Category:Letter type:L
MONTHYEARL-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 2024-01-08
[Table view] Category:License-Operator
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23191A8622023-07-10010 July 2023 301 Exam ADAMS 2B Administrative Items L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements ML23356A1592023-03-17017 March 2023 Final QA Related Forms NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter ML22237A2022022-08-25025 August 2022 Notification of Licensed Operator Initial Examination 05000250/2023301, and 05000251/2023301 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21307A2892021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21298A1492021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-9 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21256A1412021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-5 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 2024-01-22
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23191A8622023-07-10010 July 2023 301 Exam ADAMS 2B Administrative Items L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23356A1592023-03-17017 March 2023 Final QA Related Forms NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter ML22237A2022022-08-25025 August 2022 Notification of Licensed Operator Initial Examination 05000250/2023301, and 05000251/2023301 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21256A1412021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-5 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21298A1492021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-9 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist 2024-01-22
[Table view] |
Text
April 20, 2022 L-2022-065 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Re: NRC Regulato1y Issue Summa1y 2022-01, "Preparation and Scheduling of Operator Licensing Examinations;" Request for Comment Florida Power & Light Company, the licensee for St. Lucie Nuclear Plant, Units 1 and 2 and Turkey Point Nuclear Plant, Units 3 and 4, on behalf of itself and its affiliates, NextEra Energy Seabrook, LLC, the licensee for Seabrook Station; and NextEra Energy Point Beach, LLC, the licensee for Point Beach Nuclear Plant, Units 1 and 2, offers the attached response (Enclosure) to NRC Regulatory Issue Summa1y 2022-01, "Preparation and Scheduling of Operator Licensing Examinations," dated February 17, 2022 (ML21361A026).
Should you have any questions regarding this report, please contact Mr. Steve Catron, Fleet Licensing and Regulato1y Compliance Director, at (561) 304-6206.
Very truly yours,
~~
General Manager, Regulatory Affairs Florida Power & Light Company Enclosure (1)
Cc: USNRC Regional Office, Operations Branch, Region I USNRC Regional Office, Operations Branch, Region II USNRC Regional Office, Operations Branch, Region III Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408
Enclosure to L-2022-065:
Comments on NRC FORM 536
NR,C,FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3160-0131 EXPIRES: 01/31/2024 (01-2021)
~f>""R I\EotJ,.,>.
Estimaled burden per response to comply with this voluntary lnfonnation collection requesl: 45 minutes.
~ 01\ This information collection Is used to plan budgets and resources for operator examinations. Send
{
f i OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory Commission, Washing Ion, DC 20555-0001, or by e-mail lo
\;~
"'}<> '"
- ,/"
EXAMINATION DATA lnfocollects.Resource@nrc.gov, and the 0MB reviewer al: 0MB Office of lnfonmation and Regulatory Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, q*****" Washington, DC 20503; e-mail: olra subrnission@omb eop gay. The NRC may nol conduct or sponsor, and a person Is not required to respond to, a collection of Information unless the document requesting or requiring the collecllon displays acurrently valid 0MB control number.
FACILITY NRG REGION St. Lucie Nuclear Plant, Units 1 and 2 Dockets 50-335 and 50-389 !Region II I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2023 CY 2024 CY 2025 cy2026 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS
- 8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2023 CY2024 CY2025 CY2026 NUMBER OF REACTOR OPERATORS 10 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 7 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 08/07/2023 12/02/2024 ALTERNATE DATE 09/11/2023 01/13/2025 NRC FORM 536 (01-2021)
NRG-FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2024 (01-2021)
~CJ~n REou<..,Jo:
Estimated burden per response lo comply with this voluntary inf01TI1ation collection request: 45 minutes.
f l
ot.
11, OPERATOR LICENSING This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate lo the FOIA, library, and Information Collections Branch (T-6
\; "' EXAMINATION DATA A10M}, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail lo
~'(,,+-, +O I lnfocollects.Resource@nrc.gov, and the 0MB reviewer al: 0MB Office or Information and Regulatory Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 72517th Street NW,
- "' Washington, DC 20503; e-mall: oira submlssion@omb eop gov The NRC may not conduct or sponsor, and a person Is not required to respond to, a collection of Information unless the document requesting or requiring the collection displays acurrently valid 0MB control number.
FACILITY NRCREGION Turkey Point Nuclear Plant, Units 3 and 4 Docket Nos. 50-250 and 50-251 !Region II I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2023 CY 2024 CY 2025 cy2026 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2023 CY2024 CY2025 CY2026 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 5 8 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 12 11 12 12 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES '
PRIMARY DATE 03/20/2023 06/17/2024 02/03/2025 07/06/2026 ALTERNATE DATE 04/24/2023 07/08/2024 03/03/2025 08/10/2026 NRG FORM 536 (01-2021)
NRCFORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2024 (01-2021) Estimated burden per response to comply 1-.ilh this voluntary Information collection request 45 minutes.
- ,fJ.,pRftE"ot,,-,/'
This Information collecUon is used to plan budgets and resources for operator examinations. Send l
~
is OPERATOR LICENSING comments regarding burden estimate to lhe FOIA, Library, and Information Collections Branch (T-6
~ : EXAMINATION DATA A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and lhe 0MB reviewer at 0MB Office of Information and Regulatory
\:.,""" ,,,I Affairs, (3150--0131), Attn: Desk Officer for lhe Nuclear Regulatory Commission, 725 17th Street NW,
"'***j< Washington, DC 20503; e-mail: oira submission@omb eop goy. The NRG may not conduct or sponsor, and a person ts not required to respond to, a collection of Information unless the document requesting or requiring lhe collection displays acurrently valid 0MB control number.
FACILITY NRG REGION lseabrook Station, Docket No. 50-443 I !Region I I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2024 CY 2025 CY 2026 cy2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2024 CY2025 CY2026 CY2027 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 7 8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 7 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE NIA 02103/2025 NIA 0310112027 ALTERNATE DATE NIA 0310312025 NIA 0410512027 NRG FORM 536 (01-2021)
NRC,FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2024 (01-2021) Estimated burden per response to comp~ with this voluntary lnformaUon collecUon request: 45 minutes,
~v,.J>" nro11,.,>.:
l 0-e. OPERATOR LICENSING This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 t;t 4
IC II
~ EXAMINATION DATA A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and the 0MB reviewer at: 0MB Office or Information and Regulatory
,;;+,, ~o~ Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 72517th Street NW,
- Washington, DC 20503; e-mail: olra submlssion@omb eop goy, The NRC may not conduct or sponsor, and a person Is not required to respond to, a collection of Information unless the document requesting or requiring the collection displays a currently valid 0MB control number.
FACILITY NRCREGION Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-286 and 50-301, Renewed License Nos. DPR 24 and DPR 27 !Region Ill I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2023 CY 2024 CY 2025 cy2026 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2023 CY2024 CY2025 CY2026 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 9 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 02/13/2023 03/04/2024 07/14/2025 ALTERNATE DATE 03/06/2023 03/28/2024 07/28/2025 NRC FORM 536 (01-2021)