amendment Request ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21197A0022021-08-0505 August 2021 N-769-6 Relief Pre-Submittal TVA Presentation August 2021 ML21152A1872021-06-0101 June 2021 TVA Slides for June 1, 2021, Presubmittal Meeting to Discuss Planned Control Bay Chiller Cross-Tie License Amendment Request ML21111A0202021-04-21021 April 2021 TVA Slides for April 21, 2021 Public Meeting to Discuss Planned Sequoyah Amendment Request ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21096A1002021-04-0606 April 2021 Annual Assessments ML21061A0892021-03-0202 March 2021 TVA Presentation Slides for March 2, 2021, Public Meeting to Discuss Sequoyah Alternative Request ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA 2024-02-08 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML060620476&oldid=1154709"