Meeting Handout on Browns Ferry Unit 1 Status
ML042540341
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/09/2004
From: Rupert J
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML042540341 (21)


Text

(7.1 C7--Li 7 :7 vx- u~:r:- rz r r 7 1. i.-

r-77

[7 Err-r ma TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT L

- ~

_________________________ I' F

._:d_ __ _ _ _ ____ __ ______ ._ ___;___t_______.-..'__ "z"'^;'

,,_ -b ___s

_ Sgg.,. @>.*A 14I t-ib r .5.-25.5H0 O%5A.5;,.5n:' ~ '

r I I- U--- ' -- I- F- -' F - F--- Fv U-w

- I-* ' F1- (---' U- [-

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNIT 1 STATUS Rockville, Md.

September 9, 2004

I ~II - F- I FI I - -- F- (U ( F- I( , I, Fr - ---

F--

Agenda

  • Introduction J. Rupert
  • Unit 1 Organizational Changes J. Rupert
  • Regulatory Status T. Abney
  • Unit 1 Overview and Schedule J. Rupert J. Valente R. Drake
  • Operations R.G. Jones
  • Nuclear Assurance R. Baron
  • Open Discussion Jon Rupert 2

I V F- - I- r--- r(---

F --- Fr- F-,-- I--- [--~-

Introduction

  • Welcome to the Fourth Periodic Status Meeting for the Unit 1 restart project
  • Purpose

- Status of project

- Upcoming activities

- Solicit feedback J. Rupert 3

( [r[ I - I -.- r--- --- I r- - I' - 1 -

(- ( -- lI--- -

Unit 1 Organizational Changes TVAN TVAN Nucfear Licensing Assurance Manager General Manager

,I Igil Nuclear Licensing Assurance Manager Manager Tim Abney Raul Baron Changes highlighted.

Jon Rupert 4

( *. [-- F- - (-- F- F-- f - -- F- - f-- (,--, (,-, - I' --- (---, ( - ( - - F--- r--

Regulatory Status

  • Unit 1 License Amendments

- 20 amendments identified

- 17 of the 20 have or will have been previously submitted and/or approved on Units 2 and 3

- 12 submitted to date o Includes Extended Power Uprate - submitted June 28, 2004

- 1 approved by NRC

  • Relief Requests

- 5 relief requests submitted

- 4 approved by NRC

- Risk informed ISI to be submitted

- Other relief requests may be identified as a result of inspections

- Submitted December 31, 2003 Tim Abney 5

I 1 1 1 1 1 I I I 1 I 1 1 1 1 1 1 Regulatory Status Status of Technical Specifications and Relief Requests 30 25 -I-z0(

O X 20 a u rL a o w NA Xus~ 15 ELn U.

X U) .

04

_ a 10 I Z

.4 5

0 r Z C- ° C- Z '° C- C- C- Z D)

CO - Z CD 0 Cw w £ D 00C ~ g . C

  • 7o *76
  • 76 6
  • 6 7*

O 6 0 CD co CD 6 0 0 o P~ o 6 0C 6 6 01 6 0 o o 0 o SUBMI-rAL DATE G Actual Number Remaining - - - - Scheduled

- NRC Approvals Remaining Tim Abney 6

'QC I

(--- - ( . - 1. F---- I --- a ri r--- I -- F-- U- ( rr [F rV ( U-- (

V t7--

F F Regulatory Status Other Unit 1 Submittals

- 82 programmatic and completion submittals identified

- From overall Regulatory Framework o Submitted December 2002 o Approved August 2003

- Agreed to notify NRC upon the completion of Bulletins, Generic Letters, TMI Action Plan Items, or Nuclear Performance Plan Special Programs

- 12 submitted to date

- None NRC approved Tim Abney 7

I I 1 1 1 I I I I I I I I I I Regulatory Status Status of Other Submittals 100 -

90 Oz 70 -

04 2 60- -- - - - -

E50 40 -

z co30-Lu 20 o

0 1 0

° ° 0- °> °000 ° °Z ° ° CD c C, 0 '

w

' a . 0 (c CD

. 0 I ° 0 C° Uc 0 z SUBMITTAL DATE

-Actual Number Remaining - - - - Scheduled

-~NRC Approvals Remaining Tim Abney 8 CO -z

F -- r r r- - -- F- ( 7

-, -- f (,--- , ( "--- r, - F , I- - [- F__

Unit 1 Overview and Schedule

  • Project Schedule (Attached)

- On schedule for start-up May 2007 Jon Rupert 9

(-

I I -(--

F r- - F--- I--- F__ I---- f-' f ____ f ' I [rF ( 77---- I- r-F r--

Unit 1 Overview and Schedule Engineering

- Current status o Design Change Notices issued o Overall 75 percent complete

- Ongoing activities o Primarily in a field support role o Closures o Completing System Plant Acceptance Evaluations (SPAE) and System Pre-operability Checklists (SPOCs)

- Extended Power Uprate Analyses o Steam dryer o Main steam lines o Vessel internals Joe Valente 11

( - F- - I( --l l f --- -- I--- Fr- - V

[--- (-

(-- 1[

Unit 1 Overview and Schedule

  • Modifications and Maintenance Status
  • Major Accomplishments

- Replaced o Drywell structural steel o Core Spray piping o Reactor Pressure Vessel safe ends o Condenser tubes o Turbine cross-over and cross-under piping o Extraction Steam piping o Flow assisted corrosion susceptible piping (Carbon steel with chrome-moly)

- RCIC turbine reassembly Rick Drake 12

(-- (- in-r [i --- -- a-- F-- I---- r--, ,F - [I , (__ I-Unit 1 Overview and Schedule Major Work In-progress

- Cable tray, conduit and support installation

- Large and small bore pipe replacement

- Pipe hanger installation

- Large pump and motor refurbishment

- Torus coating

- Control Room Design Review modifications

- Turbine generator rewind

- Main Bank transformers

  • Challenges

- Industrial safety

- Welding Rick Drake 13

I --- F --- (-,--- F--- ( [I--II--[-- ( I V (--- I r-Unit 1 Overview and Schedule

  • Status of Major Commodities COMMODITY INSTALLED TOTAL Piping - Large Bore 5, 948 feet 12,466 feet Hangers - Large Bore 524 1,586 Piping - Small Bore 2,527 feet 24,177 feet Hangers - Small Bore 755 5,461 Conduit 25,540 feet 152,187 feet Conduit Supports 3,984 16,251 Cable Tray 7,695 feet 9,101 feet Cable Tray Supports 1,310 1,430 Rick Drake 14

( __ - ( . - F_.__ C_ (___-, (,--- F____ I- I I -,- ( -,

Operations

  • Access Control

- Barriers

- Personnel identification

- Physical access accommodations

- Training

- Unit color codes

- Unit 1 equipment required for Unit 2/3 operation identified

- No trips or power reductions caused by Unit 1 work

  • Work Control

- Comprised of qualified and site experienced personnel

- Coordination with operating units Work Control and Operation

  • Completing System Pre-operability Checklists (SPOCs)

- Process flow chart attached R.G. Jones 15

F- - r - U-7 r--

F r--- r - ---- V-- I- -F_ r I ( --- V--- F77 U---

Operations

  • Preparing for Baseline, Restart and Power Ascension Test Programs
  • Operations Department

- Staffing / training to support three unit operations

- Adding a second simulator

  • Dose Reduction Activities

- Decontaminated Drywell, Reactor and Turbine Buildings

- Gamma scan to identify and system flushing to reduce hot spots

- Replacement of CRD and low pressure turbine blades and 77 other components containing stellite

- Electro-polish and chrome plate 17 valves and 2 RWCU pumps

- Electro-polish and pre-oxidize Recirc. and RWCU piping and RWCU regenerative heat exchangers R.G. Jones 17

(' -, Ir --

  • Ur-7 roC7--r~~ r-- [~- Fr--- F7--- [- - r - at- (7--- f- ( - I.- -.

Nuclear Assurance Shift in Emphasis

- Established and filled a new QA Manager position

- Increased QC staffing, including Level IIl technical support

- Established QC Level Ill oversight support

- QA staffing and skill set strengthened

- Dedicated resources to corrective action program oversight

  • Reinforced Expectations and Strengthened Approach

- Quality Assurance

- Quality Control Raul Baron 18

- I r-- - F -- ri - - -7 r-- - [a--- 1-- [--

-- ri- I- f'- rig--- r-- U---

Nuclear Assurance

  • Focus Areas

- Nuclear Performance Plan Special Programs (DBVP, seismic issues, electrical issues, etc.)

- Vendor performance / source surveillance

- Modification / Construction field activities

- SPAE/SPOC 19 Raul Baron

f ( -.-,- r I 7*~[ [

-~ F-- fl- V- F-- rF* r,-,- -- '

F--, F-Open Discussion 20