Category:Meeting Agenda
MONTHYEARML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement PMNS20241000, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-08-0606 August 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program PMNS20240831, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-06-24024 June 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program ML24149A1332024-05-29029 May 2024 Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates Public Portion Meeting Slides PMNS20240530, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Browns Ferry Nuclear Plant2024-05-0101 May 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Browns Ferry Nuclear Plant PMNS20240394, Environmental Scoping Meeting Related to the Browns Ferry Power Plant License Renewal Application2024-04-18018 April 2024 Environmental Scoping Meeting Related to the Browns Ferry Power Plant License Renewal Application PMNS20240393, Environmental Scoping Meeting Related to the Browns Ferry Power Plant License Renewal Application2024-04-11011 April 2024 Environmental Scoping Meeting Related to the Browns Ferry Power Plant License Renewal Application PMNS20240493, Meeting with Tennessee Valley Authority to Discuss Use of the Risk-Informed Process for Evaluations (RIPE) for a Proposed License Amendment Request for the Browns Ferry Nuclear Plant2024-04-10010 April 2024 Meeting with Tennessee Valley Authority to Discuss Use of the Risk-Informed Process for Evaluations (RIPE) for a Proposed License Amendment Request for the Browns Ferry Nuclear Plant PMNS20240350, Annual Assessment Virtual Public Meeting2024-03-11011 March 2024 Annual Assessment Virtual Public Meeting PMNS20240344, Annual Assessment Public Poster Session and Open House Meeting2024-03-0707 March 2024 Annual Assessment Public Poster Session and Open House Meeting PMNS20240078, Meeting with Tennessee Valley Authority to Discuss a Future License Amendment Request to Revise the Final Safety Analysis Report Regarding the Hydrologic Analysis for the Browns Ferry Nuclear Plant2024-01-24024 January 2024 Meeting with Tennessee Valley Authority to Discuss a Future License Amendment Request to Revise the Final Safety Analysis Report Regarding the Hydrologic Analysis for the Browns Ferry Nuclear Plant PMNS20240028, Meeting with Tennessee Valley Authority to Discuss Proposed Use of the Risk-Informed Process for Evaluations (RIPE) for an Upcoming License Amendment Request for the Browns Ferry Nuclear Plant2024-01-12012 January 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Use of the Risk-Informed Process for Evaluations (RIPE) for an Upcoming License Amendment Request for the Browns Ferry Nuclear Plant PMNS20231329, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-11-28028 November 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20230966, Pre-Application SLRA Meeting with TVA for Browns Ferry Cathodic Protection2023-09-11011 September 2023 Pre-Application SLRA Meeting with TVA for Browns Ferry Cathodic Protection PMNS20230712, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-06-12012 June 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants ML23130A0912023-05-11011 May 2023 TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 ML23130A0922023-05-11011 May 2023 NRC Browns Ferry Nuclear Plant, Units 1, 2, and 3, Subsequent License Renewal Application, Public Meeting Slides PMNS20230568, Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Bfnp) - Safety2023-05-10010 May 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Bfnp) - Safety PMNS20230570, Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Environmental2023-05-10010 May 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Environmental PMNS20230549, Annual Assessment Virtual Meeting for the 2022 Assessment Period2023-04-25025 April 2023 Annual Assessment Virtual Meeting for the 2022 Assessment Period PMNS20230446, Annual Assessment Public Poster Session and Openhouse Meeting2023-04-17017 April 2023 Annual Assessment Public Poster Session and Openhouse Meeting ML23025A0472023-01-25025 January 2023 Pre-Submittal Meeting for Proposed License Amendment Request Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves - January 25, 2023 PMNS20230053, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 32023-01-18018 January 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22285A1902022-10-13013 October 2022 October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides PMNS20221018, Meeting with the Tennessee Valley Authority to Discuss Proposed Alternative Requests for the Browns Ferry Nuclear Plant2022-10-12012 October 2022 Meeting with the Tennessee Valley Authority to Discuss Proposed Alternative Requests for the Browns Ferry Nuclear Plant ML22277A6562022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October, 2022 (TVA Slides) PMNS20220991, Meeting with Tennessee Valley Authority to Discuss Severe Accident Mitigation Alternatives Analysis for the Browns Ferry Nuclear Plant, Subsequent License Renewal Application2022-10-0606 October 2022 Meeting with Tennessee Valley Authority to Discuss Severe Accident Mitigation Alternatives Analysis for the Browns Ferry Nuclear Plant, Subsequent License Renewal Application ML22264A2332022-09-22022 September 2022 Slides for Pre-Submittal Meeting for Request to Use a Later Edition of the ASME OM Code for the Fifth Inservice Testing (IST) 10-Year Interval PMNS20220953, Meeting with Tennessee Valley Authority to Discuss Proposed Alternative Request for Browns Ferry Nuclear Plant2022-09-21021 September 2022 Meeting with Tennessee Valley Authority to Discuss Proposed Alternative Request for Browns Ferry Nuclear Plant PMNS20220312, Meeting with Tennessee Valley Authority to Discuss the Criticality Analysis License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 32022-03-31031 March 2022 Meeting with Tennessee Valley Authority to Discuss the Criticality Analysis License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20220285, Annual Assessment Meeting2022-03-29029 March 2022 Annual Assessment Meeting PMNS20220206, Meeting with Tennessee Valley Authority Regarding Framatome Advanced Methodologies for the Browns Ferry Atrium 11 Fuel Transition License Amendment Request2022-03-0707 March 2022 Meeting with Tennessee Valley Authority Regarding Framatome Advanced Methodologies for the Browns Ferry Atrium 11 Fuel Transition License Amendment Request ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21270A0322021-09-27027 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting September 27, 2021 ML21270A0492021-09-27027 September 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request to ASME Code Case N-526 for Browns Ferry Nuclear Plant, Unit 2 ML21265A1322021-09-22022 September 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20211154, Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request2021-09-21021 September 2021 Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request ML21265A0422021-09-21021 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting 09/22/2021 ML21256A1962021-09-13013 September 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request to ASME Code Case N-526 for Browns Ferry Nuclear Plant, Unit 2 ML21252A5352021-09-0909 September 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML21242A0582021-08-30030 August 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML21152A1872021-06-0101 June 2021 TVA Slides for June 1, 2021, Presubmittal Meeting to Discuss Planned Control Bay Chiller Cross-Tie License Amendment Request PMNS20210702, Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption2021-05-25025 May 2021 Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption ML21141A1152021-05-21021 May 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20210392, Annual Assessment Meeting2021-04-12012 April 2021 Annual Assessment Meeting ML20167A1202020-06-30030 June 2020 Public Meeting Notice - Notice of Predecisional Enforcement Conference (Pec) Between U.S. Nuclear Regulatory Commission (NRC) and Tennessee Valley Authority (TVA) (EA-20-006, EA-20-007) ML16356A0342017-01-0404 January 2017 Pre-app Meeting Mellla+ LAR Final ML16161A0642016-06-15015 June 2016 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority and Its Consultant, GEH, Regarding Steam Dryers Structural Adequacy for Browns Ferry Units 1, 2 & 3 Extended Power Uprate (EPU) License Amendment Request (LAR) ML15062A5402015-03-0303 March 2015 March 8, 2015, Rescheduled Forthcoming Closed Meeting with Tennessee Valley Authority Browns Ferry Nuclear Plant Main Steam Isolation Valve Leakage Rate License Amendment Request ML14076A0692014-03-17017 March 2014 Notice of Public Meeting with the TVA to Discuss TVA 2013 Synergy Safety Culture 2024-08-06
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24149A1332024-05-29029 May 2024 Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates Public Portion Meeting Slides ML24113A0962024-04-22022 April 2024 RIPE Pre-Submittal Meeting Slides ML24078A2722024-04-10010 April 2024 Subsequent License Renewal Public Scoping Meeting ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML24032A2752024-02-0707 February 2024 Pre-Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates (Slides) ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML23130A0912023-05-11011 May 2023 TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 ML23130A0922023-05-11011 May 2023 NRC Browns Ferry Nuclear Plant, Units 1, 2, and 3, Subsequent License Renewal Application, Public Meeting Slides ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23025A0472023-01-25025 January 2023 Pre-Submittal Meeting for Proposed License Amendment Request Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves - January 25, 2023 ML22285A1902022-10-13013 October 2022 October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides ML22277A6562022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October, 2022 (TVA Slides) ML22279A8992022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October 6, 2022-TVA Slides ML22264A2332022-09-22022 September 2022 Slides for Pre-Submittal Meeting for Request to Use a Later Edition of the ASME OM Code for the Fifth Inservice Testing (IST) 10-Year Interval ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21270A0322021-09-27027 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting September 27, 2021 ML21265A0422021-09-21021 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting 09/22/2021 ML21250A3012021-09-0707 September 2021 TVA Slides for September 7, 2021, Presubmittal Meeting to Discuss Planned Browns Ferry TSTF-505 License Amendment Request ML21152A1872021-06-0101 June 2021 TVA Slides for June 1, 2021, Presubmittal Meeting to Discuss Planned Control Bay Chiller Cross-Tie License Amendment Request ML24019A1322020-11-0909 November 2020 ANP-3874NP, Revision 1, Browns Ferry Atrium 11 Control Rod Drop Accident Analysis with the AURORA-B CRDA ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20156A2812020-06-0808 June 2020 TVA Slides for June 8, 2020, ATRIUM-11 Presubmittal Meeting ML20092F5742020-04-0202 April 2020 TVA Slides for Browns Ferry 50.69 License Amendment Request Presubmittal Meeting ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML24019A1482019-01-28028 January 2019 Surveillance Procedure 2-SR-3.1.6.1, BPWS Compliance Verification, Revision 006 ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18239A2522018-08-27027 August 2018 Proposed Changes to NFPA 805 License Conditions ML18158A2862018-06-0707 June 2018 May 30, 2018 Summary of Public Meeting with Browns Ferry Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status ML17212A8432017-08-0101 August 2017 Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants ML17034A3322017-02-0303 February 2017 Presentation Slides for Public Meeting Regarding Browns Ferry Extended Power Uprate License Amendment Request Transmission System Update Supplements ML16341A7422017-01-0404 January 2017 Presentation Slides for Browns Ferry Pre-application Meeting Regarding Mellla+ ML16356A0342017-01-0404 January 2017 Pre-app Meeting Mellla+ LAR Final ML16350A2962016-12-14014 December 2016 Enclosure 3- Reactor Oversight Process Task Force FAQ Log- November 16, 2016 ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16189A3482016-07-19019 July 2016 Presentation Slides for July 19, 2016, Public Meeting ML16200A2592016-07-19019 July 2016 July 19, 2016: NRC Public Meeting on Browns Ferry Nuclear Plant Extended Power Uprate License Amendment Request ML16028A0962016-02-0101 February 2016 Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal Logic, and Unit Priority Re-Trip Logic License Amendment Request ML15308A1002015-11-10010 November 2015 Public Meeting Presentation Slides Extended Power Uprate License Amendment Request NRC Public Meeting ML15195A1252015-07-14014 July 2015 July 14, 2015 - Public Meeting Slides on Browns Ferry Seismic Risk Insights ML15293A4582015-07-14014 July 2015 Slides for July 14, 2015 Public Meeting on Browns Ferry Seismic Risk Evaluations (MF3764 Through MF3766) CNL-15-122, Presentation Slides for Closed Meeting Extended Power Uprate (EPU) License Amendment Request2015-07-0808 July 2015 Presentation Slides for Closed Meeting Extended Power Uprate (EPU) License Amendment Request ML15146A2792015-05-21021 May 2015 Bf EOC Meeting Summary 2015 ML15099A2912015-04-22022 April 2015 4/22/2015, Enclosure 2, Slides for TVA Presentation to the NRC in Support of Steam Dryer Replacement ML14147A3222014-05-27027 May 2014 Public Meeting Summary 05/21/2014 to Present Annual Assessment 2024-08-15
[Table view] Category:Organization Chart
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24184B9162024-07-10010 July 2024 U.S. NRC Meeting Slides for Meeting with Tennessee Valley Authority Regarding NRC Questions Regarding Scope of Nuclear Quality Assurance Program ML24149A1332024-05-29029 May 2024 Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates Public Portion Meeting Slides ML24113A0962024-04-22022 April 2024 RIPE Pre-Submittal Meeting Slides ML24078A2722024-04-10010 April 2024 Subsequent License Renewal Public Scoping Meeting ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML24032A2752024-02-0707 February 2024 Pre-Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates (Slides) ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML23130A0912023-05-11011 May 2023 TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 ML23130A0332023-05-11011 May 2023 NRC Presentation Browns Ferry Subsequent License Renewal Pre-application Meeting, Environmental Overview ML23130A0922023-05-11011 May 2023 NRC Browns Ferry Nuclear Plant, Units 1, 2, and 3, Subsequent License Renewal Application, Public Meeting Slides ML23130A0302023-05-10010 May 2023 TVA Presentation Browns Ferry Nuclear Plant Subsequent License Renewal License Application – Environmental Report ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23025A0472023-01-25025 January 2023 Pre-Submittal Meeting for Proposed License Amendment Request Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves - January 25, 2023 ML22285A1902022-10-13013 October 2022 October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides ML22277A6562022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October, 2022 (TVA Slides) ML22279A8992022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October 6, 2022-TVA Slides ML22264A2332022-09-22022 September 2022 Slides for Pre-Submittal Meeting for Request to Use a Later Edition of the ASME OM Code for the Fifth Inservice Testing (IST) 10-Year Interval ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21270A0322021-09-27027 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting September 27, 2021 ML21265A0422021-09-21021 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting 09/22/2021 ML21250A3012021-09-0707 September 2021 TVA Slides for September 7, 2021, Presubmittal Meeting to Discuss Planned Browns Ferry TSTF-505 License Amendment Request ML21152A1872021-06-0101 June 2021 TVA Slides for June 1, 2021, Presubmittal Meeting to Discuss Planned Control Bay Chiller Cross-Tie License Amendment Request ML21096A1002021-04-0606 April 2021 Annual Assessments ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20156A2812020-06-0808 June 2020 TVA Slides for June 8, 2020, ATRIUM-11 Presubmittal Meeting ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20092F5742020-04-0202 April 2020 TVA Slides for Browns Ferry 50.69 License Amendment Request Presubmittal Meeting ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19120A3692019-04-30030 April 2019 Public Meeting Summary - Browns Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18158A2862018-06-0707 June 2018 May 30, 2018 Summary of Public Meeting with Browns Ferry Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status ML17212A8432017-08-0101 August 2017 Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants ML17034A3322017-02-0303 February 2017 Presentation Slides for Public Meeting Regarding Browns Ferry Extended Power Uprate License Amendment Request Transmission System Update Supplements ML16356A0342017-01-0404 January 2017 Pre-app Meeting Mellla+ LAR Final ML16341A7422017-01-0404 January 2017 Presentation Slides for Browns Ferry Pre-application Meeting Regarding Mellla+ ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16189A3482016-07-19019 July 2016 Presentation Slides for July 19, 2016, Public Meeting ML16200A2592016-07-19019 July 2016 July 19, 2016: NRC Public Meeting on Browns Ferry Nuclear Plant Extended Power Uprate License Amendment Request ML16153A1982016-06-0101 June 2016 2015 EOC Meeting Summary ML16028A0962016-02-0101 February 2016 Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal Logic, and Unit Priority Re-Trip Logic License Amendment Request ML16006A2882016-01-0606 January 2016 Significant Operational Experience: 7 Major Industry Events with Regulatory Implications ML15308A1002015-11-10010 November 2015 Public Meeting Presentation Slides Extended Power Uprate License Amendment Request NRC Public Meeting ML15293A4582015-07-14014 July 2015 Slides for July 14, 2015 Public Meeting on Browns Ferry Seismic Risk Evaluations (MF3764 Through MF3766) ML15195A1252015-07-14014 July 2015 July 14, 2015 - Public Meeting Slides on Browns Ferry Seismic Risk Insights CNL-15-122, Presentation Slides for Closed Meeting Extended Power Uprate (EPU) License Amendment Request2015-07-0808 July 2015 Presentation Slides for Closed Meeting Extended Power Uprate (EPU) License Amendment Request 2024-08-15
[Table view] Category:Status Report
MONTHYEARCNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-052, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status2022-04-27027 April 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status CNL-21-048, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Miilstone Status Update2021-04-29029 April 2021 Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Miilstone Status Update CNL-21-030, Decommissioning Funding Status Report2021-03-25025 March 2021 Decommissioning Funding Status Report CNL-21-032, Watt Bar Nuclear Plant, Units 1 and 2 - Annual Insurance Status Report2021-03-25025 March 2021 Watt Bar Nuclear Plant, Units 1 and 2 - Annual Insurance Status Report CNL-20-088, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update2020-10-29029 October 2020 Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update CNL-20-020, Annual Insurance Status Report2020-03-20020 March 2020 Annual Insurance Status Report CNL-19-015, Final Update on Progress of Facility Modifications for MSIV Leak Rate2019-05-28028 May 2019 Final Update on Progress of Facility Modifications for MSIV Leak Rate CNL-19-046, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update and Commitment Changes2019-04-29029 April 2019 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update and Commitment Changes CNL-18-136, Plants: Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update2018-12-27027 December 2018 Plants: Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update CNL-19-135, Tennessee Valley Authority Browns Ferry Nuclear Plant - Ninth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe2018-12-27027 December 2018 Tennessee Valley Authority Browns Ferry Nuclear Plant - Ninth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe . CNL-18-084, Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-06-27027 June 2018 Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions CNL-18-093, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update2018-06-22022 June 2018 Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update CNL-18-025, Annual Insurance Status Report2018-03-28028 March 2018 Annual Insurance Status Report CNL-18-017, Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2018-02-23023 February 2018 Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events CNL-17-138, Plant'S Seventh Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Plant'S Seventh Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions CNL-17-107, Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049)2017-08-31031 August 2017 Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049) CNL-17-077, Sixth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109)2017-06-30030 June 2017 Sixth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109) CNL-17-072, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update2017-06-27027 June 2017 Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update CNL-17-031, Annual Insurance Status Report2017-03-30030 March 2017 Annual Insurance Status Report CNL-17-021, Decommissioning Funding Status Report2017-03-30030 March 2017 Decommissioning Funding Status Report CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2017-02-28028 February 2017 Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) CNL-16-182, Fifth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2016-12-22022 December 2016 Fifth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions CNL-16-132, Seventh Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-08-26026 August 2016 Seventh Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events CNL-16-098, Fourth Six-Month Status Report in Response to the June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2016-06-30030 June 2016 Fourth Six-Month Status Report in Response to the June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions CNL-16-036, Sixth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) CNL-15-254, Third Six-Month Status Report and Phase 1 and Phase 2 Overall Integrated Plan in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation.2015-12-29029 December 2015 Third Six-Month Status Report and Phase 1 and Phase 2 Overall Integrated Plan in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation. CNL-15-160, Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) CNL-15-159, Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) CNL-15-082, Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2015 Status Report2015-04-30030 April 2015 Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2015 Status Report CNL-15-036, Fourth Six-Month Status Report in Response to the March 1, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to the March 1, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) CNL-15-035, Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) CNL-15-018, Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2015 Status Report2015-01-30030 January 2015 Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2015 Status Report CNL-14-222, First Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.2014-12-19019 December 2014 First Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident. CNL-14-195, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2014 Status Report2014-10-31031 October 2014 the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2014 Status Report CNL-14-132, Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Bro2014-08-28028 August 2014 Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Brown CNL-14-063, the Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2014 Status Report2014-04-30030 April 2014 the Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2014 Status Report CNL-14-032, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-28028 February 2014 Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) CNL-14-028, Second Six Month Status Report in Response to Order No. EA-12-051, Spent Fuel Pool Instrumentation2014-02-28028 February 2014 Second Six Month Status Report in Response to Order No. EA-12-051, Spent Fuel Pool Instrumentation CNL-14-008, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2014 Status Report2014-01-31031 January 2014 the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2014 Status Report ML13093A3702013-04-0101 April 2013 Annual Insurance Status Report ML12354A1112012-12-14014 December 2012 Generic Letter 96-05 Class D Joint Owners' Group Motor Operated Valves ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML1009500642010-04-0101 April 2010 Annual Insurance Status Report ML0909302852009-04-0101 April 2009 Watts Barr (WBN) Nuclear Plants - Insurance Status ML0713400902007-05-12012 May 2007 (BFN) - Completion of Unit 1 Restart Issues 2024-03-27
[Table view] |
Text
(7.1 C7--Li 7 :7 vx- u~:r:- rz r r 7 1. i.-
r-77
[7 Err-r ma TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT L
- ~
_________________________ I' F
._:d_ __ _ _ _ ____ __ ______ ._ ___;___t_______.-..'__ "z"'^;'
,,_ -b ___s
_ Sgg.,. @>.*A 14I t-ib r .5.-25.5H0 O%5A.5;,.5n:' ~ '
r I I- U--- ' -- I- F- -' F - F--- Fv U-w
- I-* ' F1- (---' U- [-
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNIT 1 STATUS Rockville, Md.
September 9, 2004
I ~II - F- I FI I - -- F- (U ( F- I( , I, Fr - ---
F--
Agenda
- Unit 1 Organizational Changes J. Rupert
- Regulatory Status T. Abney
- Unit 1 Overview and Schedule J. Rupert J. Valente R. Drake
- Nuclear Assurance R. Baron
- Open Discussion Jon Rupert 2
I V F- - I- r--- r(---
F --- Fr- F-,-- I--- [--~-
Introduction
- Welcome to the Fourth Periodic Status Meeting for the Unit 1 restart project
- Status of project
- Upcoming activities
- Solicit feedback J. Rupert 3
( [r[ I - I -.- r--- --- I r- - I' - 1 -
(- ( -- lI--- -
Unit 1 Organizational Changes TVAN TVAN Nucfear Licensing Assurance Manager General Manager
,I Igil Nuclear Licensing Assurance Manager Manager Tim Abney Raul Baron Changes highlighted.
Jon Rupert 4
( *. [-- F- - (-- F- F-- f - -- F- - f-- (,--, (,-, - I' --- (---, ( - ( - - F--- r--
Regulatory Status
- Unit 1 License Amendments
- 20 amendments identified
- 17 of the 20 have or will have been previously submitted and/or approved on Units 2 and 3
- 12 submitted to date o Includes Extended Power Uprate - submitted June 28, 2004
- 1 approved by NRC
- 5 relief requests submitted
- 4 approved by NRC
- Risk informed ISI to be submitted
- Other relief requests may be identified as a result of inspections
- Submitted December 31, 2003 Tim Abney 5
I 1 1 1 1 1 I I I 1 I 1 1 1 1 1 1 Regulatory Status Status of Technical Specifications and Relief Requests 30 25 -I-z0(
O X 20 a u rL a o w NA Xus~ 15 ELn U.
X U) .
04
_ a 10 I Z
.4 5
0 r Z C- ° C- Z '° C- C- C- Z D)
CO - Z CD 0 Cw w £ D 00C ~ g . C
O 6 0 CD co CD 6 0 0 o P~ o 6 0C 6 6 01 6 0 o o 0 o SUBMI-rAL DATE G Actual Number Remaining - - - - Scheduled
- NRC Approvals Remaining Tim Abney 6
'QC I
(--- - ( . - 1. F---- I --- a ri r--- I -- F-- U- ( rr [F rV ( U-- (
V t7--
F F Regulatory Status Other Unit 1 Submittals
- 82 programmatic and completion submittals identified
- From overall Regulatory Framework o Submitted December 2002 o Approved August 2003
- Agreed to notify NRC upon the completion of Bulletins, Generic Letters, TMI Action Plan Items, or Nuclear Performance Plan Special Programs
- 12 submitted to date
- None NRC approved Tim Abney 7
I I 1 1 1 I I I I I I I I I I Regulatory Status Status of Other Submittals 100 -
90 Oz 70 -
04 2 60- -- - - - -
E50 40 -
z co30-Lu 20 o
0 1 0
° ° 0- °> °000 ° °Z ° ° CD c C, 0 '
w
' a . 0 (c CD
. 0 I ° 0 C° Uc 0 z SUBMITTAL DATE
-Actual Number Remaining - - - - Scheduled
-~NRC Approvals Remaining Tim Abney 8 CO -z
F -- r r r- - -- F- ( 7
-, -- f (,--- , ( "--- r, - F , I- - [- F__
Unit 1 Overview and Schedule
- Project Schedule (Attached)
- On schedule for start-up May 2007 Jon Rupert 9
(-
I I -(--
F r- - F--- I--- F__ I---- f-' f ____ f ' I [rF ( 77---- I- r-F r--
Unit 1 Overview and Schedule Engineering
- Current status o Design Change Notices issued o Overall 75 percent complete
- Ongoing activities o Primarily in a field support role o Closures o Completing System Plant Acceptance Evaluations (SPAE) and System Pre-operability Checklists (SPOCs)
- Extended Power Uprate Analyses o Steam dryer o Main steam lines o Vessel internals Joe Valente 11
( - F- - I( --l l f --- -- I--- Fr- - V
[--- (-
(-- 1[
Unit 1 Overview and Schedule
- Modifications and Maintenance Status
- Replaced o Drywell structural steel o Core Spray piping o Reactor Pressure Vessel safe ends o Condenser tubes o Turbine cross-over and cross-under piping o Extraction Steam piping o Flow assisted corrosion susceptible piping (Carbon steel with chrome-moly)
- RCIC turbine reassembly Rick Drake 12
(-- (- in-r [i --- -- a-- F-- I---- r--, ,F - [I , (__ I-Unit 1 Overview and Schedule Major Work In-progress
- Cable tray, conduit and support installation
- Large and small bore pipe replacement
- Pipe hanger installation
- Large pump and motor refurbishment
- Torus coating
- Control Room Design Review modifications
- Turbine generator rewind
- Main Bank transformers
- Industrial safety
- Welding Rick Drake 13
I --- F --- (-,--- F--- ( [I--II--[-- ( I V (--- I r-Unit 1 Overview and Schedule
- Status of Major Commodities COMMODITY INSTALLED TOTAL Piping - Large Bore 5, 948 feet 12,466 feet Hangers - Large Bore 524 1,586 Piping - Small Bore 2,527 feet 24,177 feet Hangers - Small Bore 755 5,461 Conduit 25,540 feet 152,187 feet Conduit Supports 3,984 16,251 Cable Tray 7,695 feet 9,101 feet Cable Tray Supports 1,310 1,430 Rick Drake 14
( __ - ( . - F_.__ C_ (___-, (,--- F____ I- I I -,- ( -,
Operations
- Barriers
- Personnel identification
- Physical access accommodations
- Training
- Unit color codes
- Unit 1 equipment required for Unit 2/3 operation identified
- No trips or power reductions caused by Unit 1 work
- Comprised of qualified and site experienced personnel
- Coordination with operating units Work Control and Operation
- Completing System Pre-operability Checklists (SPOCs)
- Process flow chart attached R.G. Jones 15
F- - r - U-7 r--
F r--- r - ---- V-- I- -F_ r I ( --- V--- F77 U---
Operations
- Preparing for Baseline, Restart and Power Ascension Test Programs
- Staffing / training to support three unit operations
- Adding a second simulator
- Dose Reduction Activities
- Decontaminated Drywell, Reactor and Turbine Buildings
- Gamma scan to identify and system flushing to reduce hot spots
- Replacement of CRD and low pressure turbine blades and 77 other components containing stellite
- Electro-polish and chrome plate 17 valves and 2 RWCU pumps
- Electro-polish and pre-oxidize Recirc. and RWCU piping and RWCU regenerative heat exchangers R.G. Jones 17
(' -, Ir --
- Ur-7 roC7--r~~ r-- [~- Fr--- F7--- [- - r - at- (7--- f- ( - I.- -.
Nuclear Assurance Shift in Emphasis
- Established and filled a new QA Manager position
- Increased QC staffing, including Level IIl technical support
- Established QC Level Ill oversight support
- QA staffing and skill set strengthened
- Dedicated resources to corrective action program oversight
- Reinforced Expectations and Strengthened Approach
- Quality Assurance
- Quality Control Raul Baron 18
- I r-- - F -- ri - - -7 r-- - [a--- 1-- [--
-- ri- I- f'- rig--- r-- U---
Nuclear Assurance
- Nuclear Performance Plan Special Programs (DBVP, seismic issues, electrical issues, etc.)
- Vendor performance / source surveillance
- Modification / Construction field activities
- SPAE/SPOC 19 Raul Baron
f ( -.-,- r I 7*~[ [
-~ F-- fl- V- F-- rF* r,-,- -- '
F--, F-Open Discussion 20